ML20053D607

From kanterella
Jump to navigation Jump to search
Forwards LERs 82-020/03L-0,82-021/03L-0 & 82-022/03L-0
ML20053D607
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 05/27/1982
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20053D608 List:
References
NUDOCS 8206070119
Download: ML20053D607 (1)


Text

,

Malling Address Alabcma Power Company (200 North 18th Street Post Office Box 2fA1

/,,.

Birmingham Alabama 35291 i. '/,*,.

?

Talephone 205 783-6081

[ 4,A,. /,,

F. L. Clayton, Jr, O '/ 7. Y ' '

b E

~r

[> /g 7 A'l"abama Power Senior Vice President runtnoge eue,ng Ag: 26, u sournern o.nre som May 27, 1982 Docket No. 348 Docket No. 364 U.

S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region II 101 Marietta Street, N.W.

Suite 3100 Atlanta, Georgia 30303

Dear Sir:

Joseph M.

Farley Nuclear Plant, Unit 1, Licensee Event Reports Nos. LER 82-020/03L-0 and LER 82-022/03L-0 and Unit 2 Licensee Event Report No. LER 82-021/03L-0 are forwarded with three (3) copies of each in accordance with FNP Tech-nical Specification 6.9 to provide thirty (30) days written notification of the occurences.

If you have any questions, please advise.

(

Yours very

}.

y

F.

L.

Clayton, Jr.

FLCJ r/KWM:nac Enclosures xc: Director, IE (30 copies)

Director, MIPC (3 copies)

FFICh\\3.( OI'Y F206070119 820527 PDR ADOCK 05000348 f al-