ML20053E809
| ML20053E809 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 06/04/1982 |
| From: | Jackie Cook CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, 17511, 81-05-#5, 81-5-#5, NUDOCS 8206100113 | |
| Download: ML20053E809 (2) | |
Text
-_
e Consumers Power Jernes W Cook Vice President - Projects, Engineering and Construction c n.r.: ovvic : 1945 w t Perness need, J ekoon, us 4s2oi. (si7 7sso453 81-05 #5 June 4, 1982 Mr J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND PROJECT - DOCATT NOS 50-329 AND 50-330 SHEAR REINFORCEMENT AT MAJOR CCI."" AIM >ITC PENETRATIONS FILE:
0.h.9 53 SERIAL:
17511
References:
J W Cook letters to J G Keppler, Same
Subject:
- 1) Serial 11993, dated May 15, 1981
- 2) Serial 12066, dated July 31, 1981
- 3) Serial lh635, dated December 14, 1981 h) Serial 16126, dated March 12, 1982 This letter, as were the referenced letters, is an interim 50 55(e) report concerning the adequacy of shear reinforcements at major containment penetrations.
Results from a reanalysis of the personnel lock using a finite element model are being evaluated at this time. The acceptability of the shear stresses around the purge line penetration and emergency air lock will be determined based on the personnel lock analysis.
Another report, either interin or final, vill be sent on or before August 31, 1982.
Y a
JLW/ir j
/
CC:
Document Control Desk, NRC
/
Washington, DC RJCook, NRC Resident Inspector Midland Nuclear Plant
]0 \\'h
]WY B206100113 e20604
/
PDR ADOCK 0500o329
/
S PDR
2 Serial 17511 CC: CBechhoefer, ASLB Panel RSDecker, ASLB Panel FPCowan, ASLB Panel JHarbour, ASLB Panel AS&L Appeal Panel MMCherry, Esq MSinclair BStamiris CRStephens, USNRC WDPaton, Esq, USNRC FJKelley, Esq, Attorney Gen SHFreeman, Esq, Asst Attorney Gen WHMarshall GJMerritt, Esq, TNK&J