Summary of 820106 Meeting W/Util,Sargent & Lundy & Power Consultants in Bethesda,Md Re Fire Protection Program
ML20054D487
Person / Time
Site: Byron  
Issue date: 03/16/1982
From: Chesnut S
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8204230056
Download: ML20054D487 (4)


Text

y u

v v

c;

.e.

MAR 161982

~y

+

e 0

Y Docket Hos.:

STH 50-454 and STH 50-455

'l_ "

\\

Viir p c Q '

\\-

6' t5 r 3

b I Q),'--/

APPLICA?lT: Comonwealth Edison Company v;.

FACILITY:

Byron Station 0

/

SUBJECT:

SU:tiARY OF FIRE PROTECTION MEETING C.

A meetinq was held January 6,1982 in Bethesda, fiaryland with representatives from Coanonwealth Edison Conpany to discuss the applicant's fire protection program for the Byron Station. A list of attendees is given in Enclosure 1.

The following topics were discussed:

1.

Class A circuits for fire detection systens (resolved);

2.

Fire-rated penetration seals (resolved);

3.

Snoke detectors for control roon (resolved);

4.

Sprinklers in cable screading room (applicant and staff disagreement; iten is unresolved);

5.

Oil collection system for reactor coolant ou9ps (applicant and staff disagreenent; item is unresolved);

6.

Fire protection features for safe shutdown systems (applicant agreed to respond to staff concerns);

7.

Administrative controls and fire brigade (applicant agreed to respond to staff concerns);

8.

Technical Specifications (applicant agreed with staff concerns, will review in detail with all Tech Specs);

9.

Appendix R coqnitments (aoplicant co9nitted with several exceptions).

liith regard to the applicants position that the RCP oil collection systen is not needed for Byron Station, the staff indicated that additional information was needed to complete its evaluation. The additional information required is listed in Enclosure 2.

i&

i)

Steve Chesnut, Project Blanager Licensing Branch No. 1 Division of Licensing

Enclosures:

As stated cc:

See next paqe

/\\ f8 4 DL Bel DLRfF e HE6 o"'">

y.t

.a...

.3.yop.n!I.. od

..v' As/*.dofo.

u:m. r) sc snut/.y.t 1

b om s 3

/82 3/lb/J2

[(71/

B20423003b B20316

.\\

E WFICIAL RECORD COPY

"-328

  • Mr'. Louis 0. DelGeorge Driector of Nuclear Licensing Commonwealth Edison Company Post Office Box 767 Chicago, Illinois 60690 cc: Mr. William Kortier Mr. James G. Keppler Atomic Power Distribution U. S. NRC, Region III Westinghouse Electric Corporation 799 Roosevelt Road Post Office Box 355 Glen Ellyn, Illinois 60137 Pittsburgh, Pennsylavania 15230 Paul M. Murphy, Esq.

Isham, Lincoln & Beale One First National Plaza 42nd Floor Chicago, Illinois 60603 Mrs. Phillip B. Johnson 1907 Stratford Lane Rockford, Illinois 61107 Ms. Bridget Little Rorem Appleseed Coordinator 117 North Linden Street Essex, Illinois 60935 Dr. Bruce von Zellen Department of Biological Sciences Northern Illinois University DeKalb, Illinois 61107 Mr. Edward R. Crass Nuclear Safeguards and Licensing Division Sargent & Lundy Engineers 55 East Monroe Street Chicago, Illinois 60603 Myron Cherry, Esq.

Cherry & Flynn Suite 3700 Three First National Plaza Chicago, Illinois 60602 Mr. William Fourney U. S. Nuclear Regulatory Commission Byron / Resident Inspectors Office 4448 German Church Road Byron, Illinois 61010 Ms. Diane Chavez 602 Oak Street, Apt. #4 Rockford, Illinois 61108

W Fire Protection Meeting January 6, 1982 Attendees NRC V. Benaroya P. Sears S. Chesnut K. Kiper J. Stang Commonwealth Edison Company K. Ainger L. Bower J. Westermeier T. Joyce Power Consultants J. LaVallee Sargent & Lundy R. Salsbury

y 011 Collection System Additional Information To complete the staff's evaluation of the applicants position on the Oil Collection System the following information should be provided.

a.

Additional ALARA considerations associated with RCP maintenance caused by the installation of an oil collection system.

Data should be based on experience at other Commonwealth Edison plants.(Zion).

b.

Design information on the RCP oil lubrication system including the probable amounts and the locations or equipment affected by oil leakage.

c.

Analyses of the effect on safety related equipment of a fire caused by RCP oil leakage.

MEETING

SUMMARY

DISTRIBUTION Docket File G. Lear NRC PDR MAR 161982 W. J hnston Local PDR S. Pawlicki TIC /NSIC/ Tera V. Benaroya Z. Rosztoczy LB#1 Reading W. Haass H. Denton/E. Case D. Muller R. Ballard D. Eisenhut/M. Jambor W. Regan R. Mattson B. J. Youngblood A. Schwencer F. Congel F. Miraglia

0. Parr J. Miller F. Rosa G. Lainas W. Butler R. Vollmer J. P. Knight R. Houston R. Bosnak F. Schauer L. Rubenstein R. E. Jackson T. Speis Project Manager SChesnut M. Srinivasan Attorney, OELD J. Stolz M. Rushbrook S. Hanauer 0IE (3)

W. Gammill ACRS (16)

W. Minners F. Schroeder E. Adensam D. Skovholt M. Ernst NRC

Participants:

L. Hulma'n C. Berlinger K. Kniel VBenaroya G. Knighton PSears A. Thadani SChesnut KKiper J, Kramer JStang I

D. Ziemann i

bcc:

Applicant & Service List l