Docket No. 50-346 License No. NPF-3 TOLEDO Num EDISON Serial No. 1-257 ROtARO P. Cnoust April 8, 1982 37 14191259 5221
/ PRD;CIPAL STF/
DIR [675FI V
James G. Keppler, Regional Administrator D/D
.FAQ I
Region III A/D 90 United States Nuclear Regulatory Commission 799 Roosevelt Road DR&PI Glen Ellyn, Illinois 60137 l3y37
Dear Mr. Keppler:
On January 29, 1982 (Serial 1-244) and February 4, 1982 (Serial 1-247) Toledo Edison Company notified you of deficiencies in the prompt notification system for the 10-mile EPZ of the Davis-Besse Nuclear Power Station, Unit 1.
At that time, five sirens of the total 42-siren system, were inoperable due to problems with the radio decoders.
On Wednesday, March 31, 1982, a test of the full siren system w3s conducted by the Ottawa County Disaster Services Agency, as part of the statewide Tornado Safety Program.
Spotters from Toledo Edison Company were placed at each of the previously inoperable sirens to verify the deficiency corrections.
Four of the five sirens operated as designed; one failed to operate. A check of that unit revealed mechanical failures which have since been corrected. The unit was tested and it is now operational.
Based on these results, we are notifying you that all deficiencies identified l
on January 29, 1982 and February 4, 1982 have been corrected.
Should you have any further questions, contact Judith Hirsch, Emergency Planning Supervisor, at 419-259-2377.
Very truly yours, h-
//
cGk9 ;,9
., r
.g \\937.7 d h
49 pr%prW RPC:Jil:nif
. pF
'y cc:
DB-1 NRC Resident Inspector O
k3 NRR Project Manager g/
/
9 8204200194 820408
.. /
PDR ADOCK 05000346 THE TOLEDO EDISON COMP NY tuiduN PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 APR 12 seg
.