ML20054B573
ML20054B573 | |
Person / Time | |
---|---|
Site: | Byron, Braidwood, South Texas, 05000000, 05000545 |
Issue date: | 04/07/1982 |
From: | Tramm T COMMONWEALTH EDISON CO. |
To: | Harold Denton Office of Nuclear Reactor Regulation |
Shared Package | |
ML20054B574 | List: |
References | |
3834N, NUDOCS 8204160608 | |
Download: ML20054B573 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999
[Table view]Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested ML20217M2871999-10-21021 October 1999 Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217K9341999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-4 for Relief from ASME Code,Section XI, Nondestructive Exam Requirements Applicable to Stp,Units 1 & 2,reactor Vessel Closure Head Nuts ML20217K9091999-10-15015 October 1999 Forwards SER Accepting Util 990609 Relief Request RR-ENG-2-3 from ASME Code,Section Xi,Nondestructive Exam Requirements Applicable to South Texas Project,Units 1 & 2, Pressurizer Support Attachment Welds ML20217G9791999-10-14014 October 1999 Forwards SE Accepting Relief Requests to Rev 5 of First 10-year Interval Inservice Insp Program for Plant,Units 1 & 2 NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future ML20217C3221999-10-0707 October 1999 Forwards Insp Repts 50-498/99-16 & 50-499/99-16 on 990808-0918.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20212L1651999-09-30030 September 1999 Responds to STP Nuclear Operating Co 981012 & s Which Provided Update to TS Bases Pages B 3/4 8-14 Through B 3/4 8-17.NRC Staff Found Change Consistent with TS 3/4.8.2 DC Sources. Staff Found & Deleted Typographical Error 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr ML20212J7141999-09-29029 September 1999 Forwards Insp Repts 50-498/99-15 & 50-499/99-15 on 990920-24 at South Texas Project Electric Generating Station.No Violations Noted.Insp Covered Requalification Training Program & Observation of Requalification Activities ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20217A9311999-09-29029 September 1999 Informs That NRC 6-month Review of Braidwood Identified That Performance in Maint Area Warranted Increased NRC Attention. Addl Insps Beyond Core Insp Program Will Be Conducted Over Next 6 Months to Better Understand Causes of Problem NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr ML20212J0651999-09-27027 September 1999 Discusses Licensee 980330 Response to GL 97-06, Degradation of SG Internals. Concludes That Response to GL Provides Reasonable Assurance That Condition of SG Internals in Compliance with Current Licensing Bases for Facility ML20212F1791999-09-24024 September 1999 Discusses 990923 Meeting Conducted in Region IV Ofc Re Status of Activities to Support Confirmatory Order, ,modifying OL & to Introduce New Director,Safety Quality Concerns Program.List of Attendees Encl ML20212E9091999-09-23023 September 1999 Discusses GL 98-01, Year 2000 Readiness of Computer Sys at Npps, Supplement 1 & STP Nuclear Operating Co Response for STP Dtd 990629.Understands That at Least One Sys or Component Listed May Have Potential to Cause Transient ML20216H4301999-09-23023 September 1999 Informs That Arrangements Made for Administration of Licensing re-take Exams at Braidwood Generating Station for Week of 991108 ML20212F2111999-09-22022 September 1999 Forwards Review of SG 90-day Rept, South Texas Unit-2 Cycle 7 Voltage-Based Repair Criteria Rept, Submitted by Util on 990119 NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20216F7441999-09-17017 September 1999 Forwards Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824.Three Violations Noted & Being Treated as Ncvs. Insp Focused on C/As & Activities Addressing Technical Concerns Identified During Design Insp Completed on 980424 ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified ML20212D9171999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of South Texas Project & Identified No Areas in Which Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through Mar 2000 & Historical Listing of Plant Issues,Encl ML20216F5471999-09-15015 September 1999 Discusses 990914 Meeting Conducted at Region Iv.Meeting Was Requested by Staff to Introduce New Management Organization to Region IV & to Discuss General Plant Performance & Mgt Challenges IR 05000498/19990121999-09-14014 September 1999 Forwards Insp Repts 50-498/99-12 & 50-499/99-12 on 990816-19.Three Violations Occurred & Being Treated as Ncvs. Areas Examined During Insp Included Portions of Access Authorization & Physical Security Programs 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER ML20212A6991999-09-10010 September 1999 Forwards SE Accepting Licensee Second 10-year Interval ISI Program Request for Relief 12R-07 for Plant,Units 1 & 2 ML20211P8201999-09-0909 September 1999 Forwards SE Authorizing 990224 Submittal of First 10-year Interval ISI Program Plan - Relief Request RR-ENG-24,from ASME Section XI Code,Table IWC-2500-1 NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211P7871999-09-0909 September 1999 Forwards Safety Evaluation Re First 10-yr Interval Inservice Insp Program Plan Request for Relief RR-ENG-31 ML20211P7671999-09-0909 September 1999 Forwards SER Authorizing Licensee 990517 Alternative Proposed in Relief Request RR-ENG-2-8 to Code Case N-491-2 for Second 10-year Insp Interval of South Texas Project, Units 1 & 2,pursuant to 10CFR50.55a(a)(3)(i) ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed 1999-09-09 Category:INCOMING CORRESPONDENCE MONTHYEARNOC-AE-000675, Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested1999-10-21021 October 1999
[Table view]Forwards Clarification on Items Included in 990531 Response to RAI Re Proposed License Amend Associated with Operator Action for Sbloca,As Requested ML20217P6171999-10-21021 October 1999 Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) NOC-AE-000680, Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan1999-10-20020 October 1999 Forwards Rev 5 to 0PGP03-ZV-0001, Severe Weather Plan NOC-AE-000683, Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii)1999-10-19019 October 1999 Forwards 30-day Rept Concerning Significant Changes to Accepted Large Break Loss of Coolant Accident ECCS Evaluation Model for South Tx Project,Units 1 & 2,IAW 10CFR50.46(a)(3)(ii) ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl 05000498/LER-1999-008, Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER1999-10-12012 October 1999 Forwards LER 99-008-00 Re Turbine Trip That Occurred While Performing Main Turbine Emergency Trip Test.Commitments Made by Licensee Are Listed in Corrective Actions Section of LER NOC-AE-000674, Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule1999-10-12012 October 1999 Forwards Requested Estimates of Needs for Operator Licensing Exams,Per AL-99-03, Operator Licensing National Exam Schedule NOC-AE-000610, Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Nondestructive Exam Requirements of IWA-5250(a)(2) for Second Inservice Insp Interval,Per Provisions of 10CFR50.55a(3)(i) NOC-AE-000653, Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i)1999-10-0707 October 1999 Requests Relief from ASME Section XI Code Requirements of Table IWE-2500-1 for VT-3 Visual Exam of Seals & Gaskets on Airlocks,Hatches & Other Devices Required to Assure Containment leak-tight Integrity,Per 10CFR50.55a(a)(3)(i) NOC-AE-000625, Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future1999-10-0707 October 1999 Requests Partial Relief from ASME Section XI Visual Exam Requirements of IWA-5242(a).Relief Request Is Based on Provisions of Draft ASME Section XI Code Case N-616,which Is Expected to Be Published in Near Future NOC-AE-000664, Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr1999-09-30030 September 1999 Forwards Rev 1 to STP Electric Generating Station Unit 1 Cycle 9 COLR & Rev 1 to STP Electric Generating Station Unit 2 Cycle 7 Colr 05000499/LER-1999-006, Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment1999-09-30030 September 1999 Forwards LER 99-006-00,re Entry Into TS 3.0.3.Licensee Commitments Listed in Corrective Actions Section of Attachment ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr NOC-AE-000646, Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr1999-09-28028 September 1999 Informs NRC That STP Nuclear Operating Co Is Y2K Ready IAW Nei/Nusmg 97-07 Guidelines & Also Provides Response to NRC Ltr NOC-AE-000649, Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P1999-09-21021 September 1999 Forwards Current Annual Financial Data for STP Electric Generating Station Per 10CFR50.71(b),acting on Behalf of Central Power & Light Co,City of Austin,Tx,City Public Svc Board of San Antonio & Hl&P NOC-AE-000634, Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl1999-09-21021 September 1999 Forwards Addl Info Re GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Povs. MOV design-basis Review Checklist,Encl NOC-AE-000633, Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 19971999-09-21021 September 1999 Forwards Rev 3 to SG-99-04-005, STP 1RE08 Outage Condition Monitoring Rept & Final Operational Assessment. Rept Satisfies Reporting Requirements of NEI 97-06,dtd Dec 1997 05000499/LER-1999-005, Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-09-20020 September 1999 Forwards LER 99-005-00,re Esfa Following Loss of Power to Standby Transformer 2 Due to Electrical Fault.Licensee Commitments Are Listed in Corrective Actions Section of LER 05000498/LER-1999-007, Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER1999-09-13013 September 1999 Forwards LER 99-007-00 Re Train 'B' CR Makeup & Cleanup Filtration Sys Being Inoperable for Greater than Aot.Util Intends to Append Addl Info Section of LER with Brief Description of Test Results,Rather than Submit Separate LER NOC-AE-000638, Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6)1999-09-0909 September 1999 Forwards License Renewal Applications & Certifications of Medical Exam for Seven Listed Licensed Operators at Stp,Per 10CFR55.57.Encl Withheld,Per 10CFR2.790(a)(6) ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed NOC-AE-000562, Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i)1999-08-31031 August 1999 Requests Relief from Contruction Code non-destructive Exam Requirements for Repair/Replacement Activities During Second Inservice Insp Interval of Units 1 & 2,IAW Provisions of 10CFR50.55a(a)(3)(i) ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) NOC-AE-000617, Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d)1999-08-26026 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d) NOC-AE-000585, Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-4811999-08-25025 August 1999 Provides Notification That South Texas Project Has Completed Integrity Evaluation of Units 1 & 2 Reactor Coolant Pump Casings Required by Paragraph (D) of Code Case N-481 BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. NOC-AE-000603, Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6)1999-07-29029 July 1999 Informs of Addition of Restriction to SRO License 42658, for KM Espinoza,Effective 990721,per 10CFR50.74.Encl Info Withheld,Per 10CFR2.790(a)(6) NOC-AE-000470, Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl1999-07-28028 July 1999 Forwards Amend 12 to STP Fire Hazards Analysis Rept. Summary of Changes Made Under Provision of 10CFR50.59 Also Encl BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr NOC-AE-000599, Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr1999-07-28028 July 1999 Forwards STP Unit 1,Cycle 9 Startup Testing Summary Rept. No New Licensing Commitments Contained in Ltr NOC-AE-000589, Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/20001999-07-26026 July 1999 Forwards Rev to 1RE08 ISI Summary Repts for Repairs & Replacements & for Sys Pressure Tests,Corecting Date of End of Insp Interval Provided in Item 9 of from NIS-1 from 09/24/99 to 09/24/2000 NOC-AE-000582, Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports1999-07-26026 July 1999 Forwards 1RE08 ISI Summary Rept for Welds & Component Supports of STP Electric Generating Station,Unit 1. Summary Rept Satisfies Reporting Requirements of IWA-6000 of Section XI for Welds & Component Supports 05000498/LER-1999-006, Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER1999-07-26026 July 1999 Forwards LER 99-006-00 Re Automatic Reactor Trip Due to over-temp delta-temp Actuation.Licensee Commitments Are Listed in Corrective Actions Section of LER ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition NOC-AE-000597, Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-051999-07-23023 July 1999 Forwards voltage-based Criteria 90-day Rept for SG Tube Exam Performed Under NRC GL 95-05 During Refueling Outage 1RE08. Rept Contains Info Required by Section 6.b of Attachment 2 to GL 95-05 NOC-AE-000598, Forwards Four Copies of 1RE08 Refueling Outage ISI Summary Rept for Steam Generator Tubing1999-07-23023 July 1999 Forwards Four Copies of 1RE08 Refueling Outage ISI Summary Rept for Steam Generator Tubing NOC-AE-00586, Forwards Results of Control Rod Testing,In Response to NRC Bulletin 96-01, Control Rod Insertion Problems, Dtd 960308.Core Map Provided to Assist in Understanding Test Data1999-07-21021 July 1999 Forwards Results of Control Rod Testing,In Response to NRC Bulletin 96-01, Control Rod Insertion Problems, Dtd 960308.Core Map Provided to Assist in Understanding Test Data NOC-AE-000595, Forwards Chapters 1.0 & 16.0 to Operations QA Plan for South Texas Project.Rev Is Strictly Administrative & All Content Was Previously Submitted to NRC on 990503 & 9906151999-07-21021 July 1999 Forwards Chapters 1.0 & 16.0 to Operations QA Plan for South Texas Project.Rev Is Strictly Administrative & All Content Was Previously Submitted to NRC on 990503 & 990615 ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 1999-09-09 Category:UTILITY TO NRC MONTHYEARST-HL-AE-3578, Forwards 1RE02 Inservice Insp Summary Rept for Welds & Component Supports..., Describing Exams Performed During Period of 900329-0621,per 1983 Edition of ASME Code,Section XI & Summer 1983 Addenda1990-09-20020 September 1990
[Table view]Forwards 1RE02 Inservice Insp Summary Rept for Welds & Component Supports..., Describing Exams Performed During Period of 900329-0621,per 1983 Edition of ASME Code,Section XI & Summer 1983 Addenda ST-HL-AE-3577, Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule1990-09-18018 September 1990 Responds to Generic Ltr 90-07, Operator Licensing Natl Exam Schedule ML20059K6741990-09-17017 September 1990 Suppls Responses to Violations Noted in Insp Repts 50-454/89-11,50-455/89-13,50-456/89-11 & 50-457/89-11. Corrective Actions:Procedures Changed & Valve Tagging Status Provided ML20059K5081990-09-14014 September 1990 Forwards Tj Kovach to E Delatorre Re Visit by Soviet Delegation to Braidwood Nuclear Station in May 1990 ST-HL-AE-3570, Forwards Rev 5 to, South Texas Project Unit 1 Pump & Valve Inservice Test Plan1990-09-14014 September 1990 Forwards Rev 5 to, South Texas Project Unit 1 Pump & Valve Inservice Test Plan ST-HL-AE-3567, Requests NRC Review of Proposed Rev to Schedule for Inservice Insp Exam of Class 1,Category B-D Vessel Nozzles1990-09-14014 September 1990 Requests NRC Review of Proposed Rev to Schedule for Inservice Insp Exam of Class 1,Category B-D Vessel Nozzles ST-HL-AE-3565, Forwards Rev 8 to Operations QA Plan. Plan Revised in Order to Include More Detailed Criteria of Chapter 17.2 of Updated Fsar.Approval Requested1990-09-10010 September 1990 Forwards Rev 8 to Operations QA Plan. Plan Revised in Order to Include More Detailed Criteria of Chapter 17.2 of Updated Fsar.Approval Requested ST-HL-AE-3553, Forwards WCAP-12629, Analysis of Capsule U from South Texas Unit 1 Reactor Vessel Radiation Surveillance Program. Pressure-temp Curves Currently in Use in Facility Tech Specs Are More Conservative than Presented in App a of Rept1990-09-10010 September 1990 Forwards WCAP-12629, Analysis of Capsule U from South Texas Unit 1 Reactor Vessel Radiation Surveillance Program. Pressure-temp Curves Currently in Use in Facility Tech Specs Are More Conservative than Presented in App a of Rept ML20059L6611990-09-10010 September 1990 Forwards Byron Station Units 1 & 2 Inservice Insp Program ST-HL-AE-3546, Forwards Corrected Semiannual Radioactive Effluent Release Rept for Second Half of 19891990-08-28028 August 1990 Forwards Corrected Semiannual Radioactive Effluent Release Rept for Second Half of 1989 ST-HL-AE-3540, Provides Schedule Under Which Facility Turbine Components Inspected for Functional Integrity.Required Insp Intervals Calculated to Maintain Probability of Missile Generation for Each Low Pressure Rotor1990-08-28028 August 1990 Provides Schedule Under Which Facility Turbine Components Inspected for Functional Integrity.Required Insp Intervals Calculated to Maintain Probability of Missile Generation for Each Low Pressure Rotor ST-HL-AE-3550, Forwards Semiannual fitness-for-duty Program Performance Rept for Jan-June 1990,per 10CFR26.71(d)1990-08-28028 August 1990 Forwards Semiannual fitness-for-duty Program Performance Rept for Jan-June 1990,per 10CFR26.71(d) ST-HL-AE-3551, Forwards Responses to NRC 900807 Request for Addl Info Re Probabilistic Safety Assessment Human Reliability Analysis. Paper on Quantification of Human Error Rates Using slim-based Approach Encl1990-08-26026 August 1990 Forwards Responses to NRC 900807 Request for Addl Info Re Probabilistic Safety Assessment Human Reliability Analysis. Paper on Quantification of Human Error Rates Using slim-based Approach Encl ML20064A3681990-08-24024 August 1990 Forwards Response to 900517 Request for Addl Info Re Design of Containment Hydrogen Monitoring Sys.Util Proposes Alternative Design That Ensures Both Containment Isolation & Hydrogen Monitoring Sys Operability in Event of LOCA ML20064A3751990-08-24024 August 1990 Forwards Revised Pages to Operating Limits Rept for Cycle 2, Correcting Fxy Portion of Rept,Per Tech Spec 6.9.1.9, Operating Limits Rept ML20064A0181990-08-16016 August 1990 Submits Supplemental Response to NRC Bulletin 88-008,Suppls 1 & 2.Surveillance Testing Revealed No Leakage,Therefore Charging Pump to Cold Leg Outage Injection Lines Would Not Be Subjected to Excessive Thermal Stresses ML20059A3991990-08-15015 August 1990 Forwards Response to NRC 900521 Request for Addl Info Re Plant Inservice Insp Program ML20063Q1051990-08-10010 August 1990 Forwards Monthly Operating Repts for Jul 1990 for Byron Units 1 & 2 & Corrected Monthly Operating Rept for June 1990 for Unit 2 ML20058N0551990-08-0707 August 1990 Provides Supplemental Response to NRC Bulletin 88-008, Suppls 1 & 2.Surveillance Testing Performed Revealed No Leakage,Therefore,Charging Pump to Cold Leg Injection Lines Would Not Be Subjected to Excessive Thermal Stresses ML20056A3351990-08-0202 August 1990 Responds to NRC Bulletin 88-009 Requesting That Addressees Establish & Implement Insp Program to Periodically Confirm in-core Neutron Power Reactors.All Timble Tubes Used at Plant Inspected & 18 Recorded Evidence of Degradation ML20055J1221990-07-25025 July 1990 Notifies That Plants Current Outage Plannings Will Not Include Removal of Snubbers.Removal of Snubbers Scheduled for Future Outages.Completion of Review by NRC by 900801 No Longer Necessary ML20055J1261990-07-25025 July 1990 Notifies That Replacement of 13 Snubbers w/8 Seismic Stops on Reactor Coolant Bypass Line Being Deferred Until Later Outage,Per Rl Cloud Assoc Nonlinear Piping Analyses ML20055H7631990-07-25025 July 1990 Forwards Financial Info Re Decommissioning of Plants ML20055H0291990-07-17017 July 1990 Forwards Revised Monthly Performance Rept for Braidwood Unit 2 for June 1990 ML20055G3251990-07-16016 July 1990 Responds to SALP Board Repts 50-454/90-01 & 50-455/90-01 for Reporting Period Nov 1988 - Mar 1990.Effort Will Be Made to Continue High Level of Performance in Areas of Radiological Controls,Plant Operations,Emergency Preparedness & Security ML20044A9621990-07-13013 July 1990 Forwards Rev 0 to Topical Rept NFSR-0081, Comm Ed Topical Rept on Benchmark of PWR Nuclear Design Methods Using PHOENIX-P & Advanced Nodal Code (Anc) Computer Codes, in Support of Implementation of PHOENIX-P & Anc ML20055G4631990-07-13013 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-456/90-08 & 50-457/90-08.Corrective Actions:Discrepancy Record for Cable Generated & Cable That Had Been Previously Approved for Use on Solenoid Obtained & Installed ML20044B1411990-07-12012 July 1990 Forwards Addl B&W Rept 77-1159832-00 to Facilitate Completion of Reviews & Closeout of Pressurized Thermal Shock Issue,Per NRC Request ML20044B2081990-07-11011 July 1990 Responds to Generic Ltr 90-04 Re Status of GSI Resolved W/ Imposition of Requirements or Corrective Actions.Status of GSI Implementation Encl ML20044B2141990-07-11011 July 1990 Withdraws 891003 Amend Request to Allow Sufficient Time to Reevaluate Technical Position & Develop Addl Technical Justification ML20044A9521990-07-10010 July 1990 Provides Supplemental Response to NRC Bulletin 88-001. Remaining 48 Breakers Inspected During Facility Spring Refueling Outage ML20044B2871990-07-0909 July 1990 Forwards Brief Description of Calculations Performed in Accordance W/Facility Procedure Used to Make Rod Worth Measurements,Per NUREG-1002 & Util 900629 Original Submittal ML20044A7991990-06-29029 June 1990 Forwards Description of Change Re Design of Containment Hydrogen Monitoring Sys,Per 900517 Request.Util Proposing Alternative Design Ensuring Containment & Hydrogen Monitoring Sys Operability in Event of Power Loss ML20055D4811990-06-29029 June 1990 Discusses Revised Schedule for Implementation of Generic Ltr 89-04 Re Frequently Identified Weaknesses of Inservice Testing Programs.All Procedure Revs Have Either Been Approved or Drafted & in Onsite Review & Approval Process ML20055D2951990-06-22022 June 1990 Discusses Results of 900529-0607 Requalification Exam.Based on Results of Exam,Station Removed/Prohibited Both Shift & Staff Teams & JPM Failure from License Duties.Shift Team Placed in Remediation Program from 900611-14 ML20058K3521990-06-22022 June 1990 Requests Withdrawal of 900315 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,changing Tech Specs 3.8.1.1 & 4.8.1.1.2 to Clarify How Gradual Loading of Diesel Generator Applied to Minimize Mechanical Stress on Diesel ML20043H6191990-06-21021 June 1990 Forwards 1989 Annual Financial Repts for Licensees for Plant ML20043H5971990-06-19019 June 1990 Forwards Responses to Open Items Resulting from Sandia Draft Rept on Probabilistic Safety Assessment.Dominant Sequence Model Encl,Per NRC Reviewers Request ML20043H7781990-06-18018 June 1990 Forwards Rev 1 to SER Commitment Status for Plant,Per NUREG-0781.List of Action Items Completed But Not Incorporated Into Sser & List of Items for Actions Not Completed Also Encl ML20056A0361990-06-15015 June 1990 Responds to NRC Re Violations Noted in Insp Repts 50-456/90-10 & 50-457/90-11.Corrective Action:Valve 2CS021b Returned & Locked in Throttle Position & Out of Svc Form Bwap 330-1T4 Modified ML20043F6261990-06-11011 June 1990 Forwards Rev 0 to Unit 1 Cycle 3 Core Operating Limits Rept. ML20043G5851990-06-0808 June 1990 Forwards Repts Re Valid & Invalid Test Failures Experienced on Diesel Generator (DG) 1DG01KB,1 Valid Test Failure on DG 2DGO1KA & 2 Invalid Test Failures Experienced on DG 2AGO1KB ML20043F3191990-06-0404 June 1990 Responds to NRC 900504 Ltr Re Violations Noted in Insp Repts 50-498/90-01 & 50-499/90-01.Corrective Actions:Compressed Gas Cylinders Removed from Power Block & Nashua 357 Tape Returned to Nuclear Purchasing Matl Mgt Co ML20043D3241990-06-0101 June 1990 Forwards Rev 10 to Safeguards Contingency Plan.Rev Withheld (Ref 10CFR73.21) ML20043D3141990-06-0101 June 1990 Forwards Rev 18 to Security Plan.Rev Withheld (Ref 10CFR73.21) ML20043D3151990-06-0101 June 1990 Forwards Rev 30 to Security Plan.Rev Withheld (Ref 10CFR73.21) ML20043E3141990-05-31031 May 1990 Withdraws 880302 Application for Amend to Licenses NPF-37, NPF-66,NPF-72 & NPF-77,changing Tech Spec 4.6.1.6.1.d to Reduce Containment Tendon Design Stresses to Incorporate Addl Design Margin,Due to Insufficient Available Data ML20043F4731990-05-30030 May 1990 Forwards Suppl to 881130 Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77.Changes Requested Per Generic Ltr 87-09,to Remove Unnecessary Restrictions on Operational Mode Changes & Prevent Plant Shutdowns ML20043C8641990-05-29029 May 1990 Forwards Rept of Local Leakage Rate Test Results for Third Refueling Outage.Leakage Rates of Six Valves Identified as Contributing to Failure of Max Pathway Limit ML20043B7771990-05-23023 May 1990 Forwards Endorsement 9 to Nelia & Maelu Certificates N-108 & M-108 & Endorsement 8 to Nelia & Maelu Certificates N-115 & M-115 1990-09-20 |
Text
7
. 3,.
'X. Commonwealth Edison 4, o
j j One First Pational Plaza. Chicigo. Illinois .
( ) Address Rrply to: Post Office Box 767
\ j Chicago Illinois 60690 April 7, 1982
\ffy/,
ns S '
d .%
,Q ?..$ f Mr. Harold R. Denton, Director .
Of fice of Nuclear Reactor Regulation 9'-
@,' S'Dpj/
/.,
~~ ~11 U.S. Nuclear Hegulatory Commission
~
Washington, DC q) g 20555 V '
O
Subject:
Byron Station Units 1 and 2 / @ \'
Braidwood Station Units 1 and 2 Transient Analysis Da ta NRC Docke t No s . 40-45 4, 50-455, 50-456 and 50-457 Refeence (a): October 6, 1981, letter from B. J. Youngblood t o L. De lGeo rg e .
Dea r Mr. Denton:
(a) This is in response to the request contained in reference for data tions to be performed on the Byron and Braidwood units for use in calcula-for the NRC's Reactor Systems Branch.
We have been informed that on December 11, 1981, Westinghouse this need by direct and thetransmittal NRC agreed of upon a plan which would satisfy information from Westinghouse.
The agreement is documented in reference (b), which is enclosed.
Accordingly, none of the requested data will be transmitted via Commonwealth Edison.
office. Please address questions regarding this matter to this One signed original and fif teen copies o f this letter and the enclosure are provided.
Ve ry truly yours, jk, dV" " 5 90 T.R. Tramm .c Nuclea r Licensing Administrato r 1m f f 3834N hA O
-_J