Hydrological Considerations Inservice Insp of Water Control Structures Comm Ed Dresden Nuclear Power Station Unit 2.ML20053C949 |
Person / Time |
---|
Site: |
Dresden |
---|
Issue date: |
05/27/1982 |
---|
From: |
Steven Roberts FRANKLIN INSTITUTE |
---|
To: |
Staley G NRC |
---|
Shared Package |
---|
ML17194B162 |
List: |
---|
References |
---|
CON-NRC-03-79-118, CON-NRC-3-79-118, TASK-03-03.C, TASK-3-3.C, TASK-RR TER-C5257-539, NUDOCS 8206030205 |
Download: ML20053C949 (16) |
|
|
---|
Category:CONTRACTED REPORT - RTA
MONTHYEARML20097J7621995-07-0505 July 1995 Technical Evaluation Rept on IPE Front End Analysis ML20097J7661995-06-30030 June 1995 Final Rept, Technical Evaluation Rept on IPE Submittal Human Reliability Analysis, Rev 1 ML20097J7631995-06-27027 June 1995 Technical Evaluation Rept on IPE Back-End Analysis ML20128A1131992-10-31031 October 1992 TER Pump & Valve Inservice Testing Program,Dresden Nuclear Power Station,Units 2 & 3 ML20058K5311990-06-30030 June 1990 Technical Evaluation Rept Re Pump & Valve Inservice Testing Program Dresden Nuclear Power Station,Units 2 & 3 ML19332B6151989-10-31031 October 1989 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: Dresden-2/-3, Technical Evaluation Rept ML17252A5951989-08-31031 August 1989 Final Technical Evaluation Rept on Response from Comm Ed to Generic Ltr 88-01 Pertaining to Dresden Nuclear Power Station,Unit 3. ML20058K0721989-06-30030 June 1989 Final Technical Evaluation Rept on Response from Comm Ed to Generic Ltr 88-01 Pertaining to Dresden Nuclear Power Station,Unit 2 ML20237J2511987-08-31031 August 1987 Conformance to Reg Guide 1.97:Dresden-2 & -3, Technical Evaluation Rept ML20214R7081987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Dresden-2 & -3, Final Informal Rept ML20206R6191986-09-0303 September 1986 Technical Evaluation of Comm Ed Dcrdr of Dresden Station, Units 2 & 3 ML20207F4641986-07-17017 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Dresden Station Units 2 & 3, Supplementary Technical Evaluation Rept ML20244D9281986-06-0303 June 1986 Review of Licensee Responses to SEP Topic III-7.B, 'Design Codes,Design Criteria & Loading Combinations,Dresden Unit 2,' Final Supplementary Rept ML20214G4081986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Selected GE BWR Plants (Cooper,Dresden 2 & 3,Fermi 2 & Fitzpatrick) ML20137N0241985-08-30030 August 1985 Dcrdr Summary Rept Evaluation for Dresden Station,Units 2 & 3 ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20134P9851985-06-30030 June 1985 Conformance to Generic Ltr 83-28 Items 3.1.3 & 3.2.3 for Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad-Cities Units 1 & 2 ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20205B0271985-06-21021 June 1985 Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors, Technical Evaluation Rept ML20204G8171984-09-30030 September 1984 Technical Evaluation of Dresden Nuclear Power Station Units 2 & 3,Plant-Unique Analysis Rept ML20086F7451983-02-25025 February 1983 Inservice Insp Program,Dresden Nuclear Power Plant,Units 1 & 2, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20028B4991982-10-31031 October 1982 Analysis of Spectrum of Large-Break LOCAs in BWR/3 Using TRAC-BD1, Vols 1 & 2,interim Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML17194B4171982-07-21021 July 1982 Nonproprietary Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11,B-60),for Dresden Unit 3, Technical Evaluation Rept ML17194B4141982-06-22022 June 1982 Nonproprietary Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11,B-60),for Dresden Unit 2, Vols 1 & 2 Technical Evaluation Rept ML20054K1221982-06-21021 June 1982 Wind & Tornado Loadings (SEP Topic III-2), Draft Technical Evaluation Rept ML20053C9491982-05-27027 May 1982 Hydrological Considerations Inservice Insp of Water Control Structures Comm Ed Dresden Nuclear Power Station Unit 2. ML20052H2281982-05-17017 May 1982 Design Codes,Design Criteria & Loading Combinations,Sep Topic III-7.B, Technical Evaluation Rept ML20052C5691982-03-31031 March 1982 Degraded Grid Protection for Class IE Power Sys,Dresden Station,Units 1 & 2, Preliminary Informal Rept ML20041D6351982-03-0303 March 1982 Quality Group Classification of Components & Sys,Comm Ed Co Dresden Nuclear Power Station Unit 2, Technical Evaluation Rept ML20010E8331981-08-31031 August 1981 Adequacy of Station Electric Distribution Sys Voltages, Dresden Station,Units 2 & 3. ML20049H9681981-05-31031 May 1981 Licensee Response to IE Bulletin 80-06 Re ESF Reset Controls, Interim Technical Rept ML19341B0911980-12-31031 December 1980 Adequacy of Station Electric Distribution Sys Voltages, Dresden Station,Units 2 & 3. 1995-07-05
[Table view] Category:QUICK LOOK
MONTHYEARML20097J7621995-07-0505 July 1995 Technical Evaluation Rept on IPE Front End Analysis ML20097J7661995-06-30030 June 1995 Final Rept, Technical Evaluation Rept on IPE Submittal Human Reliability Analysis, Rev 1 ML20097J7631995-06-27027 June 1995 Technical Evaluation Rept on IPE Back-End Analysis ML20128A1131992-10-31031 October 1992 TER Pump & Valve Inservice Testing Program,Dresden Nuclear Power Station,Units 2 & 3 ML20058K5311990-06-30030 June 1990 Technical Evaluation Rept Re Pump & Valve Inservice Testing Program Dresden Nuclear Power Station,Units 2 & 3 ML19332B6151989-10-31031 October 1989 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: Dresden-2/-3, Technical Evaluation Rept ML17252A5951989-08-31031 August 1989 Final Technical Evaluation Rept on Response from Comm Ed to Generic Ltr 88-01 Pertaining to Dresden Nuclear Power Station,Unit 3. ML20058K0721989-06-30030 June 1989 Final Technical Evaluation Rept on Response from Comm Ed to Generic Ltr 88-01 Pertaining to Dresden Nuclear Power Station,Unit 2 ML20237J2511987-08-31031 August 1987 Conformance to Reg Guide 1.97:Dresden-2 & -3, Technical Evaluation Rept ML20214R7081987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Dresden-2 & -3, Final Informal Rept ML20206R6191986-09-0303 September 1986 Technical Evaluation of Comm Ed Dcrdr of Dresden Station, Units 2 & 3 ML20207F4641986-07-17017 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Dresden Station Units 2 & 3, Supplementary Technical Evaluation Rept ML20244D9281986-06-0303 June 1986 Review of Licensee Responses to SEP Topic III-7.B, 'Design Codes,Design Criteria & Loading Combinations,Dresden Unit 2,' Final Supplementary Rept ML20214G4081986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Selected GE BWR Plants (Cooper,Dresden 2 & 3,Fermi 2 & Fitzpatrick) ML20137N0241985-08-30030 August 1985 Dcrdr Summary Rept Evaluation for Dresden Station,Units 2 & 3 ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20134P9851985-06-30030 June 1985 Conformance to Generic Ltr 83-28 Items 3.1.3 & 3.2.3 for Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad-Cities Units 1 & 2 ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20205B0271985-06-21021 June 1985 Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors, Technical Evaluation Rept ML20204G8171984-09-30030 September 1984 Technical Evaluation of Dresden Nuclear Power Station Units 2 & 3,Plant-Unique Analysis Rept ML20086F7451983-02-25025 February 1983 Inservice Insp Program,Dresden Nuclear Power Plant,Units 1 & 2, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20028B4991982-10-31031 October 1982 Analysis of Spectrum of Large-Break LOCAs in BWR/3 Using TRAC-BD1, Vols 1 & 2,interim Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML17194B4171982-07-21021 July 1982 Nonproprietary Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11,B-60),for Dresden Unit 3, Technical Evaluation Rept ML17194B4141982-06-22022 June 1982 Nonproprietary Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11,B-60),for Dresden Unit 2, Vols 1 & 2 Technical Evaluation Rept ML20054K1221982-06-21021 June 1982 Wind & Tornado Loadings (SEP Topic III-2), Draft Technical Evaluation Rept ML20053C9491982-05-27027 May 1982 Hydrological Considerations Inservice Insp of Water Control Structures Comm Ed Dresden Nuclear Power Station Unit 2. ML20052H2281982-05-17017 May 1982 Design Codes,Design Criteria & Loading Combinations,Sep Topic III-7.B, Technical Evaluation Rept ML20052C5691982-03-31031 March 1982 Degraded Grid Protection for Class IE Power Sys,Dresden Station,Units 1 & 2, Preliminary Informal Rept ML20041D6351982-03-0303 March 1982 Quality Group Classification of Components & Sys,Comm Ed Co Dresden Nuclear Power Station Unit 2, Technical Evaluation Rept ML20010E8331981-08-31031 August 1981 Adequacy of Station Electric Distribution Sys Voltages, Dresden Station,Units 2 & 3. ML20049H9681981-05-31031 May 1981 Licensee Response to IE Bulletin 80-06 Re ESF Reset Controls, Interim Technical Rept ML19341B0911980-12-31031 December 1980 Adequacy of Station Electric Distribution Sys Voltages, Dresden Station,Units 2 & 3. 1995-07-05
[Table view] Category:ETC. (PERIODIC
MONTHYEARML20097J7621995-07-0505 July 1995 Technical Evaluation Rept on IPE Front End Analysis ML20097J7661995-06-30030 June 1995 Final Rept, Technical Evaluation Rept on IPE Submittal Human Reliability Analysis, Rev 1 ML20097J7631995-06-27027 June 1995 Technical Evaluation Rept on IPE Back-End Analysis ML20128A1131992-10-31031 October 1992 TER Pump & Valve Inservice Testing Program,Dresden Nuclear Power Station,Units 2 & 3 ML20058K5311990-06-30030 June 1990 Technical Evaluation Rept Re Pump & Valve Inservice Testing Program Dresden Nuclear Power Station,Units 2 & 3 ML19332B6151989-10-31031 October 1989 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: Dresden-2/-3, Technical Evaluation Rept ML17252A5951989-08-31031 August 1989 Final Technical Evaluation Rept on Response from Comm Ed to Generic Ltr 88-01 Pertaining to Dresden Nuclear Power Station,Unit 3. ML20058K0721989-06-30030 June 1989 Final Technical Evaluation Rept on Response from Comm Ed to Generic Ltr 88-01 Pertaining to Dresden Nuclear Power Station,Unit 2 ML20237J2511987-08-31031 August 1987 Conformance to Reg Guide 1.97:Dresden-2 & -3, Technical Evaluation Rept ML20214R7081987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Dresden-2 & -3, Final Informal Rept ML20206R6191986-09-0303 September 1986 Technical Evaluation of Comm Ed Dcrdr of Dresden Station, Units 2 & 3 ML20207F4641986-07-17017 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Dresden Station Units 2 & 3, Supplementary Technical Evaluation Rept ML20244D9281986-06-0303 June 1986 Review of Licensee Responses to SEP Topic III-7.B, 'Design Codes,Design Criteria & Loading Combinations,Dresden Unit 2,' Final Supplementary Rept ML20214G4081986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Selected GE BWR Plants (Cooper,Dresden 2 & 3,Fermi 2 & Fitzpatrick) ML20137N0241985-08-30030 August 1985 Dcrdr Summary Rept Evaluation for Dresden Station,Units 2 & 3 ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20134P9851985-06-30030 June 1985 Conformance to Generic Ltr 83-28 Items 3.1.3 & 3.2.3 for Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad-Cities Units 1 & 2 ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20205B0271985-06-21021 June 1985 Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors, Technical Evaluation Rept ML20204G8171984-09-30030 September 1984 Technical Evaluation of Dresden Nuclear Power Station Units 2 & 3,Plant-Unique Analysis Rept ML20086F7451983-02-25025 February 1983 Inservice Insp Program,Dresden Nuclear Power Plant,Units 1 & 2, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20028B4991982-10-31031 October 1982 Analysis of Spectrum of Large-Break LOCAs in BWR/3 Using TRAC-BD1, Vols 1 & 2,interim Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML17194B4171982-07-21021 July 1982 Nonproprietary Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11,B-60),for Dresden Unit 3, Technical Evaluation Rept ML17194B4141982-06-22022 June 1982 Nonproprietary Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11,B-60),for Dresden Unit 2, Vols 1 & 2 Technical Evaluation Rept ML20054K1221982-06-21021 June 1982 Wind & Tornado Loadings (SEP Topic III-2), Draft Technical Evaluation Rept ML20053C9491982-05-27027 May 1982 Hydrological Considerations Inservice Insp of Water Control Structures Comm Ed Dresden Nuclear Power Station Unit 2. ML20052H2281982-05-17017 May 1982 Design Codes,Design Criteria & Loading Combinations,Sep Topic III-7.B, Technical Evaluation Rept ML20052C5691982-03-31031 March 1982 Degraded Grid Protection for Class IE Power Sys,Dresden Station,Units 1 & 2, Preliminary Informal Rept ML20041D6351982-03-0303 March 1982 Quality Group Classification of Components & Sys,Comm Ed Co Dresden Nuclear Power Station Unit 2, Technical Evaluation Rept ML20010E8331981-08-31031 August 1981 Adequacy of Station Electric Distribution Sys Voltages, Dresden Station,Units 2 & 3. ML20049H9681981-05-31031 May 1981 Licensee Response to IE Bulletin 80-06 Re ESF Reset Controls, Interim Technical Rept ML19341B0911980-12-31031 December 1980 Adequacy of Station Electric Distribution Sys Voltages, Dresden Station,Units 2 & 3. 1995-07-05
[Table view] Category:TEXT-PROCUREMENT & CONTRACTS
MONTHYEARML20097J7621995-07-0505 July 1995 Technical Evaluation Rept on IPE Front End Analysis ML20097J7661995-06-30030 June 1995 Final Rept, Technical Evaluation Rept on IPE Submittal Human Reliability Analysis, Rev 1 ML20097J7631995-06-27027 June 1995 Technical Evaluation Rept on IPE Back-End Analysis ML20128A1131992-10-31031 October 1992 TER Pump & Valve Inservice Testing Program,Dresden Nuclear Power Station,Units 2 & 3 ML20217C8261991-07-0909 July 1991 Notification of Contract Execution,Task Order 3, Electrical Distribution Sys Functional Insp - Dresden, to Nuclear Power Reactor Design Insp Svcs, Awarded to Aecl Technologies ML20058K5311990-06-30030 June 1990 Technical Evaluation Rept Re Pump & Valve Inservice Testing Program Dresden Nuclear Power Station,Units 2 & 3 ML19332B6151989-10-31031 October 1989 Conformance to Generic Ltr 83-28,Item 2.2.1--Equipment Classification for All Other Safety-Related Components: Dresden-2/-3, Technical Evaluation Rept ML17252A5951989-08-31031 August 1989 Final Technical Evaluation Rept on Response from Comm Ed to Generic Ltr 88-01 Pertaining to Dresden Nuclear Power Station,Unit 3. ML20058K0721989-06-30030 June 1989 Final Technical Evaluation Rept on Response from Comm Ed to Generic Ltr 88-01 Pertaining to Dresden Nuclear Power Station,Unit 2 ML20236T7371987-11-24024 November 1987 Notification of Contract Execution,Mod 7,to Dresden & Perry Simulator. Contractor:Ge ML20236T7461987-11-24024 November 1987 Mod 7,extending Period of Performance Through 880930,adding Addl GE Simulator to Contract & Scheduling Four Simulator Courses Through FY88,to Dresden & Perry Simulator ML20237J2511987-08-31031 August 1987 Conformance to Reg Guide 1.97:Dresden-2 & -3, Technical Evaluation Rept ML20206G0811987-04-0808 April 1987 Notification of Contract Execution,Mod 6,to Dresden & Perry Simulator. Contractor:Ge ML20206G2681987-04-0808 April 1987 Mod 6,changing Project Officer Address Due to NRC Reorganization,To Dresden & Perry Simulator ML20214R7081987-03-31031 March 1987 Conformance to Generic Ltr 83-28,Item 2.2.2 - Vendor Interface Programs for All Other Safety-Related Components: Dresden-2 & -3, Final Informal Rept ML20197B4761986-10-0101 October 1986 Notification of Contract Execution,Mod 5,to Dresden & Perry Simulator. Contractor:Ge ML20197B5251986-10-0101 October 1986 Mod 5,extending Period of Performance from 831205 Through 870930,to Dresden & Perry Simulator ML20206R6191986-09-0303 September 1986 Technical Evaluation of Comm Ed Dcrdr of Dresden Station, Units 2 & 3 ML20207F4641986-07-17017 July 1986 Structural Evaluation of Vacuum Breakers (Mark I Containment Program),Dresden Station Units 2 & 3, Supplementary Technical Evaluation Rept ML20244D9281986-06-0303 June 1986 Review of Licensee Responses to SEP Topic III-7.B, 'Design Codes,Design Criteria & Loading Combinations,Dresden Unit 2,' Final Supplementary Rept ML20202J3471986-04-0808 April 1986 Mod 4,establishing Leasing Schedule & Funding for 1986,to Dresden & Perry Simulator ML20202J3191986-04-0808 April 1986 Notification of Contract Execution,Mod 4,to Dresden & Perry Simulator. Contractor:Ge ML20214G4081986-03-31031 March 1986 Conformance to Generic Ltr 83-28,Item 2.1 (Part 1), Equipment Classification (Reactor Trip Sys Components), Selected GE BWR Plants (Cooper,Dresden 2 & 3,Fermi 2 & Fitzpatrick) ML20137N0241985-08-30030 August 1985 Dcrdr Summary Rept Evaluation for Dresden Station,Units 2 & 3 ML20244D3871985-07-10010 July 1985 Review of Licensee & Applicant Responses to NRC Generic Ltr 83-28 (Required Actions Based on Generic Implications of Salem ATWS Events),Item 1.2, `Post-Trip Review:Data & Info Capabilities' for Bellefonte Nuclear Plant. ML20134P9851985-06-30030 June 1985 Conformance to Generic Ltr 83-28 Items 3.1.3 & 3.2.3 for Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad-Cities Units 1 & 2 ML20244D4381985-06-30030 June 1985 Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Dresden Units 2 & 3,Millstone Unit 1,Monticello,Pilgrim & Quad Cities Units 1 & 2. Contains Info for Dresden & Quad Cities ML20205B0271985-06-21021 June 1985 Audit for Mark I Containment Long-Term Program - Structural Analysis for Operating Reactors, Technical Evaluation Rept ML20129D0111985-05-23023 May 1985 Notification of Contract Execution,Mod 3,to Dresden & Perry Simulator Leasing. Contractor:Ge ML20129D0331985-05-23023 May 1985 Mod 3,changing Project Officer,To Dresden & Perry Simulator Leasing ML20204G8171984-09-30030 September 1984 Technical Evaluation of Dresden Nuclear Power Station Units 2 & 3,Plant-Unique Analysis Rept ML20086F7451983-02-25025 February 1983 Inservice Insp Program,Dresden Nuclear Power Plant,Units 1 & 2, Technical Evaluation Rept ML20126E9941982-12-0707 December 1982 Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 ML20028B4991982-10-31031 October 1982 Analysis of Spectrum of Large-Break LOCAs in BWR/3 Using TRAC-BD1, Vols 1 & 2,interim Rept ML20127A2891982-10-0505 October 1982 Containment Leak Rate Testing Investigations, Progress Summary for Sept 1982 ML20126F2541982-08-26026 August 1982 Containment Leak Rate Testing, Monthly Progress Rept for Aug 1982 ML17194B4171982-07-21021 July 1982 Nonproprietary Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11,B-60),for Dresden Unit 3, Technical Evaluation Rept ML17194B4141982-06-22022 June 1982 Nonproprietary Review of Licensees Resolution of Outstanding Issues from NRC Equipment Environ Qualification SERs (F-11,B-60),for Dresden Unit 2, Vols 1 & 2 Technical Evaluation Rept ML20054K1221982-06-21021 June 1982 Wind & Tornado Loadings (SEP Topic III-2), Draft Technical Evaluation Rept ML20053C9491982-05-27027 May 1982 Hydrological Considerations Inservice Insp of Water Control Structures Comm Ed Dresden Nuclear Power Station Unit 2. ML20052H2281982-05-17017 May 1982 Design Codes,Design Criteria & Loading Combinations,Sep Topic III-7.B, Technical Evaluation Rept ML20052C5691982-03-31031 March 1982 Degraded Grid Protection for Class IE Power Sys,Dresden Station,Units 1 & 2, Preliminary Informal Rept ML20041D6351982-03-0303 March 1982 Quality Group Classification of Components & Sys,Comm Ed Co Dresden Nuclear Power Station Unit 2, Technical Evaluation Rept ML20010E8331981-08-31031 August 1981 Adequacy of Station Electric Distribution Sys Voltages, Dresden Station,Units 2 & 3. ML20049H9681981-05-31031 May 1981 Licensee Response to IE Bulletin 80-06 Re ESF Reset Controls, Interim Technical Rept ML19341B0911980-12-31031 December 1980 Adequacy of Station Electric Distribution Sys Voltages, Dresden Station,Units 2 & 3. 1995-07-05
[Table view] |
Text
{{#Wiki_filter:. . _ _ _ _
___ 3f.Q g g x.. . .v - . . .: ;NL-t~~~^'a ENCLOSURE 2 m , A.
. ..e :. ,;.;~ a..g.m
., n .y:m mq;g. e .r, g-g q
-'*"(*dh'-
;- - . j ' N ' h ~kkkf9 f, $th l:7.T'
~
TECH,:NICAL1!VAttiATION'
. _ : . .. .::w.;;mx -
he- '
- n;' %.[S h[jh h h k' 3~ HYDROLOGICADDONSID s .w A&M_..eanm C
~
.... C)
.}3 w.
/,
INSERVICE INSPECTION OF WATER CONTROL' STRUCTURES"
. , .. .. ... a - w 2 y.
0i_ COPHONWEALTH EDISON ppt%' -v_-c z ... .'.,1 ;i, w m.,g SdWWeV
- 4 --
'c -
DRESDEN NIJCLEAR POWER STATION UNIT 2 _ . --
-r%e '
n
- -m7~mQ5 '
. ~ '-
" ^
NRC DOCKET NO. 50-237 MIC PRtWE:7CBBF .. JN7/MP4 b . ?. : 16 ". .jf}Mr
,FRC ASSIGNMBfT ch. Q
.$i. .
~ ~-
NRC TAC NO. 41554 (s
126.. NRC CONTRACT NO. NRC-03-79-ft'8 .-
. . _ - MCTASK'_.339 . . .
%$$h158.Fyd- _ %.
-a, n +-. . . .~ m ,c.y m e nc: x
= :- ~ ~. = .e m g.-
.% _m.
r
)
\ _ ;.- r.
. , t.rsw <-s t.etsagqqqsp Y ~
';.*$$.'hkh
~ '
Preparedby ~:~'*lt ? :~
S* Roberts --
2, . - -
Franklin Reeserch Center Author: T+u
- J. Scherrer 20th and Race Street ,
Philadelphia, PA 19103 FRC Group Laoder: J; S. Scherrer i
r Prepared for
~T l Nuclear Regulatory Commission '
Washington, D.C. 20555 Land NRC Engineer: G. Staley l .
l May 27, 1982 _ ' T -l f _
This report was prepared as an account of work sponsored by an agency of the United States Govemment. Neither the United States Govemment nor any agency thereof, or any of their employees, makes any warranty, ex-pressed or implied, or assumes any legal liability or responsibility for any third party's use, or the results of such use, of any informaton, apparatus, product or process disclosed in this report or represents that its use py such third party would not infringe privately owned rights.
AN
.0. Franklin Research Center A Division of The Franklin Institute
}')J16 l ' -
The Bensamm Frarden Partrusy, Phis Pa. 19103(215) 444-1000 f%[ hob E
TER-C5257-539 CONTENTS lifdf. Pggg Section
. . . . . . . 1 1 I"M - :: ION . . . . . .
1 1.1 Purpose of Review . . . . . . . . . . .
1.2 Generic Background. . . . . . . . . . . 1 1
1.3 Plant-Specific Background . . . . . . . . .
. . . . . 3 2 REVIEW CRITERIA. . . . . . . .
. . . . . . . 4 3 TECHNICAL EVALUATION . . . .
4 3.1 Safety-Related Water Control Structures . . . .
4 3.1.1 Licenpee Identification . . . . . . .
. . . . . 4 3.1.2 Evaluation . . . . . .
6 3.1.1 Conclusion . . . . . . . . . . .
. . . 6 3.2 Details To Be Inspected . . . . . .
f
- 6 i 3.2.1 Licensee Identification . . . . . . .
. . . . . 8 3.2.2 Conclusion . . . . . .
. . . . 8 3.3 Inspection Program. . . . . . .
1
. . . . 9 3.3.1 Inspection Report . . . . .
c 9
3.3.2 Frequency of Inspection. . . . . . . .
9 3.3.3 Conclusion . . . . . . . . . . .
I
. . . . . . . 11 4 CONCLUSIONS. . . . . . .
. . . . . . . 12
- 5 REFERENCES . . . . . . .
l
- L 4 iii MJ Franklin Research Center Awwwr- w.
( . _ .
l.
L TER-CS257-539 i
l FOhDiORD This Technical Evaluation Report was prepared by Franklin Research Center under a contract with the U.S. Nuclear Regulatory Commission (Office of Nuclear Beactor Regulation, Division of Operating Reactors) for technical assistance in support of NRC operating reactor licensing actions. The technical evaluation was conducted in accordance with criteria established by the NRC.
; Ms. S. Roberts and Mr. J. Scherrer contributed to the technical preparation
. of this report through a subcontract with WESTEC Services, Inc.
i l
t 4
I
)
r 9
i i
v O
dddd Franklin Research Center a w w m rr w .
. ' W: .
__r_ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ . _ _ _
i TER-CS257-539 l
- 1. INTRODUCTION l
l I
1.1 PURPOSE OF REVIEW The purpose of this review is to evaluate the assumptions, conclusions, and completeness of documentation in responses by the Commonwealth Edison Company for Systematic Evaluation Program (SEP) Ibpic III-3.C (Inservice Inspection of Water Control Structures) for the Dresden Nuclear Power Station Unit 2. It includes independent analyses by Franklin Research Center (FRC) needed to clarify or resolve issues. The Nuclear Regulatory Commission (NRC) l 1s reviewing this and other safety topics within the SEP and intends to coordinate an integrated assessment of plant safety af ter completion of the
! review of all applicable safety topics and design basis events (DBEs) .
~
1.2 GENERIC BACKGROUND Tne SEP was established to evaluate the safety of 11 of the older nuclear power plants. An important element of the evaluation is to judge the plants l
by current licensing criteria with respect to 137 selected topics, several of fi which relate to hydrologic assessments of the site.
l In a letter dated January 14, 1981 (1), the NRC agreed to the SEP Owners
'! Group's proposed redirection of the SEP whereby each licensee would select any 60% of the SEP topics and submit evaluations of these in time for a review by l
the NRC staff to be completed by June 1981. Evaluations of topics not selected by a licensee were the NRC's responsibility. Commonwealth Edison chose to submit an evaluation for Topic III-3.C in accordance with the SEP guidelines.
1.3 PLANT-SPECIFIC BACKGROUND In a letter to the NRC dated February 16, 1982 (2], the Licensee l
l sucmitted an evaluation of Ibpic III-3.C, comparing the water control i
structure inspection program for the Dresden Nuclear Power Station Unit 2 with MU Franklin Research Center a en an or n. Frwma a
. t
l i
s TER-C5257-539 criteria currently used by the NRC staff for , licensing new facilities. In this report, the submitted documentation is reviewed and the adequacy of the Licensee's evaluation is assessed.
)
l 4
l
}
i t
1 i.
Ii l
l l
g MJ Franklin Research Center w atmvm me
.L
_ . . - . - ~
MP
~
~i e
TER-C5257-539
- 2. REVIDi CRITERIA The reference criteria used for this topic were based on the Code of Federal Regulations, Title 10, Part 50 (10CFR50), Section 50.36 and Appendix A (General Design Criteria 1, 2, and 44) , and 10CFR100, including Appendix A.
Pertinent regulatory positions are identified in the following Regulatory Guides:
1.127 Inspection of Water-Control Structures Associated with Nuclear Power Plants (3) 1.27 Ultimate Heat Sink for Nuclear Power Plants (4]
1.28 Quality Assurance Program Requirements (Design and Construction) (5) 1.132 Site Investigations for Foundations of Nuclear Power Plants (6]
1.59 Design Basis Floods for Nuclear Power Plants (7] .
The specific criteria against wnich the Licensee's submittal was evaluated are given in Regulatory Guide 1.127.
t; i
l
, i dddd Franklin Research Center
; A w a# n. r==a m n,,
I TER-C5257-539
- 3. TECHNICAL EVALUATION 3.1 SAFETY-RELATED WATER CONTROL STRUCTURES 3.1.1 Licensee Identification The following water control structures and components associated with the Dresden Unit 2 site were identified by the Licensee (2] as requiring surveil-lance in accordance with applicable NRC rules and Regulatory Guide 1.127:
A. Cooling Water System Structures The identified cooling water system structures are those relating to the availability and protection of the ultimate heat sink (UHS) and are shown in Figure 1. These include:
- 1. Intake canal, discharge canal, and return intake canal
- 2. Forebay, crib house, and discharge outfall structure t
- 3. Deicing line and gate valve on deicing line
- 4. Flow regulation station.
B. Flood Protection Structures
- 1. Doors at grade level
- 2. Water level gage.
3.1.2 Evaluation The following evaluation of the Licensee-identified water control structures and components is provided.
A. Cooling Water System Structures l The Licensee has adequately described those water control structures which are necessary for maintaining control of the UHS.
B. Flood Protection Structures The Licensee pre'sents two items under flood control structures which are not necessarily flood water control structures. The doors at plant grade are not flood-proofed and will not act to preclude flood waters from entering the buildings and thus should not be considered flood water control structures.
; ~~
-eC31s i U$d Franklin Research Center 4 om.aa at the r- %.
. c
.g - - - - ..
i TER-C5257-539 9
- g. -
--- , x
._ i i i T-- ~i' m.,
D N.
,,( L J NN; DISCHARGE
/ COCUNG WATER r
STRUCTURE CHANNELS i I
_, IT I
' ' 's 7 *
^""'
'*i"NAL c
FLOW B
/000 I- HOUSE STA ON
\
f N h COOLING su _ .
g "e
_ WATER
, g CHANNELS /
- l N /
} N N --
-{ l
) { l QN M f DISCHARGE CANAL a gN
[ UNIT 1
- _, ,%. f a. 7 1 '--
Ok Z
"* APPROXIM ATE ' .
INTAKE CANAL O GRADE BREAK f
// UNIT 2 & 3 INTAKE !
^"^
UNW ![/
/
SO LE APPROX.1* = 400'
![
II/
l// i/
Figure 1. Water Control Structure Location ddu ,F in s,earchgter
-* e a
'1 TER-CS257-539 The water level gage is not used to control floods, but to monitor them. The issue of whether the canal water level gage should be inspected is not disputed; however, its placement under the category of flood water control structures is unnecessary.
The roof drainage system was identified in SEP Topic II-3.B (Flooding 3
Potential and Protection Requirements) as a water control structure and could be included in the Licensee's inservice inspection program for water control structures. During integrated assessment, other water control features may be identified which should also be included in the L icensee s formal inservice inspection program.
3.1.3 Conclusion On the basis of a review of the Licensee's submittal (2) and other site drawings and documents, it is concluded that the Licensee has adequately identified all cooling watgr system structures now present at the site.
Further, the flood protection structures identified by the Licensee are not appropriate to this inspection program as their successful operation does not protect plant structures and safety-related components from flooding.
3.2 DETAILS TO BE INSPECTED 3.2.1 Licensee Identification The following elements of the previously identified structures (as shown in Figure 1) were named by the Licensee (2) as appropriate inspection items:
A. Cooling Water System Structures Feature (s) to be Element Observed Frequency Intake, Sounding Once a year for first discharge, and 2 years and every 1 return intake to 5 years thereaf ter canals ,
depending on observed sedimentation rate Erosion, slope Yearly stability O
Adbnklin Research Center se m n v.msean u.
.M .
TER-C5257-539 Feature (s) to be Element Observed Frequency Weed growth Yearly 4
Forebay, Soundings Once a year for first cribhouse, and 2 years and every discharge 1 to 5 years there-structure after depending on observed sedimenta-tion rate Slope stability Yearly Structural Once a year for first integrity 2 years and every 1 to 5 years there-after depending on observed sedimenta-tion rate Blockage Yearly Cate valve on Trouble-free Yearly deicing line operation Intake and Structural Once a year for first discharge integrity 2 years and every conduits 1 to 5 years there-after depending on observed sedimenti-tion rate Blockage Yearly Flow regulation Soundings Once a year for station first 2 years and every 1 to 5 years thereaf ter depending on observed sedimentation rate Blockage of Yearly gate openings Ud0d Franklin Research Center 4c>=.enen.r e man d' - - ~ . _ . - - . ~ . . . , -
2 1
}
4 TER-C5257-539 Feature (s) to be Element Observed Frequency Trouble-free Yearly operation
'I
; Electrical and Input from station Undefined i mechanical equipment maintenance B. Flood Protection Structures All doors at Trouble-free Yearly grade level operation Water level gaga Availability Yearly i at cribhouse and readability
! 3. 2. .; Conclusion i
Review of tne Licensee's submittal (2], site drawings, and other documents shows that the Licensee has adequately identified all features of safety-related water control structures. Using historic failure rates as a guide, the Licensee should define the period of inspection frequencies for electrical and mechanical equipment associated with the flow regulation station.
'l The frequency of inspecting the intake and discharge structures for structural integrity should depend on considerations other than " depending on l
l~
observed sedimentation rate," as specified. Frequency of inspection should be based on historic occurrences of settlement, cracking, sinking, or other movement which may influence the stability of these structures.
3.3 INSPECTION PROGRAM Regulatory Guide 1.127 [3] states that "the inspection should be conducted l~ under the direction of qualified engineers experienced in the investigation,. _
'i design, construction, and operation" of water control structures. It also j,
specifies that " inspection personnel should be selected carefully. The inspector and the an$lyst should be practical, dedicated diagnosticians."
'* Security and operations personnel do not meet these criteria. Tec'hnically lll l 4A i!d!i Franklin Research Center i A Dmeson of The Frerwen insense a.
TER-CS257-539 trained staff members or consultants should perform all inspections and should be directed and reviewed by an experienced engineer.
3.3.1 Inspection Report
- Regulatory Guide 1.127 identifies the need to prepare inspection reports following inspection of safety-related water control structures. These documents should be maintained onsite for reference purposes. The Licensee has stated that (1) a technical report is prepared following each inspection, and (2) when significant changes are reported, an evaluation will be performed to determine the effects of the changes, and a report will be made to the NRC staff. This procedure is in keepir.9 with the positions identified in Regulatory Guide 1.127. Inspection data and reports are maintained onJite and available for comparison.
3.3.2 Frequency of Inspection t
The frequency of routine inspections stated by the Licensee is adequate wid2 the exception of those items for which the frequency of inspection depends on the observed sedimentation rate. Low rates of sediment deposition in one year do not imply low ratos in another year. The Licensee should use, as a guideline in defining inspection frequency, the most extreme rate of sedimentation recorded at the site.
The inspection program established by the Licensee should be modified to include special inspections af ter extreme events that challenge the integrity of any water control structures. For the UHS, significant buildup of ice or i other debris would be such an event.
l 3.3.3 Conclusion j On the basis of the preceding evaluation, it is concluded:
i l 1. The Licensee should comply with the requirement that all items in the inspection program be conducted or overseen by qualified engineering i personnel.
l l
l I. i Om UdJ Franklin Pesearch Center s em at N n non m l
, r j . .
TER-C5257-539
- 2. The inspection reporting system identified by the Licensee meets the intent of Regulatory Guide 1.127.
- 3. The frequencies of routine inspections conform with guidelines provided in Regulatory Guide 1.127.
- 4. Special inspection initiation criteria should be developed so that special inspections will be performed at the termination of extreme events (such as floods) that may jeopardize the integrity of water control structures. The formal inspection program to be initiated at the Dresden Unit 2 plant should incorporate such special inspections.
r l
l:
i I
4 1?
1 i
\'
' -10 Add Franidin Research Center l
Awsnr- -.
Jm
j .
TER-C5257-539
- 4. CONCLUSIONS The Licensee's present inservice inspection program for water control structures at Dresden Nuclear Power Station Unit 2 should be modified to conform more fully to the intent of Regulatory Guide 1.127.
Specifically, the following are recommended:
o Special inspections should be performed to assess the consequences of severe flood phenomena. To ensure that the future formal inservice inspection program contains provisions for special inspections, the Licensee should develop some initiation criteria which will prompt a special inspection, such as the occurrence of a rainfall event of greater than 3 inches in 24 hours.
o The Licensee should ensure that all inspections are undertaken by qualified personnel and are reviewed and overseen by suitably qualified engineers.
o Plant doors and the water level gage on the canals should be deleted f rom the list of diood control structures inspected under Regulatory Guide 1.127 since they perform no flood protection function.
Following the initiation of the changes recommended in this technical evaluation report, the inservice inspection for water control structures at Dresden Unit 2 will meet the criteria of Regulatory Guide 1.127.
I i
4dbbd Franklin Research Center A N an ar N r ==u.
Jm
. )
TER-CS257-539
- 5. REFERENCES t
- i. D. G. Eisenhut (NRC)
Imtter to all SEP Licensees January 14, 1981 4
- 2. T. J. Rausch (CECO)
Letter to D. M. Crutchfield (NRC)
Subject:
SEP Topic III-3.C February 16, 1982
- 3. " Inspection of Water-Control Structures Associated with Nuclear Power Plants" NRC, March 1978 Regulatory Guide 1.127
- 4. " Ultimate Heat Sink for Nuclear Power Plants" NRC, January 1976 Regulatory Guide 1.27
- 5. " Quality Assurance Pfogram Requirements (Design and Construction)"
NRC, March 1978 Regulatory Guide 1.28
- 6. " Site Investigation for Foundations of Nuclear Power Plants" NRC, March 1979 Regulatory Guide 1.132
- 7. " Design Basis Floods for Nuclear Power Plants"
{
NRC, August 1977 Regulatory Guide 1.59
- ! 8. Final Safety Analysis Report (FSAR)
Dresden Nuclear Power Station Unit 2 Commonwealth Edison Company I
.I nklin Research Center l ~ ~ - - .
- -. . . , . ,}}