Informs That Seismic Reanalysis of Five Valves,Per IE Bulletin 79-14,will Be Completed by Aug,1982
ML20054D746
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/12/1982
From: Withers B
PORTLAND GENERAL ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-SSINS-6820 IEB-79-14, NUDOCS 8204230344
Download: ML20054D746 (1)


Text

Bulletin Reply 79-11+

Docket No. 50-3W

~

Portland Gereral Electric Coripariy 1

Id lw m nt

G

[i, er D ::

~

m PJ April 12, 1982

-.:, y J. l Trojan Nuclear Plant s @c-

~"

Docket 50-344 m

License NPF-1 g

.y Mr. R.11. Engelken, Director A

U. S. Nuclear Regulatory Commission g

Region V Creekside Oaks Office Park S'

1450 Maria Lane RECE!VED Suite 210 Walnut Creek, CA 94596-5368 P_:

APR22 g. i 5asma agg NN

Dear Mr. Engelken:

q, g

//

IE Bulletin 79-14 g

Seismic Analyses of Safety-Related Piping Sys PGE's supplementary letter of December 28, 1981 in response to IE Bulletin 79-14 committed to provide the results of seismic reanalysis of nine valves by April 1982. Four valves have been reanalyzed to demon-strate their acceptability without modifications.

However, due to difficulty in seismic calculations, the reanalysis of the remaining five valves has not been completed to date.

It is currently expected that the reanalysis of the remaining five valves will be completed by August 1982, at which time PGE will provide a complete result of the reanalysis of all nine valves including a description of modifications, if any.

Sincerely, Bart D. Withers Vice President Nuclear i

c:

Mr. Robert A. Clark, Chief Operating Reactors Branch No. 3 Nuclear Regulatory Commission l

Mr. Lynn Frank, Director 1

l i

State of Oregon l

Department of Energy 8204 23 0 3 W IEll l

121 S.W Sa! mon Street. Poritand. Oregon 97204 1 0