Forwards QA Program Insp Rept 99900100/82-02 on 820127-28 & Notice of Nonconformance
ML20054C329
Person / Time
Issue date: 04/01/1982
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mignogna T
LIMITORQUE CORP.
Shared Package
ML20054C330 List:
References
REF-QA-99900100 NUDOCS 8204200381
Download: ML20054C329 (3)


Text

  • -

D s.

,o t

N Docket No. 99900100/82-02

\\

/

6 3

G Limitorque Corporation ej 6gg#

-'5 ATTil: 11r. T. Hignogna W

cf 5114 Woodall Road 4

%g

+ r President r

6 S T. N f

l Lynchburg, VA 14502 Gentlemen:

/g ;, C)

This refers to the inspection conducted by 14r. Wm. D. Kelley of this i

office on January 27-28, 1982, of your facility at Lynchburg, Virginia, associated with the manufacture of electric motor actuated valve opera-i i

tors and to the discussions of our findings with you and members of l

your staff at the conclusion of the inspection.

This inspection was made as a result of:

(1) construction deficiency reports by: (a) Consumers Power Company concerning the installation of 4

underrated terminal blocks on component cooling water and service water system electric motor actuated valve operators at the Midland fluclear Power Plant, Units 1 and 2; and (b) Louisiana Power and Light l

Company concerning the furnishing to Waterford Generating Station, Unit 3, of valve operators which contained motor pinion gear keys that had been made from a wrong material; and (2) a 10 CFR Part 21 j

report by Bechtel Power Corporation concerning the furnishing to Southern California Edison San Onofre fluclear Generating Station,

[

Units 2 and 3, of original and replacement motor pinion gear keys i

which had been made from a wrong material.

Areas examined and our findings are discussed in the enclosed report.

Llithin these areas, the inspection consisted of an examination of pro-cedures and representative records, interviews with personnel, and ob-servations by the inspector.

i OS M

8204200381 820401 PDR GA999 EMVLMIT

//

99900100 PDR ND) m RIV Ll;KD NM___

._n

)

..ue.otah"' s...xvs* eye ~.it nwns NV N M o" '" >

..uoxency/.r.f....Isarnas.

~~~>...... 3/.ef/ja

.,3pgp2,

. 2g,sa 2g82

.,g82

=5

.5...6 nuc ronu aie oo.ao,~wcu ono OFFICIAL REXC@FdFCD @l61231 3

k Limitorque Corporation During the inspection it was found that the implementation of your QA program failed to meet certain HRC requirements. The specific findings and references to the pertinent requirements are identified in the enclo-sures to this letter.

Please provide us within 30 days from the date of this letter a written statement containing: (1) a description of steps that have been or will be taken to correct these items; (2) a description of steps that have been or will be taken to prevent recurrence; and (3) the date your corrective actions and preventive measures were or will be completed. Consideration may be given to extending your response time for a good cause shown.

The response requested by this letter is not subject to the clearance pro-cedures of the Office of lianagement and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is neces-sary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) subnit within 25 days from the date of this letter a written applica-tion to this office to withhold such information.

If your receipt of this letter has been delayed such that less than 7 days are available for your review, please notify this office promptly so that a new due date may be established. Consistent with Section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the informa-tion which identifies the document or part sought to be withheld, and which contains a full statement of the reasons on the basis which it is Cldined that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.

If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the PuMic Docunent Room.

^ " >

""c'

"""*"**""C" OFFICIAL RECORD COPY

c-f

.t.imitorque Corporation Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, Uldis Potapovs, Chief Vendor Program Branch

Enclosures:

1.

Appendix A - Notice of Ponconformance 2.

Appendix B - Inspection Report No. 99900100/82-02 3.

Appendix C - Inspection Data Sheets (3 pages) bcc:

IE Files AE0D NMSS QAB NRC:PDR Reg. Administrators, I, II, III, IV, V KVSeyfrit, RIV NBB&PVI

"'C'>

ounem)

DATEf

- - - - ". ' ' " ' ' ~ " -' " " * " " ', -

-- OF,FICIAL RECORD COPY _ _ _ _ _ _ _ _ _ _ _. _ _ _ _ _ _

""C'

.