Interim Deficiency Rept Re Lamination in 3x3 1/2-angle Iron. Purchase Order Review Revealed That Only 240 Ft of Matl Reviewed.Matl Now Located & Under Control of Nonconformance Repts.Final Rept Due 820731.Reported Per Part 21
ML20053D980
Person / Time
Site: Zimmer
Issue date: 05/25/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-82 10CFR-050.55E, 10CFR-50.55E, QA-1778, NUDOCS 8206070498
Download: ML20053D980 (2)


Text

4 0

k~'."'"' i p _'

k V..

=1 TIIE CINCINNATI GAS & ELECTRIC COhfl%NY d!'

~

CINCIN N ATI. OHIO 4 5200 E. A. BORG M AN N st NIOR ViC C PME SIDE NT May 25, 1982 QA-1778 U.S. Nuclear Pegulatory Camtission Region III 799 Roosevelt Ibad Glen Ellyn, Illinois 60137 Attention: Mr. J. G. Keppler Pegional hhninistrator RE:

NM. H. ZIMMER NUCLEAR POWER STATION UNIT I 10CFR50.55(e) - ITEM S INiIIMTION IN 3x3x ANGLE IRON - DOCKPr NO. 50-358, CONSTRUCTION PERMIT NO. CPPR-88, W.O. #57300, JOB E-5590, FILE NO. NBC-9, S-2 Gentlanen:

This letter constitutes an interim report concerning the subject condition initially reported under the requirements of 10CFP21. Further review has determined this itan is applicable to the Zinmer site under 10CFR50.55(e).

As stated in our previous report, OA-1703, dated April 15, 1982, an accounting was performed to locate all 3x3x A-36 angle iron, manufactured by Northwestern Steel and Wire Canpany of heat #66221. This investigation was prapted by the discovery of a lamination, approximately 1/8" in depth and 1/32" wide at the Zimner site. Further review of the purchase onler found that only 240' of the material was actually received. At this time, all material has been located and is under the control of several noncon-formance reports.

H. J. Kaiser Co., the principal constructor, has notified all steel suppliers that material manufactured by the aforanentioned vendor will no longer be accepted at the Zinmer site.

A final report will be suhnitted by July 31, 1982, after disposition of the applicable nonconformance reports.

8206070498 820525 PDR ADOCK 05000358 S

pyn 1 882

L t J7 s,k

o g

Mr. J. G. Keppler Begional Administrator May 25,1982, QA-1778 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55 (e).

Very truly yours,

' HIE CINCINNATI GAS & ELECTRIC COMPANY h

--t=-

er e,.

E. A. BORGMANN SENIOR VICE PRESIDENP FKP:ec cc: NBC lbsident Inspector Attn:

W. F. Christianson NBC Office of Inspection and Enforcement Washington, D.C. 20555

.~.