ML20053D711
| ML20053D711 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 05/25/1982 |
| From: | Conway R GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, GN-174, NUDOCS 8206070237 | |
| Download: ML20053D711 (1) | |
Text
_
l l
r-
, r:,, o
,#,r 3 m r,,, m. m
, y :a iic v'; d If:' Oh T. ';h
<:s're-6?
w $
'.n.nn
.mTA.Gr'
- p. emy
)
,v
~
AB N
o'l IS'{ U R.E.Conway Q
r(, p.
c.t 4
May 25,1982 l
United States Nuclear Regulatory Commission Office of Inspection and Enforcement Region II - Suite 3100 101 Marietta Street File: X78G03-M25 l
Atlanta, Georgia 30303 Log:
GN-174 Attention: Mr. James P. O'Reilly
Reference:
Vogtle Electric Generating Plant - Units 1 and 2 50-424; 50-425 Embeds-1982 Gentlemen:
On April 26, 1982, Mr. Virgil Brownlee of the NRC was notified by Mr. E. D. Groover, QA Site Supervisor for Georgia Power Company at the Vogtle Project, of a potential deficiency concerning embeds.
At this time, Georgia Power Company is gathering the data required to do an engineering evaluation to determine if there has been or could be any effect on the safety of operations of the plant. The NRC will be sent an interim report on or before July 23, 1982 describing what has occurred and a date for the final report submittal.
This letter contains no proprietary infonnation and may be placed in the NRC Public Document Room upon receipt.
Yours truly, R. E. Conway REC /CWH/tlp xc:
U. S. Nuclear Regulatory Commission Attn: Victor J. Stello, Jr., Director Office of Inspection and Enforcement Washington, D. C.
20555 R. J. Kelly
- 0. Batum R. E. Conway D. O. Foster G. F. Head H. H. Gregory, III J. T. Beckham, Jr.
E. D. Groover J. H. Boykin L. T. Gucwa D. E. Dutton M. Malcom R. H. Pinson C. R. Miles, Jr.
D. L. McCrary M. Manry R. A. Thomas R. W. Staffa J. A. Bailey J. L. Vota OFFICIAL COPY W. F. Sanders 8206070237 820525 DR ADDCK 05000 L y}