YANKEE ATOMIC NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 82-2 FOR THE MONTH OF FEBRUARY, 1982 l
l 8204150345 820312 l
PDR ADOCK 05000 i
R
i OPERATING DATA REPORT DOCKET NO.
50-29 DATE 820312 COMPLETED BY A.E.
Doyle TELEPHONE 617-872-8100-X2390 OPERATING ST ATUS Notes Yankee Rowe
- 1. Unit Name:
- 2. Reportin2 Period:
Fohrnney 1999 Power level restricted by 600
- 3. Licensed Thermal Power (MWt):
installation of baffle 185
- 4. Nameplate Rating (Gross MWe):
P ates in turbine.
l 175
- 5. Design Electrical Rating (Net MWe):
180
- 6. Maximum Dependsble Capacity (Gross MWe):
175
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (!tems Number 3 Through 7) Since Last Report.Gise Reasons:
150 MWe
- 9. Power Lese! To Which Restricted.If Any (Net MWe):
See notes
- 10. Ressons For Restrictions.lf Any:
This Month Yr..to-Date Cumu!stive 672.00 I.416.00
- 11. Hours In Reportin2 eriod P
672.00_
1.416.no iAg 147 Is
- 12. Number Of Hours Reactor Was Critics!
0.00 0.00 0.00
- 13. Reactor Resene Shutdown Hours 672.00 1.416.00 143.896.50
- 14. Hours Generator On.Line 0.00_
o.00 0.00
- 15. Unit Resene Shutdown Hours 395.321.00 840.148.00_
77.14s 081 s2
- 16. Cross Thermal Energy Generated (MWH) 107.1A1.9n 717_Aon an 91 ;;7 9n?_in
- 17. Gross Electrical Energy Cenerated (MWH) 94.924.83 202.127.88
??.04s ??1.56
- 18. Net Electrics! Energy Genersted (MWH) inn.no inn nn 77.08
- 19. Unit Service Factor 100.00 100.00 77.08
- 20. Unit Availability Factor 80.72 81.57 69.53 l
- 21. Unit Capacity Factor (Using MDC Net) 80.72 81.s7 69.s3 l
- 22. Unit Capacity Factor (Using DER Net) 0.00 n no s_is
- 23. Unit Forced Outage Rate
- 34. Shutdowns Scheduled Over Nest 6 Months (Type.Date.and Duration of Eschi:
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY INITIA L El.ECTRICITY CONIM ERCIA L OPERATION (C/77)
I
i l
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-29 UNIT Yankee Roue DATE 820312 COMPLETED BY A.E. Doyle TELEPHONE 617-872-8100-X2390 MONTig FEBRUARY. 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe. Net)
I 144.0 37 143,9 2
143.9 18 143.9 3
143.6 39 144.0 4
143.8 20 144.1 5
143.7 21 144.1 6
144.0 22 127.0 7
133.8 23 III 7 g
143.6 24
.126.7 9
144.0 25 143.7 10 144.2 26 144.0 g:
144.I 27 144.3 12 144.2 gg 144.I 144.2 13 29 ja 144.3 30 144.2 15 3,
16 144.1 i
INSTRUCTIONS On this format. list the average daily unit power levelin MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
l (9/771
i l
UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-29 UNIT NAhlE Yankee Rowe l
DATE 870112 l
REPORT hlONTil FEBRUARY. 1982 COntPLETED 11Y
_A.E.
Doyle TELEril0NE _617-872-8100-X2390 4 _4 5 li e
c.
Ne i.
Date E.
f_E 3Nb h'7
$*q Cause & Correceive a>
(
- s j U
sex vent g
g3 g,,;n,,,
ii3 y Report
- in O Q-yO Prevent Recurrence 6
None N/A N/A N/A N/A N/A N/A N/A N/A N/A I
2 3
F: Foried 1(cason:
4 klethod:
S. Silieduled Extiibit G -Insteuctiinis A filuipinent Failure (Explain) 1-htanual it klaintenance niTest for 15epautiini of Data 7 htanual Scrain.
C-Itefueling Entry Sheets In Licensee D.Itegul.itney Restriction 3 Autunutic Serain.
Event Reping (LER) File (NUREG-E.Opeutor Tsaining & License Examination 4 Other (Explain) 01611 IL Ailininissutive G Opeuti..nal I e sier (Explam) 5 t'8/17)
II Othes (Explain)
Emint,ii ! Same Somce
s DOCKET NO.
50-29 UNIT Yankee Rowe DATE 820312 COMPLETED BY A.E. Doyle TELEPHONE 617-872-8100-X2390 REPORT MONTH FEBRUARY. 1982 SU' MARY OF OPERATING EXPERIENCES 2/7 At 0001 hours1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> a load reduction was begun to perform turbine control and throttle valve testing.
At 0445 hours0.00515 days <br />0.124 hours <br />7.357804e-4 weeks <br />1.693225e-4 months <br /> the control and throttle valve testing was complete per Procedure OP-4225.
At 0830 hours0.00961 days <br />0.231 hours <br />0.00137 weeks <br />3.15815e-4 months <br /> the plant was again at full load (155 MWe).
2/22 At 1015 hours0.0117 days <br />0.282 hours <br />0.00168 weeks <br />3.862075e-4 months <br /> a plant load reduction was commenced to allow isolation of No. 1 Heater Drain Pump to investigate excessive vibrations.
At 1250 No. 1 Heater Drain Pump was removed from service.
2/24 At 1245 hours0.0144 days <br />0.346 hours <br />0.00206 weeks <br />4.737225e-4 months <br /> plant load increase was begun, after No. 1 Heater Drain Pump was repaired and returned to service.
At 1515 hours0.0175 days <br />0.421 hours <br />0.0025 weeks <br />5.764575e-4 months <br /> the plant was again operating at full load.