Text
..
L w
THE CINCINNATI GAS & ELECTRIC COMPANY set-CINCINN ATB,OHfo 4 52ot March 30, 1982 E. A. BORGMANN stNion vect PatsiotNT U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 q
ATTN:
Mr. J.G. Keppler Director 9-M
,d,,,y _, VE C u.
~
RE:
WM. H. ZIMMER NUCLEAR POWER STATION - UNIT 1 e
q-1 3 1982 6 @
NRC CIRCULAR 80-01, GENERAL ELECTRIC COMPANY c
h, ym mmy e~cgy
~
RELAYS WITH PETROLEUM JELLY LUBRICATED TIME 2[
- p l
DIALS, 10CFR50.55(c)-ITEM E9 DOCKET N0 50-358, CONSTRUCTION PERMIT CPPR-88,
/
W.O. 57300, JOB E-5590, FILE #NRC-7, ITEM E-9 G/
/
Gentlemen:
q This letter constitutes
- a. final report under 10CFR50.55(e) regarding General Electric Company type IAC Induction Disc Relays with petroleum jelly i
lubricated time dials. Our previous report to you regarding this matter was j
dated September 9, 1981.
As stated in previous reports, our investigation identified a total of one hundred and ninety-six (196) type IAC relays and nine (9) type IJCV re-lays which were to be replaced.
I All of the replacement relays have been received, tested, calibrated and installed. The defective relays have been removed from the ZPS-1 site. How-ever as stated in our last report, the General Electric Company had informed us that twenty-six (26) relays (Catalog 12AC51A801A) were shipped with a potential manufacturing defect in the insulation structure. These relays successfully passed a high potential insulation test as part of CG&E's accep-tance testing and are currently installed and in service. These relays will remain in service until additional replacement relays are installed.
1 1
f 21 I
B204160481 820330 i
j PDR ADOCK 05000357 S
PDR APR 1 M2
i e
March 30, 1982 Page 2 Mr. J.G. Keppler l
i 1
l 1
4
}
The twenty-six (26) additienal replacement relays have been received.
We anticipate completion of testing, calibration and installation of the 26 relays by August 31, 1982.
1 l
We trust that this will fulfill the requirements of a final report j
under 10CFR50.55(e).
Very truly yours, The Cincinnati Gas & Electric Company rf -
l E.A. Borgmann Senior Vice-President WPC/rfw i
cc: NRC Resident Inspector ATTN:
W.F. Cristianson NRC Office of Inspection & Enforcement Washington, D.C.