DEPARTMENT OF THE ARMY DETROf7 DISTRICT, CORPS OF ENGINEERS DE'ROIT M HIGAN 48231 12 APR1982 am vTO ATTENTION OF NCEED-T
SUBJECT:
Testimony Concerning the Plant Fill Problem, Diesel Generator Building, Midland Nuclear Power Plant Mr. George Lear U.S. Nuclear Regulatory Commission Chief, Hydrologic & GeoTechnical Engineering Branch Division of Engineering Mail Stop P-214 Washington, DC 20555
Dear Mr. Lear:
Attached is testimony from Mr. Hari Singh concerning the plant fill problem, diesel generator building at the indland Nuclear Power Plant.
Sincerely, Y
'CALLISTER, P.E. (fv-M., f, Engineering Division 1 Incl Chie As stated ts g
x q> 'N e
~
'4 :r";.5 4 E 9,
\\
V Mt.151982* D
- la y
w ww arna pi n-S g3 GW 31 TEC ll
.y 1
A cf \\
8204160356 820412 PDR ADOCK 05000329 T
r
+
12 APR1982 fiCEED-T
SUBJECT:
Testineny Concerning the Plant Fill Probles, Diesel Generator Eu11 ding, Itidisnd Euclear rower Plant l
Mr. George Lear U.S. Nuclear Regulatory Connission Chief, liydrologie & GeoTechnical Engineering Branch j
Division of Engineering i
lhil Stop P-214 Washington, DC 20555 4
Dear Mr. Lears i
Attached 1s testimony from Mr. P.ari Singh concerning the plant fill problem, diesel generator buildin2 at the ladiand Nuclear Power Plant.
Sincerely, p
1 Inc1 P. McCA,Lf1 STER, P.E.
As stated Chief, Engineering Division