ML20054C339
| ML20054C339 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 04/13/1982 |
| From: | Linder F DAIRYLAND POWER COOPERATIVE |
| To: | Crutchfield D Office of Nuclear Reactor Regulation |
| References | |
| LAC-8214, NUDOCS 8204200397 | |
| Download: ML20054C339 (1) | |
Text
D DA/RYLAND h
[k COOPERAT/VE
- PO BOX 817
- 2615 EAST AV SOUTH
- LA CROSSE. WISCONSIN 54601 (608) 788-4000 April 13,1982 In reply, please refer to LAC-8214 DOCKET NO. 50-409 Director of Nuclear Reactor Regulation A
Division of Operating Reactors to ATTN:
Mr. Dennis M. Crutchfield, Chief Operating Reactors Branch No. 5 8
U. S. Nuclear Regulatory Commission RECEfYEIp Washington, D. C.
20555 p.;
APR 191982>
~
SUBJECT:
DAIRYLAND POWER COOPERATIVE m anas %%
LA CROSSE BOILING WATER REACTOR (LACBWR)
E, " 78 PROVISIONAL OPERATING LICENSE NO. DPR-45
//
FULL TERM LICENSE APPLICATION -
t TECHNICAL INFORMATION - SEISMIC N
REFERENCE:
(1) DPC Letter, Linder to Director NRR, LAC-5478, dated September 26, 1978 Gentlemen:
Pending resolution of recently identified differences in the installed configuration of a small portion of high pressure core spray discharge line piping versus the configuration analyzed in Nuclear Energy Services Report No.
81 A0091, " Seismic and Stress Analysis of the LACBWR High Pressure Core Spray Discharge Line Piping System," dated May 10, 1977 which was forwarded to you by Reference 1, it is requested that NRC review of the report be held in abeyance. A detennination of necessary corrections is expected to be completed by May 3, 1982.
Very truly yours, DAIRYLAND POWER COOPERATIVE h/20/nb 9 b'll Frank Linder, General Manager FWL:RES:ene cc:
J. Keppler, Regional Director, Region III NRC Resident inspector ON WP-1 ll g 8204200397 820413 PDR ADOCK 05000409 p