Requests Approval to Operate Reactor at or Below 4% Power in Order to Complete Refueling Outage & Install Reactor Vessel Liquid & Stack Effluent Sampling Sys Per NUREG-0737,Items II.B.3 & II.F.1.2
ML20053D731
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 06/02/1982
From: Linder F
DAIRYLAND POWER COOPERATIVE
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-2.F.1, TASK-TM LAC-8315, NUDOCS 8206070261
Download: ML20053D731 (2)


Text

..

D DAIRYLAND h

h COOPERAT/VE

  • Po BOX 817
  • 2615 EAST AV south + LA CROSSE. WISCONSIN S4601 (608) 788 4 000 June 2, 1982 In reply, please refer to LAC-8315 DOCKET NO. 50-409 Director of Nuclear Power Regulation ATTN:

Mr. Dennis M.

Crutchfield, Chief Operating Reactors Branch #5 Division of Licensing U.

S. Nuclear Regulatory Commission Washington, D. C.

20555

SUBJECT:

DAIRYLAND POWER COOPERATIVE LA CROSSE BOILING WATER REACTOR (LACBWR)

PROVISIONAL OPERATING LICENSE NO. DPR-45 THREE MILE ISLAND LESSONS LEARNED REQUIREMENTS

Reference:

(1)

DPC Letter, Linder to Eisenhut, LAC-7876, dated October 16, 1981.

(2)

DPC Letter, Linder to Eisenhut, LAC-8275, dated May 7, 1982.

Gentlemen:

Our letter (Reference 1) requested an extension of time from January 1, 1982, until completion of the Spring 1982 refueling outage to install the Reactor Vessel Liquid and Stack Effluent sampling Systems which are intended to comply with the sampling and analyses requirements of Items II.B.3 and II.F.1.2 respectively of NUREG 0737 items and provided an estimate of the date the refuel-ing outage would be completed (July 1, 1982).

Due to unforeseen delays in completion of the refueling outage, attributable to inspection and repair of the turbine and generator, we estimate that the refueling outage will not be completed until July 15, 1982.

The reactor, however, han been refueled.

Prior to completion of the outage, it will be necessary to operate the reactor at or below 4% power for the purpose of conducting operator licensing examinations and low power physics testing.

The exams are scheduled during the week beginning June 7, 1982.

The low power physics testing will be conducted within the next week.

OY Approval is requested to operate the reactor at or below 4% power 8

for the purposes specified above in advance of completion of the sampling systems.

The systems are expected to be completed on or i ()

about July 9, 1982.

At the present time the Reactor Vessel Liquid Sampling System is approximately 60% complete mechanically and 25%

complete electrically.

The Stack Effluent Sampling System is 100%

8206070261 820602 PDR ADOCK 05000409 P

PDR

Mr. Dennis M. Crutchfield, Chief LAC-8315 Operating Reactors Branch #5 June 2, 1982 complete mechanically and 50% complete electrically.

Testing, training and operating procedure preparation remain to be completed.

If there are any questions concerning this request, please contact us.

Very truly yours, DAIRYLAND POWER COOPERATIVE kA d l$

Frank Linder, General Manager FL:RES:af cc:

J. G.

Keppler, NRC-DRO III NRC Resident Inspector l

l

}

4 t

-v

-x

,n-.

--g r

-3

,-