ML20054A073
Jump to navigation
Jump to search
| ML20054A073 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 03/06/1982 |
| From: | Harran G NORTHEAST NUCLEAR ENERGY CO. |
| To: | |
| Shared Package | |
| ML20054A068 | List: |
| References | |
| NUDOCS 8204150263 | |
| Download: ML20054A073 (1) | |
Text
..
O OPERATING DATA REPORT
~
(January Correc'tions)
DOCKET NO.
50-245 DATE 820603 l
COMPLETED BY G. Harran I
TELEPHONE 203/447-1791 Ext. 4194 OPERATING STATUS
- 1. Unit Name:
Millstone Unit 1 Notes
- 2. Reporting Period:
En"n ry (Inrrorti nnd
- 3. Licensed Thermal Power (MWr):
2011
- 4. Nameplate Rating (Gross MWe):
662 S. Design Electrical Rating (Net MWe):
660
- 6. Masimum Dependable Capacity (Gross MWe):
6R4
- 7. Maximum Dependable Capacity (Net MWe):
654
- 8. If Changes Occur in Capacity Ratings (!: ems Number 3 Through 7) Since Last Report.Gise Reasons:
N/A N/A
- 9. Power Lese! To which Restricted.If Any (Net MWe):
Approx. 595 MWE
- 10. Reasons For Restrictions.lf Any:
Main turbine complete 14th stage removal This Month Yr..to Date Cumularise
- 11. Hours In Reporting Period 744 744 f.
97968
- 12. Number Of Hours Reactor Was Critical 744 744 71998.1
- 13. Reactor Resene Shutdown Hours 0
0 2775.8
- 14. Hours Generator On Line 7ad 744 69387.7
- 15. Unit Resene Shutdown Hours n
0 26.5
- 16. Gross Thermal Energy Generated (MWH)
- l472444
- 1472444
- 124507528
- 17. Gross Electrical Energy Generated (MWH) 461500 461500 41923496
- 18. Net Electrical Energy Generated (MWH)
- 438128
- 438128
- 39986951
- 19. Unit Senice Factor 100 100 70.8
- 20. Unit Asailability Factor 100 100 70.9
- 21. Unit Capacity Factor (Using MDC Net) 90.0 90.0 62.4
- 22. Unit Capacity Factor (Using DER Net) 40 ?
A9 ?
61.8
- 23. Unit Forced Outage Rate 0
0 16.0
- 24. Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Eachl:
8204150263 820311 N/A PDR ADOCK 05000245 N/A R
- 25. IIShut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior eo Commercial Operationi:
Forecast Achined INITI A L CRITICA LIT Y INITIAL ELECTRICITY N/A COMMERCI AL OPER ATION
- Corrected valve due to an error in the reported net electrical energy generated January Calculation.
cym