IE Safeguards Insp Rept 70-1113/82-07 on 820408.No Noncompliance Noted.Major Areas Inspected:Measurements, Measurement Control Program & Followup on Previous Insp Findings.Encl Withheld (Ref 10CFR73.21)
ML20054D781
Person / Time
Site: 07001113
Issue date: 04/07/1982
From: Bates J, Mcalpine E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20054D776 List:
References
70-1113-82-07, 70-1113-82-7, NUDOCS 8204230380
Download: ML20054D781 (1)


Text

-

"o^la'n'!.^e"43;ms""

c

'o,

UNITED STATES 3,

NUCLEAR REGULATORY COMMISSION g

a REGION Il 101 MARIETTA ST., N.W., SUITE 3100 o

ATLANTA, GEORGIA 30303 APR 0 81982 Report No. 70-1114/82-07 Docket No. 70-1113 Safeguard Group No. III Licensee:

General Electric Company Wilmington, NC 28401 Date of Inspection: -March 15-18, 1982 Type of Inspection:

Unannounced Material Control and Accountability Inspector Q, W sM

//!8!P(

J. W. BatVs, Senior Safeguards Chemist Dat/ Si'gned Approved by:

(

M hwu 4/ 7[7L E. J. McAlp'rie, Chief,\\ Material Control and Date Signed Accountability Section Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Inspected: Measurements; Measurement Control Program; and Followup on Previous Inspection Findings.

The inspection involved 31 inspector hours on site by one NRC inspector and was begun during the regular hours.

Results: The licensee was found to be in compliance with NRC requirements in the three areas examined during the inspection.

S-F2 $ 1 hS.

Copy W of 45 Copies f/

Pages This Document is not to be reproduced without speciff o gC approval of IE II ~

MATitIAL TRANWITTfo HIEFWITH CONTAINS 2J9o lhfCRA% TION