ML20054D781
| ML20054D781 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 04/07/1982 |
| From: | Bates J, Mcalpine E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML20054D776 | List: |
| References | |
| 70-1113-82-07, 70-1113-82-7, NUDOCS 8204230380 | |
| Download: ML20054D781 (1) | |
Text
-
"o^la'n'!.^e"43;ms""
c
'o,
UNITED STATES 3,
NUCLEAR REGULATORY COMMISSION g
a REGION Il 101 MARIETTA ST., N.W., SUITE 3100 o
ATLANTA, GEORGIA 30303 APR 0 81982 Report No. 70-1114/82-07 Docket No. 70-1113 Safeguard Group No. III Licensee:
General Electric Company Wilmington, NC 28401 Date of Inspection: -March 15-18, 1982 Type of Inspection:
Unannounced Material Control and Accountability Inspector Q, W sM
//!8!P(
J. W. BatVs, Senior Safeguards Chemist Dat/ Si'gned Approved by:
(
M hwu 4/ 7[7L E. J. McAlp'rie, Chief,\\ Material Control and Date Signed Accountability Section Technical Inspection Branch Division of Engineering and Technical Programs Inspection Summary Areas Inspected: Measurements; Measurement Control Program; and Followup on Previous Inspection Findings.
The inspection involved 31 inspector hours on site by one NRC inspector and was begun during the regular hours.
Results: The licensee was found to be in compliance with NRC requirements in the three areas examined during the inspection.
S-F2 $ 1 hS.
Copy W of 45 Copies f/
Pages This Document is not to be reproduced without speciff o gC approval of IE II ~
MATitIAL TRANWITTfo HIEFWITH CONTAINS 2J9o lhfCRA% TION