O, st ANaasa ecam jo' ;ua im GINteu 5dwCE.S AD..usseas,0N AMENDMENT OF SOI.lCITATION/ MODIFICATION OF CONTRACT e w;q nG.;C. i.is ici
-]
7 etGut5ilsON/Pu CMA5E 8 tout $7 NO
- d. PROJtCT NO (f[ /'p/n.Alf A
,I. 4,w f Mw t N7 / MOD,r CAf 8QN NO.
- 2. if f tCitYt Caff 3
e 0_ne (1 )
12/2/81 RFPA ADM-82-399 s e55uto n Coor
& Ac-Suno er uf.,u,,i. u.a 3, Coot [
U.S. Nuclear Regulatory Commission Division of Contracts Washington, DC 20555
- 1. CONTiAC10e CODE l l
FACILJTY CODE l S
AmtNDm!NT OF Nim! AND ADD 8tS5 h 50 LICIT AteON NO.
f-7 Racal Vikonics, Inc.
DAnD
,5~ u-4 n on~'. an.
1151 Seven Locks Road MODetCAT10N OF se. rte. ss.ss.
N in RP-ago a zie Rockville, MD 20859 o CONuacuo.Dt NO.
Cari L
J pan,12/2/81
,s_ y.4 n,
9 TMis BLOCa A.Put5 ONLY 10 AutNDutNTS OF 50 licit AttON5 Ts.
O. O -
.<. O -
0 '. ~ -.. -.~ '
... m. w.a > > -
~...........,.,.,,o<...,,.,,,,.,
O a..
.....,,,.~.m..,s.s,.,......~a~.,...,..m.......ba;..mi,..i.-.........
.,s,.
%.ne......,,6,,, ne, e, m,...c o....g.
e..., nomb.
F AILUE! OF, Opt ACENOWLEDGem!NT TO Bf etCilV!D AT THE ISSU NG Off,CE PRION TO TME MO o r..
..a..
DATI 57tCIHtD a Av etsutt IN st>tCTION Of 70Un Oerta. es, by..no..I th.
.d-w y.= de.e %.h.a..a. Ae
.l..er..pa..*e d, h.%
.e m.y b. mod. b y *. l....*
.e tems.,
...eed. h
.e ge.s=., l......... e,de.ence s. the
).c h.n
,d me..-enome.e, d
.+.ew.d p
- e.pe%.n, h
.ad d e er.ecded.
- 10. ACCou*direG AND A Pre ope 6AfiON DATA (if reg.. red)
N/A H
- 11. TMis B CCa APPLIES ONLY 10 MOD *PiCAf TONS OF CONTRACT 5/ORDets m o T..C ~.. O.......
.~..
o
- r. Cs 6 a in. -
, o..a
.oi m O i...w
..e,.....-a.r.<
...s....
..r....
....o
,,,,,u.oin.
mutua1 aareement of the parties m 8 T,..5
..,~
iA,...
...a
,.,,,..., xgxxy i, w.r..,...
.a.....
.. w.a 32.
12 DE SCR'/1 SON OF AME NDut NT / mOOP acA1 SON The above numbered contract is modified as set forth below:
1.
Article I, Supplies / Services and Prices, Paragraph I, Required Equipment, Item No.1,
" Central Controller" is changed to read " TAC-1000 Central Controller."
2.
Article II, Required Items and Essential Characteristics of Each, Paragraph 1, Central Controller, add subparagraph 1.14 to read as follows "must be TAC 1000 Central Controller."
Article III, Installation Requirements, Paragraph No. 5 is deleted in its entirety.
The following is substituted in lieu thereof:
o ca 5.
Transition to New S'ystem and Integration with Existing System.
The contractor c-E shall schedule the installation of the card-entry access-control system in such 8 e.
a manner as to provide maximum access control protection for the NRC during g
the installation and transition to the new access-control system as detailed CD in i below:
(D Q:W un -CD
, g g e
..-....... w.a.. -...,_.
.~._
m
~
WUN
- 0 CONF tACTOa/OFFitoe I5 af0VialD TO SIGN THIS DOQJmfNT AND RETutN COPit5 TO ISSU dG Orvact 7 5
- 17. UNfTfD STATES DF AMIEICM s.d f Of CONTkACToasorrison b
,_.ML
. C__._,
e._.,
1
- 13. NAmt AND TITLE Of 5tGNta (Type or per.t/
- 16. DATE SPGNED
- 18. NAME OF CONTRACTpdG OHICIR ( 7ype er pe r) 1,. DA SaGP4fD L).~...s 5-.%ttv 3
hsJ Sk YYLv.
Craig D. Lebo
/s ) '.
e U.S.GPO:1971Nb311-1531S196 L
Racal Vikonics, Inc. Contract No. NRC-10-82-399 The contractor shall provide beneficial use of the new readers a.
as they are installed.
b.
The system data base shall be entered on a storage device for bulk loading of the controller memory prior to cutting in the new controller.
The existing system shall be intergrated as set forth below:
c.
- i. To the extent possible, the existing system wiring shall J
be used for installation of the new system.
'ii.
The existing 12 volt electric door strikes presently installed at the Maryland National Bank and Air Rights III Buildings shall be used.
iii. Twenty-one (21) new 12 VAC transformers shall be installed at the Maryland National Bank Building which in addition to the twenty-one (21) existing transformers, I
shall provide a total of two (2) transformers at each card reader location, one for the reader and one for the electric strike.
iv.
Twenty-one (21) existing sets of magnetic door contacts presently installed at the Maryland National Bank Building shall be used.
Existing standby power battery packs and their associated v.
chargers which, are presently installed for card readers at the Maryland National Bank Building shall be used.
t vi. Ten (10) existing 12 VAC transforners as presently installed at the Air Rights III Building, with one for each reader and a separate one for each strike, shall be used.
vii.
Approximately half of the new replacement card readers shall be installed to operate in the degraded mode.
These shall then be connected to the new console, and the remaining card readers shall be disconnected, permitting them to operate in the degraded mode until replaced.
d.
Four (4) new card readers and one multiplexer shall be installed at the Air Rights III Building and may operate in a degraded mode, l
if necessary, until the new controller becomes operational. The Government has provided knobsets and 115 VAC card reader power at these four locations.
i 4
. Racal Vikonics, Inc.
NRC-10-82-399 One (1) new card reader shall be installed This reader at the Phillips Building (St. Elmo entrance).
e.
shall not become operational until the new controller be operational.
The Government will Drovide outdoor environment.
115 VAC card reader power at this location, as reouired.
Hook up to AC power will be accomplished separately, and upon its availability.
Nine (9) new card readers and one (1) multiplexer shall be installed at the East-West Towers Complex, South Tower.and 115 VAC f.
The Government will provide knobsetsHookup to AC power will be accompli power at each location.
Ten (10) new card readers shall be installed at the Eas The timing of the first 9
Towers Complex, North Tower.
installation of seven (7) of these card readers is dependent upon the installation, by the Government, of seven (7) new doors, beside each of which, one of the card readers is be installed.
115 VAC electrical power for the ten (10) new card readers and the The Government has no firm schedule, at this time, for the completion of the installation of these doors, knobsets, and multiplexer.
However, it is anticipated that such installation shall be complete between the dates of April 1, 1982 and September 30 electrical power.
For this reason, the contractor shall install all equipment for the East-West Towers Complex, North Tower, in two distinct phases:
1982.
Phase I reouires the ' contractor to provide a partial 1.
three (3) card reader system by (1) installing the multiplexer unit and all necessary conduit and cable to all ten (10) present and future door locations, and (2) installinp and connecting three (3) card readers, associated electric door strikes and magnetic door contacts at the three (3) existing ele lobby doors.
as part of Phase II below.
ii.. Phase II requires that the contractor complete installatio connection of the remaining seven (7) card readers, associated electric door strikes and magne This installed in accordance with Phase I above to AC power.
will result in the fully operational ten-card reader system The Government will give the contractor at the North Tower.
at least 30 days advance notification of the of installation under Phase II.
I t
-s
Racal Vikonics, Inc. NRC-10-82-399 4.
Article III, Installation Requirements, add the following:
8.
Installation Schedule Item Completion 1.
Complete installation of March 5, 1982 new card readers and multiplexer at Air Rights III Building, in accordance with Article III, Paragraphs 5.d. and 7.b.
2.
Complete installation at March 5, 1982 Phillips Building in accordance with Article III, Paragraphs 5.e. and 7.c.,
less AC hookup.
3.
Hookup of card reader instal-Within seven (7) calendar days led at Phillips Building to of notification by NRC to AC power.
proceed.
4.
Complete installation at Within seventeen (17) calendar East-West Towers Complex, days of notification by NRC to South Tower in accordance proceed.
with Article III, Paragraphs 5.f. and 7.e., less AC power hookup.
5.
Hookup of card readers instal-Within ten (10) calendar days led at East-West Towers of notification by NRC to proceed.
Complex, South Tower, to AC power.
6.
Complete replacement of twenty-Within twenty-eight (28)fcalendar days one (21) card readers at Mary-following commencement o land National Bank Building, installation.
in accordance with Article III, Paragraph-7.a.;'to commence-twenty-eight (28) days follow-ingudetivery of coded creden-tials in accordance with Article III, Paragraph 9.
Racal Vikonics, Inc. NRC-10-82-399 Item Completion 7.
Complete replacement of Within twenty.eight (28) fcalendar days five(5) card readers at following commencement o Air Rights III Bu'ilding in installation.
accordance with Article III, Paragraph 7.b., to commence twenty-eight (28) days follo-wing delivery of coded c.reden-tials in accordance with Article III, Paraaraoh 9.
8.
Complete Phase I of the Within twenty-one (21) calendar installation at the' East-days of notification by NRC West Towers Complex, North to proceed.
Tower, in accordance with Article III, Paragraphs 5.g.
and 7.d.
9.
Complete Phase II of the Within sixty (60) calendar days installation at the East-of notification by NRC to West Towers Complex, North proceed.
Tower, in accordance with Article III, Paragraphs
- All days expressed as calendar 5.g. and 7.d.
days 5.
Article III, Installation Requirements, add the following:
9.
Coded Credentials All coded credentials required under this contract, in conformance to Article II, Required Items and Ersential Characteristics of Each, shall be delivered to the project officer on or before March 10, 1982.
6.
Article V, Acceptance Test Plan is deleted in its entirety.
The following is substituted in lieu thereof:
l Article V - Acceptance Test Plan On or before March 15, 1982, the contractor shall submit to the project officer for his review, an acceptance test plan in which is set forth precisely what processes, capabilities, features and equipment will be tested and how each will be tested.
The plan will briefly discuss each test to be perfonned and the desired results of each.
The plan will be separated into a " Phase I" test, c.orresponding to Phase I of the installation as discussed in Article III, Installation Requirements, Paragraph 5.g. and a " Phase II" test corresponding to Phase II of the in'stallation.
One or the other of the test plans shall cover all card readers f
as well as the eighteen (18) items set forth in Article II. The acceptar.ce test relating to Phase II shall substantiate that those processes tested l'
and accepted in Phase I continue to operate satisfactorily in consideration of the activation of the equipment installed under Phase II.
Racal Vikonics, Inc.
- 6.-
NRC-10-82-399 7.
Article IX, Inspection and Review of Work, is deleted in its entirety.
The following is substituted in lieu thereof:
Article IX - Inspection, Review, and Acceptance of Work A.
Prior to Delivery The U.S. Nuclear Regulatory Commission reserves the right to make periodic on-site inspections in accordance with the General Provision entitled " Inspection." _It shall be expressly understood that such inspections shall not constitute acceptance by the Government of any part of the work, but shall be for the purpose of providing coordination and technical guidance in interpretation of technical requirements.
B.
Subsequent to Delivery and Installation 1.
All inspections, as well as acceptance or rejection decisions, if any, shall be made at destination by the Project Officer or his authorized representative.
2.
Upon delivery and installation of deliverables specified herein, the contractor shall submit a " readiness certificate" to the Project Officer-certifying that the equipment is installed and ready for examination and testing.
Separate readiness certificates shall be submitted for the completion of work under Phase I and Phase II when each is separately completed.
3.
Upon receipt of the readiness certificates for phase I and, later, for Phase II, the Project Officer or his authorized representative will visually inspect each item and the nature of its installation for compliance with the specifications contained herein.
4.
Upon completion of this visual inspection for each of Phase I and Phase II, the Project Officer will notify the contractor to commence acceptance testing in accordance with the approved plans (see Article VI).
After each Phase, the appropriate acceptance test shall conrnence within seven (7) days of Project Officer notification.
The acceptance tests shall be concluded and written results and l
conclusions submitted to the Project Officer for review within ten (10) days of completion of each test.
The project officer will then review the test results and either provide written notice of final acceptance of the phase for which the test was administered within ten (10) days of receipt of test result or will return the test results for modification in the installation to meet contract specifications.
Completion of corrections / modifications, l
I if necessary, shall be accomplished within ten (10) days.
Readministrat of the applicable acceptance test and submission of results therefrom
~
shall take place withid seven (7) days following completion of corrections.
L J
Racal Vikonics, Inc. NRC-10-82-399 8.
Article IV, Period of Performance / Delivery, Paragraph No.1 is deleted in its entirety.
The following is substituted in lieu thereof:
The period of performance of this contract shall be for 396 days from its effective date.
Delivery and Installation within this period of performance shall conform to the schedule set forth in Article III, Installation Requirements.
9.
The above changes are accomplished without change to the total amount of this contract.