Forwards H Singh Testimony Re Plant Fill Problem,Diesel Generator Bldg
ML20054B154
Person / Time
Site: Midland
Issue date: 04/12/1982
From: Mccallister P
ARMY, DEPT. OF
To: Lear G
Office of Nuclear Reactor Regulation
Shared Package
ML20054B157 List:
References
NUDOCS 8204160356
Download: ML20054B154 (1)


Text

_

DEPARTMENT OF THE ARMY DETROf7 DISTRICT, CORPS OF ENGINEERS DE'ROIT M HIGAN 48231 12 APR1982 am vTO ATTENTION OF NCEED-T

SUBJECT:

Testimony Concerning the Plant Fill Problem, Diesel Generator Building, Midland Nuclear Power Plant Mr. George Lear U.S. Nuclear Regulatory Commission Chief, Hydrologic & GeoTechnical Engineering Branch Division of Engineering Mail Stop P-214 Washington, DC 20555

Dear Mr. Lear:

Attached is testimony from Mr. Hari Singh concerning the plant fill problem, diesel generator building at the indland Nuclear Power Plant.

Sincerely, Y

'CALLISTER, P.E. (fv-M., f, Engineering Division 1 Incl Chie As stated ts g

x q> 'N e

~

'4 :r";.5 4 E 9,

\\

V Mt.151982* D

la y

w ww arna pi n-S g3 GW 31 TEC ll

.y 1

A cf \\

8204160356 820412 PDR ADOCK 05000329 T

PDR

r

+

12 APR1982 fiCEED-T

SUBJECT:

Testineny Concerning the Plant Fill Probles, Diesel Generator Eu11 ding, Itidisnd Euclear rower Plant l

Mr. George Lear U.S. Nuclear Regulatory Connission Chief, liydrologie & GeoTechnical Engineering Branch j

Division of Engineering i

lhil Stop P-214 Washington, DC 20555 4

Dear Mr. Lears i

Attached 1s testimony from Mr. P.ari Singh concerning the plant fill problem, diesel generator buildin2 at the ladiand Nuclear Power Plant.

Sincerely, p

1 Inc1 P. McCA,Lf1 STER, P.E.

As stated Chief, Engineering Division