ML20053E143

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 70-1151/82-06 on 820412-16.No Noncompliance Noted
ML20053E143
Person / Time
Site: Westinghouse
Issue date: 05/14/1982
From: Gibson A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Damore M
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
Shared Package
ML20053E144 List:
References
NUDOCS 8206070646
Download: ML20053E143 (2)


Text

.

Yu.LW LY 141982 Westinghouse Electric Corporation -

ATTN:

Mr. M. D' Amor'e, Manager Columbia Plant Nuclear Fuel Division Drawer R Columbia, SC 29250 Gentlemen:

Subject:

Report No. 70-1151/82-06 This refers to the routir.e safety inspection conducted by Mr. W. W. Peery of this office on April 12-16, 1982, of activities authorized by NRC License No. SNM-1107 for the Columbia Fuel Fabrication facility and to the discussion of our findings held with Mr. E. Buonanno of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discus:ed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records. interviews with personnel, and observations by the inspector.

Within the secpe of this inspection, no violations or deviations were disclosed.

We have examined actions you nave taken with regard to previously identified enforcement matters. These are discussed in the enclosed inspection report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will be placed in the NRC's Public Document Room unless you notify this office, by telephone, within ten days of the date of this letter and submit written appli-cation to withhold information contained therein within thirty days of the date of this letter.

Such application must be consistent with the requirements of 10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss them with you.

Sincerely, k

A. F. Gibson, Chief Technical Inspection Branch Division of Engineering and Technical Programs

Enclosure:

Inspection Report No. 70-1151/82-06 bec: See Page 2 h206070646820514DRADOCK07001g C

T Cafi

1 4

9

~

j Westinghouse Electric Corporation 2

gay 14jg82

~

s

' bec.w/o encl:

I License Fee Management Branch i

bec w/ encl:

i Document Management Branch State of South Carolina i

l i

4 i

a 1

1 i

i i

i i

I RII

. RII g\\

RII RII i

f du P f

$"G.,ll' e

Peery:ht KP a, AFGibson f4y/82

%/g/82 6 ///V82 SQ82 i

i

{.-

.. ~...

.. -...