ML20054D774

From kanterella
Jump to navigation Jump to search
Forwards Revision 4 to Response to IE Bulletin 79-01B, Environ Qualification of Electrical Equipment. Revision Changes Qualification Status of Certain Limitorque Motor Operated Valves from Qualified to Open Item.W/O Encl
ML20054D774
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/10/1982
From: Head G
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820, REF-SSINS-SSINS-6 IEB-79-01B, IEB-79-1B, TAC-42405, TAC-42406, NUDOCS 8204230374
Download: ML20054D774 (1)


Text

_

nwaar%4cc m ,

% 3 f-' * : M >'4,t ,

A ama n, o ,m7 h e H=

mq _

M : r. 7 A e 7,]"{**9" February 10, 1982

/' r r , p- ' ,

G.F. Head O. 3y

[', N g

U. S. Nuclear Regulatory Commission

REFERENCE:

S g Office of Inspection and Enforcement RII: JPO RECEWED Region II - Suite 3100 50-321/50-366 - "

101 Marietta Street, NW Atlanta, Georgia 30303 I&E Bulletin 79-018 t APR 221982>

a sata asuut sumen i.

% nec j ATTENTION: Mr. James P. O'Reilly GENTLEMEN:

As p

In accordance with the requirements of I&E Bulletin 79-018,

" Environmental Qualification of Electrical Equipment", Supplement 3, dated October 24, 1980, and in keeping with our desire to keep the NRC supplied with current information, Georgia Power Company hereby submits the attached Revision 4 to the response for Plant Hatch - Units 1 and 2.

This revision reflects the change in qualification status of certain Limitorque motor operated valves from qualified to open item, based on Limitorque's letter dated September 1, 1981. Additionally 2P52-PS N002, 2PS2-MOV F565 and associated electrical equipment are Seing added as a result of a check of the Emergency Operating Procedures review equipment list.

Current progress in the qualification or replacement of the equipment in the report is not reflected in this revision. Through periodic letters, GPC will continue to keep you informed of our qualification / replacement progress. These changes will be reflected in a later revision of the

" Environmental Qualification of Class lE Electrical Equipment" submittal.

If you have any further questions, please contact this office.

G. F Head states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.

GEORGIA POWER COWANY By: h, ?, /

G. F. Head l Sworn to and subscribed bef e me this loth day of February, 1982.

//M Notary Public, Georgia, State at t.arge l '

/l;

  • d/(/(//_) My CommlSSKm Expires Sept. 20,1983 Notary Public l BDW/mb Enclosure xc: M. Manry 820423 0 3 7f R. F. Rogers, III J. P. O'Reilly, (NRC - Region II) (( g t