ML20054D988

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 70-0025/82-02 on 820301-02 & 15-19. No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Measurement Control Program & Loss Mechanism Analysis.Details Withheld (Ref 10CFR73.21)
ML20054D988
Person / Time
Site: 07000025
Issue date: 04/12/1982
From: Brock B, Narderhaugl R, Nelson G, Norderhaug L, Wieder A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20054D980 List:
References
70-0025-82-02, 70-25-82-2, NUDOCS 8204230569
Download: ML20054D988 (1)


Text

.. The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790 U.S. NUCLEAR REGLATORY COMMISSION REGION V Report No.

70-25/82-02 (SG)(IE-V-485)

Docket No.

70-25 License No.

SNM-21 Safeguards Group 1 Licensee:

Energy Systems Group, Rockwell International 8900 DeSoto Avenue Canoga Park, California 91304 Facility Name:

Energy Systems Group, Atomic International Inspection at:

Headquarters, DeSoto Facility Inspection conducted:

March 1-2.and 15-19, 1982 Date of Last Material Control and Accounting Inspection: October, November, & December 4,1981 Type of Inspection:

Unannounced, Material Control and Accounting A

Inspectors:

/.

,N 1 son, Chemist Date Signed G

/ X. f Wieder, Safeguards Auditor

/ Dat'e Signed M Ldu 4/W)t:L B. L. Br c Chem st ~,

Date Signed

[//p/ C1.-

Approved by:

(.

4 o

/(."R."NdrdeEhai/g, Chlef, SafegIDiirTs%e%IP Date Signed Inspection Summary:

(

Areas Inspected:. Routine safeguards inspection of facility organization and operations, measurement control program, shipper-receiver verification, loss' mechanism analysis, records and reports, follow-up on item of noncompliance,-and independent safeguards inspection effort.

The inspection involved 89 inspector-hours onsite by three inspectors.

Results:

There were no items of noncompliance within the eight areas inspected.

820423o N