ML20054A073

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for Jan 1982
ML20054A073
Person / Time
Site: Millstone 
Issue date: 03/06/1982
From: Harran G
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML20054A068 List:
References
NUDOCS 8204150263
Download: ML20054A073 (1)


Text

..

O OPERATING DATA REPORT

~

(January Correc'tions)

DOCKET NO.

50-245 DATE 820603 l

COMPLETED BY G. Harran I

TELEPHONE 203/447-1791 Ext. 4194 OPERATING STATUS

1. Unit Name:

Millstone Unit 1 Notes

2. Reporting Period:

En"n ry (Inrrorti nnd

3. Licensed Thermal Power (MWr):

2011

4. Nameplate Rating (Gross MWe):

662 S. Design Electrical Rating (Net MWe):

660

6. Masimum Dependable Capacity (Gross MWe):

6R4

7. Maximum Dependable Capacity (Net MWe):

654

8. If Changes Occur in Capacity Ratings (!: ems Number 3 Through 7) Since Last Report.Gise Reasons:

N/A N/A

9. Power Lese! To which Restricted.If Any (Net MWe):

Approx. 595 MWE

10. Reasons For Restrictions.lf Any:

Main turbine complete 14th stage removal This Month Yr..to Date Cumularise

11. Hours In Reporting Period 744 744 f.

97968

12. Number Of Hours Reactor Was Critical 744 744 71998.1
13. Reactor Resene Shutdown Hours 0

0 2775.8

14. Hours Generator On Line 7ad 744 69387.7
15. Unit Resene Shutdown Hours n

0 26.5

16. Gross Thermal Energy Generated (MWH)
  • l472444
  • 1472444
  • 124507528
17. Gross Electrical Energy Generated (MWH) 461500 461500 41923496
18. Net Electrical Energy Generated (MWH)
  • 438128
  • 438128
  • 39986951
19. Unit Senice Factor 100 100 70.8
20. Unit Asailability Factor 100 100 70.9
21. Unit Capacity Factor (Using MDC Net) 90.0 90.0 62.4
22. Unit Capacity Factor (Using DER Net) 40 ?

A9 ?

61.8

23. Unit Forced Outage Rate 0

0 16.0

24. Shutdowns Scheduled Over Nest 6 Months (Type. Date.and Duration of Eachl:

8204150263 820311 N/A PDR ADOCK 05000245 N/A R

PDR

25. IIShut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior eo Commercial Operationi:

Forecast Achined INITI A L CRITICA LIT Y INITIAL ELECTRICITY N/A COMMERCI AL OPER ATION

  • Corrected valve due to an error in the reported net electrical energy generated January Calculation.

cym