Interim Deficiency Rept Re ASME Structural Weld & Welder Qualification.Investigation Still Ongoing & Expected to Be Completed by 820529
ML20054D100
Person / Time
Site: Zimmer
Issue date: 04/14/1982
From: Borgman E, Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
10CFR-050.55E, 10CFR-50.55E, QA-1699, NUDOCS 8204220340
Download: ML20054D100 (2)


Text

I TIIE CINCINNATI GAS & ELECTRIC COMPANY ses - "

ZIMMER POWER STATION, P. O. BOX 201, MOSCOW, 011 45153 CINCtNN ATI. OHIO 45201 April 14, 1982 QA-1699 E. A. BORG M AN N schion vict PatSIDCNT eO (s j'/ </ \\

e ef ,,w , iv _

U. S. Nuclear Regulatory Commission Region III

[

Of' ['fW}.

[ ['

799 Roosevelt Road D*# N Glen Ellyn, Illinois 60137 ks/ 1,;.,i 94 Attention: Mr. J. G. Keppler Regional Administrator RE: WM. II. ZIMMER NUCLEAR POWER STATION - UNIT 1 10CFR50.55(e) - ITEM M ASME STRUCTURAL WELD & WELDER QUALIFICATION - DOCKET NO.

50-358, CONSTRUCTION PERMIT NO. CPPR-88, W.O.

  1. 57300 JOB E-5590 FILE NO. NRC-8, M-34 Gentlemen:

This letter constitutes an interim report to the subject condi-tion initially reported as a potentially reportable deficiency under 10CFR50.55 (e) .

On March 2,1982, interim report QA-1649 was submitted which indicated welders had been qualified per the test requirements of II. J. Kaiser procedure SPPM 3.1.51. Contrary to the requirements of ASME Section IX, 1971 thru 1973 Winter Addenda, welders were quali-fled only in two positions, vertical (3G) and overhead (4G). The Code states that qualification in the horizontal (2G), vertical, or overhead position shall qualify also for the flat position. Quali-fication in the horizontal fixed position (SG) shall qualify for the flat, vertical and overhead positions. Qualification in the horizontal, vertical and overhead positions shall qualify for all positions. Qualification in the inclined fixed position (6G) shall qualify for all positions.

The last report stated that an investigation was underway to determine the safety related significance of this condition. It was also stated that a review of inspection results of a sample of these welds was underway to resolve the deficiency and determine a resolution. At this time the investigation is still ongoing and is expected to be completed by May 29, 1982, at which time a formal report will be submitted.

8204220340 820414 PDR ADOCK 05000359 S PDR APR 10 N f 0 7 ', /a

Mr. J. G. Keppler Regional Administrator U.S. Nuclear Regulatory Commission Region III '

April 14, 1982 - QA-1699 Page 2 We trust that the above will be found acceptable as an interim report under the requirements of 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By E. A. Borgmann KRS:plc cc: NRC Resident Inspector Attn: W. F. Christianson l NRC Office of Inspection & Enforcement Washington, D.C. 20555 1