@ Telephone 815/942-2920 Commonwealth Edison
~
Dresdtn Nucitar Powir Station R.R. #1 Morris, Illinois 60450 Date &
6O l
l hfe$
~
DJS LTR:
81-264 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Neclear Regulatory Cocraission Washington, D.C.
20555
Subject:
Emergency Plan Implementing Procedures for Dresden Station Units 1, 2, and 3; NRC Docket Nos. 50-10, 50-237, and 50-249 I
References:
(a) D. J. Scott letter to H. R. Denton, dated March 12, 1981 (b) Title 10, Code of Federal Regulations, Appendix E, Part V
Dear Mr. Denton:
Enclosed are ten (10) copies of revisions to Dresden Station Emergency Plan Implementing Procedures.
No return of transmittals is necessary.
l Sincerely,
(.h D.
Scott Station Superintendent Dresden Nuclear Power Station
'DJS :TGB :mt Enclosures cc:
T. Blackmon File /NRC File / Numerical
%DDI i
I(
82060804 % 820528 PDR ADOCK 05000010 F
PDR_
O DAP 9-2 Revision 12 DRESDEN STATION PROCEDURE ROUTING (TRANSMITTAL RECEIPT)
R er No.
s s D.s. S//o$A C#fd-Sco)
[n 1 M O O - M, t A LLJ b
REMOVE:
l h 9T d d/j - d ; i A f A T. /
i lNSERT:
l l
(Sign and return this form to the Procedures Manager.)
I hereby acknowledge receipt of the above.
Signed Date FORM 9-2A (Cont'd.)
~
gppROVED g 12'82 D.O.S.R-24 of 22 i
. o_
..o.
DAP S2 Revision 12 PROCEDURE HISTORY AND SAFETY EVALUATION Procedure EPl P - 2 64 - 3 Rev. N o.
i Description of Procedure Revision or of New Procedure
[.
hm se fwiermur f* d ILti e <.
~~
Justification for New or Revised Procedure De e t t s h Rc C
- n e m'A klin Aum kssms<./ J?/us r.
Supportive References (Letters. Temporary Change Requests, Procedure Inquiry, NU R EG, etc.)
FORM 9-2B APPROVED MAY 12'82.
25of32 D.O.S.R.
)
1
.'. = -
DAP 9-2 DRESDEN STATI0ft PRCCEDURE ROUTING Revision 11 Nb PROCIDURES COORDINATOR tj0T FIED f/-ffZ Index ruiber Unit A LL Procedure E Pt P 300- 8 Revision No.
Title VoST-ACC.t CEMT' SA+4Pu A of:.VP.m A-e Y Co MTA &;ME/JT" A-TMosPitsee Reg'd. Compl. Date 3 i O R is l Record Retention Requirements:
NO Action Item No.
NA 1.
Is a Surveillance affected?
(Submit DAP 11-2 pgs. 5 or 6)
Modification ho.
NA 2.
Is a Station Record Type being established?
No Draft Review:
a.
If "yes", specify record Deletion?
NO retention requirements.
[
Posted Procecure?
40 rd A (as per Tech. Spec. Sec, Q
Posted Location?
M A-6.5, ANSI N45.2.9 App. A J
Typing Required?
YEr5 or DAP 2-3)
Index Change Requirect we, b.
If "yes", obtain record type number N A- (see R3 Coordinator)
/
1 M
i
__________________________9Eginator Bdtinc 2.
M
/,
MM 8.
M DEpa'rtment Si;p /fgbr QTecn. Staff Supervisor 3.
9.
/7 Z
Verifier
[
Surve ~ 11 nce Cooroinator
/
4.
.Me (O h 5.
13.
10.
e Procecurgs Coordinator Y at ;'n S P iSacj/Cnem. Sup.
tW NOV o6193; 11.
w S.
Op.~ating En i er c r SRO Pr edures Manager s
I
- 12. [
n uh 7.
m
__9tisinatet_tetggtteagr Stat g t. _ _., _ _ _ _ _ _ _ _ __
TRANSMITTAL RECEIPT R
er No.
. #b.
/
~
E f//" 300-f g2,./
APPROVED REMCVE:
MAY 13'82 INSERT:
jf
_7 D.O.S.R.
I hereby acknowledge receipt of the above.
Signed Date (Sign and return this fann to the Procedures Manager.)
j FORM 9-2A 18 of 2+,
i
~ ~ '
.- - ~.
I CAP 9-2 Revision 11 PROCEDURE HISTORY l
E Pie 300- 9 Rev. re.
Procedure
- Description of Procedure Revision or of New Procedure fo(a h A h N cA w
_ dewc, A_ b
- ~ ~
oc m a d % m e w +,w A w %
G. _.. '...
yy V
- e Justification for New or Revised Procedure b (1 % h CLJ(:0 5 WC eA % k i
u
(
o Supportive References
'Y\\ca APPROVED Fonn 9-23 m 1782 D.O.S.R.
1,,, y I
DAP 9-2 P.evision 11 SAFETY EVALUATION (10 CFR 50.53)
Oces thi s peccecure/ revision cens:i:u:e a enange :c '
orccedures as described in Safe:v Ana1V5Is RQ==r ?
Yes ( )
No (
I
._ is a change in :ne Tecnnicai
, Soeci fica tion involved?
No ( )
~
s Answer ne folicwing questicns wi ta a "yes" cr SAFETY EVALUATiCN:
"nc", and pecvide speci fic reascns Jus:i ~ying the decisica:
I's :he pecbability of an occurrenca, :he censequence of an acci-1.
den:, or.:al functic:i cf safety reia:ed equipmen:,- as previously increased 7 evalastad in :he Final Safety Analysis Report, Yes A No, because:
W Q&fl is the passibiiicy foi an _acciden or maifunc:icn of a differen::.
L type :han any previcusly evaluated in the Final Safety Analysis
^
~
O Reper created?
Yes
& No, because:
M basis fer any Tech-Is the margin of safety, as defined in theN No, because:
3 reduced?
Yes nical Speci fication,
}
92, a m A a-I A!! Answers No Any Answer
- Yes ( )
r APPROVED r
.uquest anc rec =ive nuciur.
Regulatory Cer=:ission
~
2 13'82 authori:ation for change.
D.O.S.R.
Authorizacion Received (}
k
?
[ Iniciate Prx ccure
- NOTE:
Any answer chech2d "yes" I
t rasl emenes:icn
[
should be-recor:cd in :he Perfer=ed 3y annust recer: to :he N.1C..
Date h 6._
f0. ! 9-2C.
t 20 of 24 N"
sW M e.Apg
,gg m.._.._.
~.
~
DAP 9-2 Revision 12 DRESDEN STATION PROCEDURE ROUTING (TRANSMITTAL RECEIPT)
"&r No.c.s. s/ia/ss C#5a-aoD REMOVE:
bO T h d (';O d,(A011-f j
INSERT:
f0 9 $O0- 6 tA017 d-_
3 (Sign and return this form-to the Procedures Manager.)
I hereby acknowledge receipt of the above.
Signed Date FORM 9-2A (Cont'd.)-
APPROVED MAY 12.'82 24 of 32 D.O.S.R.
?
I
=
- 8
.n
.. ~......
DAP 9-2 Revision 12 PROCEDURE HISTORY AND SAFETY EVALUATION Procedure EP)b 200-E Rev. No.
2_
Description of Procedure Revision or of New Procedure O
IA feaesa-- T,. C, ev 9 a.s e. w e.c 5'as ai e r
?
I h C.
w e.r C>,8e-F, a Oan><u,a 4a t/u s su n 2 s en r-I s-seg8 l\\. -..
l l
Justification for New or Revised Procedure f! ! )
Tt o 6sur-v k(,
L. o w e.rA f) s e-A e
f
~ Pn AEC R u.
C. ~ s.e hI h
C nace T,
&^ n t.,
l l
I i
i Supportive References (Letters, Temporary Change Requests, Procedure inquiry, NU REG, etc.)
FORM 9-2B APPROVED 25 of 32 NAY 12'02 D.O.S.R.
{
t s