Forwards Compilation of soil-related Info to Support Safety Evaluations Re Soil Issues Per Ser.Info Sources Include Meeting Summaries,Technical Audits & Hearing Testimony Transcripts
ML20054C387
Person / Time
Site: Midland
Issue date: 04/15/1982
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
References
16639, NUDOCS 8204200484
Download: ML20054C387 (37)


Text

l

@ CORSlim8IS Power u,,,s. w e m C0mpany m, ~.u,., - a#,o+< =

and Construction General Offices: 1945 West Parnell Road, Jackson, MI 49201 * (517) 78& O453 April 15, 1982

\\ O i g

9 ys 's L

N

' g,h,$'.

Harold R Denton, Director 4"

Q m

.s Office of Nuclear Reactor Regulation V. gyjir

?

I Division of Licensing C

nq '.. gj y

US Nuclear Regulatory Commission s\\

"p r,,[;

Washington, DC 20555

/,C le MIDLAND PROJECT MIDLAND DOCKET NO 50-329, 50-330 MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION SOURCE COMPILATION FOR SER EVALUATIONS FILE: 0485.16, 0505.16 SERIAL:

16639 In accordance with recent discussions between the NRC's management and Consumers Power Company's management, we are forwarding to the NRC a l

compilation of the soil-related informational sources available to the Staff l

for the Staff's use in completing its SER evaluations.

The enclosed document is composed of several separate lists, that is, one for each Standard Review Plan (SRP) pertinent to soils-related issues for Midland, each of which is keyed to the areas of review identified by the individual SRPs. The types of informational sources listed for these SRP's include Consumers' correspondence to the NRC, meetings and meeting summaries, telephone discussions with the Staff and its consultants, NRC technical audits, and hearing testimony transcripts.

We believe that the enclosed compilation of soils-related reference sources lends further support to our conclusion that the safety evaluations related to soils issues can be completed with the information already available to the Staff.

A f

Os a/

4WGK So JWC/RLT/mkh I

  • I 8204200404 820415 PDR ADOCK 05000329 E

PDR

~~

CC Atomic Safety and Licensing Appeal Board, w/o CBechhoefer, ASLB, w/o MMCherry, Esq, w/o FPCowan, ASLB, w/o RJCook, Midland Resident Inspector, w/o RSDecker, ASLB, w/o DCFischer, ACRS, w/a SGadler, w/o JHarbour, ASLB, w/o GHarstead, Harstead Engineering, w/a RHernan, NRC, w/a DSHood, NRC, w/a (2)

DFJudd, B&W, w/o JDKane, NRC, w/a FJKelley, Esq, w/o RBLandsman, NRC Region III, w/a WHMarshall, w/o JPMatra, Naval Surface Weapons Center, w/a W0tto, Army Corps of Engineers, w/o WDPaton, Esq, w/o SJPoulos, Geotechnical Engineers, w/a FRinaldi, NRC, w/a HSingh, Army Corps of Engineers, w/a BStamiris, w/o l

l i

l I

oc0482-0069a100

?

o.

s ENCLOSURE y

MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS

  • MIDLAND UNITS 1 AND 2 DOCKET NO 50-329 and 50-330 CONSUMERS POWER COMPANY APRIL 14, 1982 1

l l

l l

l l

  • NOTE: This is a set of listings of only the reference information for those sections of the SRPs which relate to soils settlement issues. Other information not related to soils issues can be found in the Midland FSAR or in other docketed submittals.

rp0482-1759fl02

b MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS

  • STANDARD REVIEW PLAN 2.4.12 Groundwater I.

Areas of Review 50.54(f) Q&R 24 - Shallow groundwater system, pe rmeabilities, impact of vater level changes to foundation conditions 50.54(f) Q&R 47 - Site dewatering adequacy to prevent liquefaction, well installation, operation and monitoring 50.54(f) Q&R 49 to 52 - Further response to questions on Jewatering system design and assumptions and recaarge sources and rates that could impact the system 06/04/80 US Corps of Engin_ers report to the NRC on Review of Geotechnical Aspects of the Seismic Safety of Midland Nuclear Plant 02/23/82 Meeting concerning recharge test results and proposed continuation of study. NRC meeting summary trads-mitted in NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results, proposed continuation of study, discussion of postulated failures and system response alternatives, liquefac-tion protection provided by systcms, and other site areas which may not be protected from liquefaction (See NRC meeting summary transmitted in NRC letter of 3/16/82)

II.

SAR 2.4.12.1 Groundwater Description 50.54(f) Q&Rs 24, 47, 49, 50, 51, and 52 04/24/81 CP Co response to NRC requests for additional informa-tion on interceptor back-up wells (Serial 11818) 05/28/81 NRC letter with Staff comments on specification for dewatering

  • Note: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.

Other information not related to soils issues can be found in the Midland FSAR j

or in separate submittals, meeting notes, etc.

rp0482-1759d173 i

{

e i

2 05/28/81 CP Co letter on permanent plant dewatering with revised Specification C-88 (Serial 12225) 09/02/81 NRC letter with Staff concurrence for installation of eight back-up wells 09/16/81 CP Co letter with request for installation of 44 de-watering wells (Serial 13774) 10/22/81 NRC letter with Staff concurrence to install permanent dewatering wells 11/12/81 NRC Region III Inspection Report concerning dewatering wells and FSAR rereview of findings 02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results and liquefac-tion protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 II.

SAR 2.4.12.2 Groundwater Usage 50.54(f) Q&Rs 24, 47, 49, 50, 51, and 52 04/24/81 CP Co response to NRC requests for additional informa-tion on interceptor back-up wells (Serial 11818) 05/28/81 NRC letter with Staff comments on specification for dewatering 05/28/81 CP Co letter on permanent plant dewatering with revised Specification C-88 (Serial 12225) 09/02/81 NRC letter with Staff concurrence for installation of eight back-up wells 09/16/81 CP Co letter with request for installation of 44 de-watering wells (Serial 13774) 10/22/81 NRC letter with Staff concurrence'to install permanent dewatering wells 11/12/81 NRC Region III Inspection Report concerning dewatering wells and FSAR r6 review of findings 02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 l

rp0482-1759d102

9 4

+

3 03/03/82 Meeting concerning recharge test results and liquefac-tion protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 II.

SAR 2.4.12.3 Protection of Groundwater Users 50.54(f) Q&Rs 24, 47, 49, 50, 51, and 52 04/24/81 CP Co response to NRC requests for additional inforr.a-tion on interceptor back-up wells (Serial 11818) 05/28/81 NRC letter with Staff comments on specification for dewatering 05/28/81 CP Co letter on permanent plant dewatering with revised Specification C-88 (Serial 12225) 09/02/81 NRC letter with Staff concurrence for installation of eight back-up wells 09/16/81 CP Co letter with request for installation of 44 de-watering wells (Serial 13774) 10/22/81 NRC letter with Staff concurrence to install permanent dewatering wells 11/12/81 NRC Region III Inspection Report concerning dewatering wells and FSAR rereview of findings 02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of l

3/12/82 l

l 03/03/82 Meeting concerning recharge test results and liquefac-l tion protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 II.

SAR 2.4.12.4 Design Bases for Subsurface !!ydrostatic Loadings 50.54(f) Q&Rs 24, 47, 49, 50, 51, and 52 l

04/24/81 CP Co response to NRC requests for additional informa-l tion on interceptor back-up wells (Serial 11818) 05/28/81 NRC letter with Staff comments on specification for dewatering l

05/28/81 CP Co letter on permanent plant dewatering with revised Specification C-88 (Serial 12225) rp0482-1759d102 l

C

s 4

09/02/81 NRC letter with Staff concurrence for installation of eight back-up wells 09/16/81 CP Co letter with request for installation of 44 de-watering wells (Serial 13774) 10/22/81 NRC letter with Staff concurrence to install permanent dewatering wells 11/12/81 NRC Region III Inspection Report concerning dewatering wells and FSAR rereview of findings

~

02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results and liquefac-tion protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 06/04/80 US Corps of Engineers report to NRC on Review of Geotechnical Aspects of the Seismic Safety of Midland Nuclear Plant 03/16/82 Informal transmittal of site boring location draw-ings indicating loose sand layers subject to

'~

possible liquefaction sent to J Kane (NRC) and Paul Hadala (COE) d3/19/82 Telecon to NRC and COE concerning areas of site having potential for liquefaction beneath Category I facilities rp0482-1759d102

MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS

  • STANDARD REVIEW PLAN 2.5.1 Basic Geologic and Seismic Information I.2 Seismic Features 50.54(f) QER 24 - Shallow groundwater system, pe rmeabilities, impact of water level changes to foundation conditions 50.54(f) Q&R 47 - Site dewatering adequacy to prevent liquefaction, well installation, operation and monitoring 50.54(f) Q&Rs 49 to 52 - Further response to questions on dewatering system design and assumptions and recharge sources and rates that could impact the system 06/04/80 US Corps of Engineers report to the NRC on Review of Geotechnical Aspects of the Seismic Safety of Midland Nuclear Plant 02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results and liquefaction protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 03/16/82 Informal transmittal of site boring location drawings indicating loose sand layers subject to possible liquefaction sent to J Kane (NRC) and Paul Hadala (COE) 03/19/82 Telecon to NRC and COE concerning areas of site having potential for liquefaction beneath Category I facilities I.3 Man-Made Conditions 50.54(f) Q&R 24 - Shallow groundwater system, pe rmeabilities, impact of water level changes to foundation conditions 50.54(f) Q&R 47 - Site dewatering adequacy to prevent liquefaction, well installation, operation and monitoring
  • Note: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.

Other information not related to soils issues can be found in the Midland FSAR or in separate submittals, meeting notes, etc.

rp0482-1759h102

2 50.54(f) Q&Rs 49 to 52 - Further response to questions on dewatering system design and assumptions and recharge sources and rates that could impact the system 06/04/80 US Corps of Engineers report to the NRC on Review of Geotechnical Aspects of the Seismic Safety of Midland Nuclear Plant 02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results and liquefaction protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 03/16/82 Informal transmittal of site boring location drawings indicating loose sand layers subject to possible liquefaction sent to J Kane (NRC) and Paul Hadala (COE) 03/19/82 Telecon to NRC and COE concerning areas of site having potential for liquefaction beneath Category I facilities i

(

l l

l l

l rp0482-1759h102


n

-,--,n g-

--s

MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS

  • STANDARD REVIEW PLAN 2.5.4 Stability of Subsurfa'ce Materials and Foundations I.1.d Unstable Rocks or Soils 50.54(f) Q&R 24 - Shallow groundwater system, permeabilities, impact of water level changes to foundation conditions 50.54(f) Q&R 47 - Site dewatering adequacy to prevent liquefaction, well installation, operation and monitoring 03/03/82 Meeting concerning recharge test results and liquefaction protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 03/16/82 Informal transmittal of site boring location drawings indicating loose sand layers subject to possible liquefaction sent to J Kane (NRC) and Paul Hadala (C0E) 03/19/82 Telecon to NRC and COE concerning areas of site having potential for liquefaction beneath Category I facilities I.1.f Consolidation and Preconsolidation Pressures and Methods 08/17/81 Soil preconsolidation pressure vs post overburden pressure of the DGB (Serial 13422)

I.2 Static and Dynamic Soil / Rock Properties Underlying Site 11/24/81 Results of soil borings and testing program for Aux Bldg (Part 2) (Serial 14874) 11/10/81 Results of soil boring and testing program for the BWST (Serial 14281) 11/06/81 Test results of soil boring and testing program for SWPS (Serial 14280) 09/22/81 Results of soil boring and testing program for Aux Bldg (Part 1) (Serial 13794) 07/31/81 Test results of soil boring and testing program for DGB (Serial 13382)

  • Note: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.

Other information not related to soils issues can be found in the Midland FSAR or in separate submittals, meeting notes, etc.

rp0482-1759g102

O 2

07/27/81 Final results of soil boring and testing program for perimeter and baffle dike areas (Serial 13340)

I.3 Relationship of Foundations and Underlying Materials 11/24/81 Results of soil borings and testing program for Aux Bldg (Part 2) (Serial 14874) 11/10/82 Results of soil boring and testing program for the BWST (Serial 14281) 11/06/81 Test results of soil boring and testing program for SWPS (Serial 14280) 09/22/81 Results of soil boring and testing program for Aux Bldg (Part 1) (Serial 13794) 07/31/81 Test results of soil boring and testing program for DGB (Serial 13382) 07/27/81 Final results of soil boring and testing program for perimeter and baffle dike areas (Serial 13340)

I.6 Groundwater Conditions and Dewatering 50.54(f) Q&R 47 - Site dewatering adequacy to prevent liquefaction, well installation, operation and monitoring 50.54(f) Q&R 49 to 52 - Further response to questions on dewatering system design and assumptions and recharge sources and rates that could impact the system 09/11/81 CP Co letter with new settlement plots, Borros Anchor and piezometer plots (Serial 13784) 07/27/81 CP Co letter with revised settlement plots and piezometer plots (Serial 12809) 06/04/80 US Corps of Engineers report to the NRC on Review of Geotechnical Aspects of the Seismic Safety of Midland Nuclear Plant 04/24/81 CP Co response to NRC requests for additional information on interceptor back-up wells (Serial 11818) 05/28/81 NRC letter with Staff comments on sp'ecification for dewatering 05/28/81 CP Co letter on permanent plant dewatering with revised Specification C-88 (Serial 12225) rp0482-1759g102

3 09/02/81 NRC letter with Staff concurrence for installation of eight back-up wells 09/16/81 CP Co letter with request for installation of 44 dewatering wells (Serial 13774) 10/22/81 NRC letter with Staff concurrence to install permanent dewatering wells 11/12/81 NRC Region III Inspection Report concerning dewatering wells and FSAR rereview of findings 02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results and liquefaction protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 I.7 Responses of Site Soils to Dynamic Loading 03/10/82 Settlement of underground diesel fuel tanks due to seismic shakedown (Serial 16243) l 10/21/81 CP Co letter on remaining NRC concerns for the DGB l

(Serial 14316)

I.8 Liquefaction 50.54(f) Q&R 47 - Site dewatering adequacy to prevent liquefaction, well installation, operation and monitoring l

06/04/80 US Corps of Engineers report to the NRC on Review of l

Geotechnical Aspects of the Seismic Safety of Midland l

Nuclear Plant 02/23/82 Meeting concerning recharge test results as documented in NRC meeting summary transmitted by NRC letter of 3/12/82 03/03/82 Meeting concerning recharge test results and liquefaction protection as documented in NRC meeting summary transmitted by NRC letter of 3/16/82 03/16/82 Informal transmittal of site boring location drawings indicating loose sand layers subject to possible liquefaction sent to J Kane (NRC) and Paul Hadala (COE) 03/19/82 Telecon to NRC and COE concerning areas of site having potential for liquefaction beneath Category I facilities rp0482-1759g102 i

4 I.10 Foundation Material Stability, Deformation and Settlement Under Static Conditions 10/21/81 CP Co letter on remaining NRC concerns for the DGB (Serial 14316) 09/11/81 Table of Midland updated marker settlement vs time plots (Serial 13784) 02/23-26/82 Meeting on the Diesel Generator Building and Service Water Pump Structure as documented in NRC meeting summary of 3/12/82 I.11 Criteria and Design Methods for Static and Dynamic Analyses of Foundation Material 07/27/81 Final results of soil boring and testing program for perimeter and baffle dike areas (Serial 13340)

I.12 Techniques and Specifications to Improve Subsurface Conditions 03/18/82 Surcharge removal for the BWST valve pits (Serial 16559) 01/06/82 Aux Bldg underpinning freeze wall - effects of the freeze wall on utilities and structures (Serial 15424) 02/04/82 Aux Bldg soil remedial measures access shaft - augering method for soldier pile holes (Serial 15528) 11/16/81 Aux Building - response to NRC questions (Serial 14869) i 11/06/81 Response to NRC request for additional information pertaining to the proposed underpinning of the SWPS (Serial 14843) 10/26/81 Surcharge of the BWST foundation (Serial 14591) 01/18-20/82 and NRC audit of the Aux Building 02/01-05/82 03/15-19/82 NRC audit of the SWPS 03/26/82 Telecon closing items on SWPS:

(1) soil spring constants; (2) construction dewatering; and (3) settlement monitoring plans.

rp0482-1759g102 l

o MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS

  • STANDARD REVIEW PLAN Section 3.7.1 Seismic Design Parameters I.2 Critical Damping Values 12/14-15/81 Hearing transcript testimonies of Dr R P Kennedy, F Rinaldi, and J Matra I.3 Supporting Media for Cat I Structures 50.54 (f) Q&R's 12, 24, & 25 03/23/82 Test Results of the Soil Boring and Testing Program for the Retaining Walls (Serial 16573 w/ encl) 11/24/81 Results of Soil Boring and Testing Program for Auxiliary Building (Part 2)(Serial 14874 w/ enc 1) 11/06/81 Test Results of Soil Boring and Testing Program for the SWPS (Serial 14280 w/ encl) 09/22/81 Results of Soil Boring and Testing Program for Auxiliary Building (Part 1) (Serial 13794 w/ encl) 07/31/81 Test Results of Soil Boring and Testing Program for DGB (Serial 13382 w/2 encl) 07/27/81 Updates of DGB Area Settlement and Piezometer Plots (Serial 12809 w/2 enc 1) 11/10/81 Results of Soil Boring and Test Program for the BWST (Serial 14281 w/3 encl) 10/21/81 Estimates of Relative Density of Granular Fire Materials Under the DGB (Serial 14316 w/8 encl)
  • NOTE: This is a listing of only the reference information and.the subsections of this SRP which relate to soils settlement issues for Midland Units I and 2.

Other information not related to soils issues can be found in the Midland FSAR or in separate submittals, meeting notes, etc.

miO382-0053a100

i MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS

  • STANDARD REVIEW PLAN Section 3.7.2 Seismic System Analysis I.1 Seismic Analysis Method 10/21/81 Relative Density and Shakedown Settlement of Sand Under the DGB (Serial 14316 w/8 enc 1) 12/14-15/81 Hearing transcript testimony of Dr R P Kennedy I.3 Procedures Used for Analytical Modeling Auxiliary Building 12/14-15/81 Hearing transcript testimonies of Dr R P Xennedy, F Rinaldi, and J Matra 50.54(f) Q&R 15 01/25/82 NRC letter summarizing 10/2/81 meeting on seismic models for Aux Bldg and SWPS 03/11/82 NRC letter summarizing 3/8/82 telecon on soil spring stiffnesses for Aux Bldg underpinning and Phase II construction 09/30/81 SWPS and Aux Bldg Seismic Models (Serial 14110 w/3 encl)

BWST 12/14-15/82 Hearing transcript testimonies of Dr R P Kennedy, F Rinaldi and J Matra l

11/24/81 Addendum No 1 to the Design Report for the BWST Foundation Analysis (Serial 14902 w/ encl)

SWPS 12/14-15/82 Hearing transcript testimonies of Dr R P Kennedy, F Rinaldi and J Matra 03/02/82 Appendix A: SWPS Three-Dimensional Finite-Element Models (Serial 16352 w/ encl)

I l

50.54(f) Q&R 15 l

  • NOTE: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.

l Other information not related to soils issues can be found in the Midland FSAR l

or in separate submittals, meeting notes, etc.

miO382-0053a100 l

l l'

2 01/25/82 NRC letter summarizing 10/2/81 meeting on seismic models for the Aux Bldg and SWPS DGB 01/08/82 Draft testimony of K Wiedner 50.54(f) Q&R 13 10/21/81 Relative Density and Shakedown Settlement of Sand Under the DGB (Serial 14316 w/8 encl)

I.4 Soil-Structure Interaction 12/14-15/81 Hearing transcript testimonies of Dr R P Kennedy and Paul Hadala.

50.54(f) Q&R's 13, 15,& 25 I.8 Interaction of Non-Cat I Structures with Cat I 02/23/82 to Meetings in Bethesda as documented in NRC meeting 02/26/82 summary transmitted by NRC letter of 3/12/82 I.11 Methods Used to Account for Torsional Effects 12/14-15/81 Hearing transcript testimonies of Dr R P Kennedy, J Matra, and F Rinaldi I.13 Analysis Procedure for Damping 12/14-15/81 Hearing transcript testimonies of Dr R P Kennedy, J Matra, and F Rinaldi miO382-0053a100

MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS

  • STANDARD REVIEW PLAN 3.7.3 Seismic Subsystem Analysis I.12 Category I Buried Piping, Tanks, Ducts, etc.

50.54(f) Q&R's 7, 17, 18, 19 & 20 03/16/82 Additional Information Concerning Safety Grade Buried Piping (Serial 16269 )

03/10/82 Settlement of Underground Diesel Fuel Tanks Due to Seismic Shakedown (Serial 16243) l

  • NOTE: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units I and 2.

Other information not related to soils issues can be found in the Midland FSAR or in separate submittals, meeting notes, etc.

miO382-0053a100

l MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS

  • STANDARD REVIEW PLAN 3.8.4 Other Category I Structures I.2 Applicable Codes, Standards & Specs Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01-20-82 Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant DR 02/24/82 Draft Testimony by Applicant
  • Note: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.

Other information not related to soils issues can be found in the Midland FSAR or in separate submittals, meeting notes, etc.

rp0482-1759a102

2 I.3 Loads & Load Combinations Auxiliary Building & FIVP 09/30/81 Technical Report on Underpining the Aux Bldg & FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/82 Draft Testimony by Applicant DGB 02/24/82 Draft Testimony by Applicant I.4 Design & Analysis A.

Boundary Conditions & Behavior Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Tech Report on Aux Bldg - Results of Static Analysis (Serial 14899) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/Staf f at Bethesda rp0482-1759a102

3 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant DGB 02/24/82 Draft Testimony by Applicant 02/24/82 Meeting w/ Staff at Bethesda B.

Transmission of Lateral Loads & OTM Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/32 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant DGB 02/24/82 Draft Testimony by Applicant 02/24/82 Meeting w/ Staff at Bethesda l

C.

Computer Programs i

[

Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP I

(Serial 14110) 12/03/81 Addendum to Report on Aux Bldg - Results of Static Analysis (Serial 14899) l 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant rp0482-1759a 102 l

[

4 SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant DGB 02/24/82 Draft Testimony by Applicant D.

Design Report Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Tech Report Aux Bldg - Results of Static Analysis (Serial 14899)

SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 16352)

E.

Structural Audit Auxiliary Building & FIVP May/82 Forthcoming Audit SWPS 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 I.5 Structural Acceptance Criteria A.

Compliance with ACI & AISC rp0482-1759a102

5 Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Tech Report Aux Bldg - Results of Static Analysis (Serial 14899) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant DGB 02/24/82 Draft Testimony by Applicant B.

Cracks Issue Auxiliary Building & FIVP 01/25/82 Evaluation of Cracking in the Feedwater Isolation Valve Pits (Serial 15493) 01/29/82 Evaluation of Cracking in the Auxiliary Building Control Tower and Electrical Penetration Areas at Midland Plant (Serial 15527) 12/10/81 Meeting w/ Staff at Bethesda 01/11/82 Meeting w/ Staff at Bethesda Testimony by Applicant SWPS 03/02/82 Evaluation of Cracking in the Service Water Pump Structure (Serial 16009) 12/10/81 Meeting w/ Staff at Bethesda 01/11/82 Meeting w/ Staff at Bethesda 12/31/81 Draft Testimony by Applicant rp0482-1759a102

6 DGB 02/16/82 Evaluation of the Effect on Structural Strength of Cracks in the Walls (Serial 15978) 10/02/81 Adina Concrete Cracking Analysis (Serial 14111) 09/30/81 Meeting w/ Staff at Bethesda 12/10/81 Meeting w/ Staff at Bethesda 01/11/82 Meeting w/ Staff at Bethesda 02/24/82 Meeting w/ Staff at Bethesda I.6 Materials, QC, & Sp1 Constr Technique A.

Materials Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 09/17/81 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arboe 03/19/82 12/31/81 Draft Testimony by Applicant DjB NA B.

Special Construction Techniques Auxiliary Building & FIVP (Includes Const Analysis, Monitoring and Post Tensioning) 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 11/16/81 Response to NRC Staff Request for Additional Info Pertaining to the Proposed Underpinning of the Aux Bldg

& FIVP (Serial 14869) 10/01/81 Meeting w/ Staff at Bethesda 11/04/81 Meeting w/Staf f at Bethesda 02/26/82 Meeting w/ Staff at Bethesda rp0482-1759a 102

7 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 02/01/82 to Audit by Staff at Ann Arbor 02/05/82 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 Testimony by Applicant SWPS (Includes Const Analysis, Monitoring and Post Tensioning) 08/26/81 Technical Report on Underpinning the SWPS (Serial 13733) 11/06/81 Responses to the NRC Staff Request for Additional Info Pertaining to the Proposed bnderpinning of the SWPS (Serial 14843) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant 03/02/82 Three-Dimensional Finite-Element Models for the SWPS (Serial 13652)

DGB NA i

rp0482-1759a 102

j 1

I MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS

  • STANDARD REVIEW PLAN 3.8.5 Foundations I.1 Description of Foundations Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 11/16/81 Response to NRC Staff Request for Additional Info Pertaining to the Proposed Underpinning of the Aux Bldg & FIVP (Serial 14869) 10/01/81 Meeting w/ Staff at Bethesda 11/04/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 02/01/82 to Audit by Staff at Ann Arbor 02/05/82 Testimony by Applicant Testimony by NRC Staff SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 11/06/81 Responses to the NRC Staff Request for Additional Info Pertaining to the Proposed Underpinning of the SWPS (Serial 14843) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda Testimony by Applicant 02/05/82 Testimony by NRC NOTE: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.

Other information not related to soils issues can be found in the Midland FSAR or in separate submittals, meeting notes, etc.

rp0482-1759b102

2 DGB NA I.2 Applicable Codes, Standards & Specs Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) i 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant Testimony by NRC Staff SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting,w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda Testimony by Applicant 02/05/82 Testimony by NRC DGB 02/24/82 Draft Testimony by Applicant I.3 Loads & Load Combinations Auxiliary Building & FIVP 09/30/81 Technical Report on Underpining the Aux Bldg & FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant rp0482-1759b 102 4

3 SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda 02/23/82 to Meeting w/ Staff at Bethesda 02/26/82 Testimony by Applicant 02/05/82 Testimony by NRC DGB 02/24/82 Draft Testimony by Applicant I.4 Design & Analysis A.

Boundary Conditions & Behavior Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Tech Report on Aux Bldg - Results of Static Analysis (Serial 14899) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 l

to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS l

l 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three Dimensional Finite Element Models for the SWPS I

(Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda I

rp0482-1759b102

4 03/16/82 to Audit by Staff at Ann Arbor 03/19/72 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda Testimony by Applicant 02/05/82 Testimony by NRC DGB 02/24/82 Draft Testimony by Applicant B.

Transmission of Lateral Loads & OTM Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/72 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda Testimony by Applicant rp0482-1759b102

5 DGB 02/24/82 Draft Testimony by Applicant C.

Computer Programs Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP.

(Serial 14110) 12/03/81 Addendum to Report on Aux Bldg - Results of Static Analysis (Serial 14899) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/72 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339)

Testimony by Applicant DGB 02/24/82 Draft Testimony by Applicant D.

Design Report Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Tech Report Aux Bldg - Results of Static Analysis (Serial 14899)

SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) rp0482-1759b102

6 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352)

BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 11/24/81 Addendum No 1 - Design Report for the BWST Foundation Analysis (Serial 14902)

E.

Structural Audit Auxiliary Building & FIVP May/82 Forthcoming Audit SWPS 03/16/82 to Audit by Staff At Ann Arbor 03/19/82 BWST 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 April /82 Forthcoming Audit of Cales I.5 Structural Acceptance Criteria A.

Compliance with ACI Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Tech Report on Aux Bldg - Results of Static Analysis (Serial 14899) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352) 09/17/81 Heeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda rp0482-1759b102

7 03/16/82 to Audit by Staff at Ann Arbor 03/19/72 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda Testimony by Applicant 02/05/82 Testimony by NRC DGB 02/24/82 Draft Testimony by Applicant B.

Factors of Safety-Sliding & OT Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 12/03/81 Addendum to Tech Report on Aux Bldg - Results of Static Analysis (Serial 14899) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS i

08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) i 11/06/81 Responses to the NRC Staff Request for Additional Info l

Pertaining to the Proposed Underpinning of the SWPS l

(Serial 14843) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda l

Testimony by Applicant i

rp0482-1759b102

a e

8 DGB NA I.6 Materials, QC, & Sp1 Constr Technique A.

Materials Auxiliary Building & FIVP 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 10/01/81 Meeting w/ Staff at Bethesda 01/18/82 to Audit by Staff at Ann Arbor 01/20/82 Testimony by Applicant SWPS 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 09/17/81 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda Testimony by Applicant B.

Special Construction Techniques Auxiliary Building & FIVP (Includes Const Condition Analysis, Monitoring and Post Tensioning) 09/30/81 Technical Report on Underpinning the Aux Bldg & FIVP (Serial 14110) 11/16/81 Response to NRC Staff Request for Additional Info Pertaining to tne Proposed Underpinning of the Aux Bldg

& FIVP (Serial 14869) 10/01/81 Meeting w/ Staff at Bethesda 11/04/81 Meeting w/ Staff at Bethesda l

01/18/82 to Audit by Staff at Ann Arbor 01/20/82 02/01/82 to Audit by Staff at Ann Arbor 02/05/82 rp0482-1759b102

a J

9 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 Testimony by Applicant SWPS (Includes Const Condition Analysis, Monitoring and Post Tensioning) 08/26/81 Technical Report on Underpinning the SWPS (Serial 13738) 11/06/81 Responses to the NRC Staff Request for Additio'nal Info Pertaining to the Proposed Underpinning of the SWPS (Serial 14843) 03/02/82 Three Dimensional Finite Element Models for the SWPS (Serial 16352) 09/17/81 Meeting w/ Staff at Bethesda 02/23/82 Meeting w/ Staff at Bethesda 03/16/82 to Audit by Staff at Ann Arbor 03/19/82 12/31/81 Draft Testimony by Applicant BWST 11/13/81 Design Report for the Borated Water Storage Tank Foundation Analysis (Serial 14339) 01/13/81 Meeting w/ Staff at Bethesda Testimony by Applicant 02/23/82 to Meeting w/ Staff at Bethesda 02/26/82 rp0482-1759b 102 i

MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS

  • STANDARD REVIEW PLAN 3.9.2 Dynamic Testing and Analysis of Systems, Components, and Equipment I.2.j. Seismic System Analysis for Category I Buried Piping Systems 10/20/80 NRC request for details of stress analyses for underground ii P P ng 11/14/80 CP Co response to request for stress analyses for underground piping (Serial 10113) 12/15/81 CP Co letter w/ enclosed report " Analysis of Buried Piping for Midland" (Serial 15093) 02/03/82 Sample cale and Bechtel Design Guide C-2.44 on seismic analysis of underground piping 03/08/82 Informal transmittal to J Kane of service water pipe profile plots and borros anchor plots 03/16/82 CP Co Letter on future monitoring program and reinstallation of service water piping (Serial 16269) 01/20/81 Meeting to review the method of calculations for underground ii P P ng 05/04/81 Meeting on fill settlement and stresses in underground piping 10/06/81 Meeting to present CP Co demonstration-type solution on underground piping.

01/21/82 Meeting on future monitoring, geotech concerns, and seismic concerns for underground piping 02/05/82 NRC meeting summary for 10/6-7/81 meeting on proposed performance - based acceptance criteria for service water piping and other piping 02/11/82 Meeting to discuss underground piping terminal end analysis, rattlespace criteria, and pipe ovalization 08/10/81 Telecon to discuss how CP Co proposes to demonstrate structural integrity of underground piping

  • Note: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.

Other information not related to soils issues can be found in the Midland FSAR or in separate submittals, meeting notes, etc.

rp0482-1759c102

2 08/25/81 Telecon to discuss NRC position on proposals for the demonstration of underground piping integrity 01/08/81 Telecon concerning monitoring and rebedding of underground

~

piping 03/24/82 03/25/82 Telecon on geotech parameters used for buried piping seismic analysis 02/05/82 CP Co written testimony for Soils Hearings 02/18/82 02/19/82 Soils hearings transcript

~ -

t 4

I I

i i

l l

l rp0482-1759c102

r MIDLAND SOILS SETTLEMENT REFERENCE INFORMATION FOR SER EVALUATIONS

  • STANDARD REVIEW PLAN 9.5.4 Emergency Diesel Engine Oil Storage and Transfer System I.1.a Seismic Design Requirements 50.54(f) Q&R 33 - Load test buried tanks and impact piping connections 12/15/81 CP Co letter on the Analysis of Buried Piping (Serial 15093) 03/10/82 Settlement of underground fuel tanks due to seismic shakedown (Serial 16243) 03/03/82 Meeting to discuss the liquefaction potential of loose sand layer (s) 03/19/82 Telecon with Paul Hadala (US Corps of Engineers WES) concerning liquefaction of loose sand layer (s) 03/30/82 Telecon with J Kane/P Hadala on additional boring l

data for the buried fuel tanks 02/18-19/82 Applicant and NRC testimony presented at Midland Soil Hearings i

I.1.b System Design, Fabrication, Erection, and Testing to

(

Quality Standards 50.54(f) Q&R 6.b - Settlement of buried tanks 50.54(f) Q&R 17 - Seismic Category I buried piping 50.54(f) Q&R 33 - Load test buried tanks and impact piping connections 50.54(f) Q&R 44 - Buried tank bearing capacity, settlement, and uplift stability l

12/15/81 CP Co letter on the Analysis of Buried Piping (Serial 15093) 02/18-19/82 Applicant and NRC testimony presented at Midland Soil Hearings l

  • Note: This is a listing of only the reference information and the subsections of this SRP which relate to soils settlement issues for Midland Units 1 and 2.

Other information not related to soils issues can be found in the Midland FSAR l

or in separate submittals, meeting notes, etc.

1 rp0482-1759e102 l

2 I.1.f Protection from Natural Phenomenon and External Missiles 12/15/81 CP Co letter on the Analysis of Buried Piping (Serial 15093) 03/10/82 Settlement of underground fuel tanks due to seismic shakedown (Serial 16243) 03/03/82 Meeting to discuss the liquefaction potential of loose sand layer (s) 03/19/82 Telecon with Paul Hadala (US Corps of Engineers WES) concerning liquefaction of loose sand layer (s) 03/30/82 Telecon with J Kane/P Hadala on additional boring data for the buried fuel tanks 02/18-19/82 Applicant and NRC testimony presented at Midland Soil Hearings rp0482-1759e102