Category:CORRESPONDENCE-LETTERS
MONTHYEARML20073B9901991-06-18018 June 1991 Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20133H1851985-07-30030 July 1985 Forwards Executed Amend 8 to Indemnity Agreement E-55, in Response to 850719 Amend 8 Terminating License R-121 ML20132D1881985-07-19019 July 1985 Forwards Order Terminating License R-121 for California Polytechnic State Univ,Per 810430,0908 & 850130 Requests. Safety Evaluation & Notice of Environ Assessment & Finding of No Significant Environ Impact Also Encl ML20101T3261985-01-30030 January 1985 Requests Termination of License R-121,decommissioning Reactor & Release of Facility for Uncontrolled Use.Reactor Dismantled.All Fuel & Components Removed from Facility. Radiation Reduced to Background Levels ML20101T3281985-01-30030 January 1985 Requests Termination of License R-121,decommissioning Reactor & Release of Facility for Uncontrolled Use.Reactor Dismantled.All Fuel & Components Removed from Facility. Radiation Reduced to Background Levels ML20077H0801983-08-0404 August 1983 Forwards Predismantling (Post-Fuel Removal) Surface Contamination Survey of AGN-201 Reactor & Facility. NRC Insp Schedule Before Approval for Removal of Reactor or Associated Equipment Requested ML20054G8861982-06-17017 June 1982 Submits Third Progress Rept for Dismantling Plan.Fuel Will Not Be Unloaded Until Sept 1982 Due to Absence of Radiation Safety Officer & Vendor Inability to Supply Certified Shipping Containers.Shipping Instructions Requested ML20054C3051982-04-13013 April 1982 Submits Second Progress Rept for Dismantling Plan.Schedule for Fuel Removal from AGN-201 Reactor Delayed to Comply W/ New Regulations & Instrument Problems.Resignation of Campus Radiation Safety Officer Complicates QA Documentation ML20003H8691981-04-30030 April 1981 Forwards Dismantling & Disposal Plan,AGN-201 Reactor, in Support of Univ Decision to Shut Down,Decommission & Remove Reactor from Mechanical Engineering Lab ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility ML19290D9211980-02-22022 February 1980 Requests Prompt Advice Re 791105 Request for Amend to License R-121 for Possession Only of Nuclear Matl ML19309E5351979-11-0505 November 1979 Request That License R-121 Be Amended to Authorize Possession Only.Core Fuel Will Remain Inside Reactor Until NRC Approval for Dismantling Is Obtained ML20132A9551979-08-14014 August 1979 Forwards IE Info Notice 79-20, NRC Enforcement Policy - NRC Licensed Individuals. No Action Required ML19289D5771979-02-27027 February 1979 Forwards Annual Operating Rept 1978. Requests Info on Dismantling Reactors ML20062E4081978-11-29029 November 1978 Requests Info Re Procedures for Converting AGN-201 Training Reactor to Simulator.Plans to Remove Fuel from Core & Store It in Locked Vault or Ship It Wherever NRC Requires IR 05000394/19780021978-11-27027 November 1978 Forwards IE Inspec Rept 50-394/78-02 on 781106-08 During Which No Items of Noncompliance Were Noted.Encl Withheld (Ref 10CFR2.790) 1991-06-18
[Table view] Category:EDUCATIONAL INSTITUTION TO NRC
MONTHYEARML20133H1851985-07-30030 July 1985 Forwards Executed Amend 8 to Indemnity Agreement E-55, in Response to 850719 Amend 8 Terminating License R-121 ML20101T3261985-01-30030 January 1985 Requests Termination of License R-121,decommissioning Reactor & Release of Facility for Uncontrolled Use.Reactor Dismantled.All Fuel & Components Removed from Facility. Radiation Reduced to Background Levels ML20077H0801983-08-0404 August 1983 Forwards Predismantling (Post-Fuel Removal) Surface Contamination Survey of AGN-201 Reactor & Facility. NRC Insp Schedule Before Approval for Removal of Reactor or Associated Equipment Requested ML20054G8861982-06-17017 June 1982 Submits Third Progress Rept for Dismantling Plan.Fuel Will Not Be Unloaded Until Sept 1982 Due to Absence of Radiation Safety Officer & Vendor Inability to Supply Certified Shipping Containers.Shipping Instructions Requested ML20054C3051982-04-13013 April 1982 Submits Second Progress Rept for Dismantling Plan.Schedule for Fuel Removal from AGN-201 Reactor Delayed to Comply W/ New Regulations & Instrument Problems.Resignation of Campus Radiation Safety Officer Complicates QA Documentation ML20003H8691981-04-30030 April 1981 Forwards Dismantling & Disposal Plan,AGN-201 Reactor, in Support of Univ Decision to Shut Down,Decommission & Remove Reactor from Mechanical Engineering Lab ML19290D9211980-02-22022 February 1980 Requests Prompt Advice Re 791105 Request for Amend to License R-121 for Possession Only of Nuclear Matl ML19309E5351979-11-0505 November 1979 Request That License R-121 Be Amended to Authorize Possession Only.Core Fuel Will Remain Inside Reactor Until NRC Approval for Dismantling Is Obtained ML19289D5771979-02-27027 February 1979 Forwards Annual Operating Rept 1978. Requests Info on Dismantling Reactors ML20062E4081978-11-29029 November 1978 Requests Info Re Procedures for Converting AGN-201 Training Reactor to Simulator.Plans to Remove Fuel from Core & Store It in Locked Vault or Ship It Wherever NRC Requires 1985-07-30
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20073B9901991-06-18018 June 1991 Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20133H1851985-07-30030 July 1985 Forwards Executed Amend 8 to Indemnity Agreement E-55, in Response to 850719 Amend 8 Terminating License R-121 ML20101T3261985-01-30030 January 1985 Requests Termination of License R-121,decommissioning Reactor & Release of Facility for Uncontrolled Use.Reactor Dismantled.All Fuel & Components Removed from Facility. Radiation Reduced to Background Levels ML20101T3281985-01-30030 January 1985 Requests Termination of License R-121,decommissioning Reactor & Release of Facility for Uncontrolled Use.Reactor Dismantled.All Fuel & Components Removed from Facility. Radiation Reduced to Background Levels ML20077H0801983-08-0404 August 1983 Forwards Predismantling (Post-Fuel Removal) Surface Contamination Survey of AGN-201 Reactor & Facility. NRC Insp Schedule Before Approval for Removal of Reactor or Associated Equipment Requested ML20054G8861982-06-17017 June 1982 Submits Third Progress Rept for Dismantling Plan.Fuel Will Not Be Unloaded Until Sept 1982 Due to Absence of Radiation Safety Officer & Vendor Inability to Supply Certified Shipping Containers.Shipping Instructions Requested ML20054C3051982-04-13013 April 1982 Submits Second Progress Rept for Dismantling Plan.Schedule for Fuel Removal from AGN-201 Reactor Delayed to Comply W/ New Regulations & Instrument Problems.Resignation of Campus Radiation Safety Officer Complicates QA Documentation ML20003H8691981-04-30030 April 1981 Forwards Dismantling & Disposal Plan,AGN-201 Reactor, in Support of Univ Decision to Shut Down,Decommission & Remove Reactor from Mechanical Engineering Lab ML19290D9211980-02-22022 February 1980 Requests Prompt Advice Re 791105 Request for Amend to License R-121 for Possession Only of Nuclear Matl ML19309E5351979-11-0505 November 1979 Request That License R-121 Be Amended to Authorize Possession Only.Core Fuel Will Remain Inside Reactor Until NRC Approval for Dismantling Is Obtained ML19289D5771979-02-27027 February 1979 Forwards Annual Operating Rept 1978. Requests Info on Dismantling Reactors ML20062E4081978-11-29029 November 1978 Requests Info Re Procedures for Converting AGN-201 Training Reactor to Simulator.Plans to Remove Fuel from Core & Store It in Locked Vault or Ship It Wherever NRC Requires 1991-06-18
[Table view] |
Text
r 1 j D Cz\ U FOIRNI A l'OLYTECllNIC STr\TE l'NI\'ERSITY
? i N 1.I 12 Oni? PO, C \ I.!!O R Ni ; i > m r. p i si5 i 5 Wi!!] .g g
/ ,g;f ~@yy
%. s%
^$ f f qr k & O,f, - g m 3 %
-. WW "~
9?
s 3
April 13, 1982 C; ,, pq W32[{ j,1,
, cr- e(
f,,g."
y, o , a
,p Director Division of Operating Reactors Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C. 20555 Attn: Mr. John F. Stolz, Chief, Operating Reactors Branch #4
Subject:
Docket No. 50-394, License No. R-121 Second Progress Report for Dismantling Plan Since a nunber of people in various agencies are concerned with the time schedule for fuel removal from our N;N-201 reactor, this Second Progress Report will serve to keep them informed. There have been certain delays in order to comply with new regulations, as well as instrument problems. Tentatively the schedule is now for spent fuel removal about the middle of May, 1982.
The original linear rate meter on the reactor console, which is one of the two channels required to be operable during spent fuel removal according to the previously approved dismantling plan, has been sent to the Electronics Department (on campus) for repair.
We are in the process of re-installing it and calibrating it in hopes that we can get it working satisfactorily. Preliminary arrangements have also been made to obtain two shipping containers for packaging the spent fuel disks. The necessary documentation for a quality-assurance program is now being prepared for approval by the NRC, Operating Reactor Branch, but is complicated by the fact that the campus Radiation Safety Officer recently resigned and is now employed in that capacity at the University of Southern f California. We are in hopes that he can return for several days /
at the time we are ready to remove fuel. j /g Another reason for delay is the prospective absence of our licensed Senior Reactor Operator, R. Fisher, of PG&E (Diablo Canyon Project), who will be working at the Trojan Nuclear Power Plant in Oregon until May 5th.
T!!!: C \l.l!VRNi \ FT.\'l E I'XIi~ER61TY & C01.!E;E; 8204200333 020413 PDR ADOCK 05000394 W PDR
- c.
Docket No. 50-394, License No. R-121 Second Progress Report for Dismantling Plan April 14, 1982 Page 2 To date, we still have not received answers to the several questions raised in my letter of March 2, 1982, addressed to Malcolm Theisen (Director, Weapons Division, DOE, Oak Ridge, Tennesse) in connection with the shipping instructions for the fuel once we have gotten it packaged. We would appreciate your help in getting this information in the near term.
Sincerely, t 'z h M' Robert W. Adamson, Reactor Administrator and Professor Aeronautical and Mechanical Engineering Department Office: 805/546-1115 Residence: 805/544-5957 cc: Peter B. Erickson, Operating Reactors Branch #4, USNRC R. H. Engelken, Director, Region V, USNRC 1990 N. California Boulevard, Suite 202 Walnut Creek Plaza, Walnut Creek, CA 94596 Attn: Phil Johnson and Amelio Garcia Director for Operating Reactors Division of Licensing, USNRC Washington, D.C. 20555 Malcolm Theisen, Weapons Division, DOE P.O. Box E, Oak Ridge, TN 37830 R. L. Fisher, SRO Unit #1, Diablo Canyon Pacific Gas & Electric Company P.O. Box 56 Avila Beach, CA 93424 Dr. Leonard, IRM 428 Fourth Street, Annapolis, MD 21403 John Pickering, Radiation Safety Officer Univesity of Southern California University Park, Los Angeles, CA 90007 A.Z. Rosen, Professor, Physics Department, CPSU/ SLO R.G. Gordon, Head, Aero/ME Department, CPSU/ SLO M.E. Weber, Technician, Aero/ME Department, CPSU/ SLO