ML20054A289

From kanterella
Jump to navigation Jump to search
Forwards Revised Monthly Operating Repts for Oct 1981
ML20054A289
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/18/1981
From: Lotito E
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20054A290 List:
References
NUDOCS 8204150352
Download: ML20054A289 (1)


Text

iG 1

/

/

=/ 3 s i BALTIMORE M' l-

, GAS AND I

~7, ' '

ELECTRIC

,y O-

' * ~ ~

CHARLES CENTER. P.O. BOX 1475 BALTIMORE, MARYLAND 21203 December 18, 1981 Director Office of Management and Program Control US Nuclear Regulatory Comnission 7735 Old Georgetown Road 3

Bethesda, MD 20015 Gentlemen:

Enclosed herewith are revisions for the Operation Status Report for Calvert 1

Cliffs No.1 Unit, (Docket 50-317) and Calvert Cliffs No. 2 Unit, (Docket 50-318), for the months of October and November,1981. Revisions due to the extra hour on October 25th.

Sincerely, n -

\\' VN MQ o..,

a._

E. M. Latito Perfonnance Data Analyser Production Economy and Results Unit Fossil Power Department EML/jtf

Enclosure:

cc: Directorate of Regulatory Operations Nuclear Safety Analysis Center Region I 3412 Hillview Avenue US Nuclear Regulatory Cmmission P.O. Box 10412 Palo Alto, CA 94303 S. M. Iong Power Plant Siting - MD L. B. Russell W. L. LeConte A. M. Maszaros J. A. Tiernan C. L. Shoemaker R. Architzel A. E. Lundvall, Jr.

P. D. Sierer, Jr.

5 R. F. Ash P. Kruse C. Cintulo S. M. long 5

8204150352 811218 h$

PDR ADOCK 05000317 R

PDR L

-