ML20054D621

From kanterella
Jump to navigation Jump to search
Notice of Issuance & Availability of Amend 57 to License DPR-35
ML20054D621
Person / Time
Site: Pilgrim
Issue date: 03/20/1982
From: Vassallo D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20054D617 List:
References
NUDOCS 8204230203
Download: ML20054D621 (2)


Text

._

7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-293 BOSTON EDISON COMPANY NOTICE OF ISSUANCE OF AMENDMENT TO FACILITY OPERATING LICENSE The U.S. Nuclear Regulatory Commission (the Commission) has issued Amendment No. 57 to Facility Operating License No. DPR-35 issued to Boston Edison Company (the licensee) which revised the Technical Specifications for operation of the Pilgrim Nuclear Power Station (the facility) located near Plymouth, Massachusetts. The amendment is effective as of the date of issuance.

The amendment modifies the Technical Specifications pertaining to

1) reporting requirements for the radiological environmental surveillance program data, 2) the table of primary containment isolation valves,
3) surveillance requirements performed on the automatic depressurization system from the alternate shutdown panel, and 4) surveillance requirements for the control room high efficiency air filtration system.

The application for amendment complies with the standards and require-ments of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations. The Commission has made appropriate l

findings as required by the Act and the Commission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment.

Prior public notice of this amendment was not required since it does not involve a significant hazards consideration.

82042.tae

~

=.

  • a.e The Comission has detemined that the issuance of this amendment will not result in any significant environmental impact and that pursuant to 10 CFR Section 51.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of the amendment.

For further details with respect to this action, see (1) the application for amendment dated February 23,1982,(2) Amendment No. 57 to License No.

DPR-35, and (3) the Comission's letter to the licensee dated March 20,1982.

,All of these items are available for public inspection at the Comission's Public Document Room,1717 H Street, N.W., Washington, D.C, and at the Plymouth Public Library on North Street in Plymouth, Massachusetts 02360. A single copy of items (2) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Comission, Washington, D.C.

20555, Attention:

Director, Division of Licensing.

Dated at Bethesda, Maryland, this 20th day of March 1982.

FOR THE NUCLEAR REGULATORY COMMISSION Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing

a p., >m l

se ev

.e

- - mw e vem-m.

ue e-e

=

=

c-