Summary of 820314 Meeting W/Westinghouse,Duke Power Co,Sc Electric & Gas Co,Cn Almaraz & Cnasco in Bethesda,Md Re Resolution of Accelerated Tube Wear Experienced on Operating Plants W/Model D Steam Generators.W/Attendance List
ML20053C779
Person / Time
Issue date: 05/20/1982
From: Kane W
Office of Nuclear Reactor Regulation
To: Youngblood B
Office of Nuclear Reactor Regulation
References
NUDOCS 8206020554
Download: ML20053C779 (5)


Text

.

p.(*

MAY 2 01982 FOORMDIN FOR:

B. J. Youngblood, Chief, Licensing Branch No.1, DL FROM:

W. F. Kane, Project Manager, Licensing Branch No.1, DL

SUBJECT:

SUMMARY

OF TETING REGARDING WESTINGHOUSE 10 DEL D AND E STEAM GENERATORS A necting was held on March 14, 1982 in Bethesda, Md. with representatives froai Westinghouse and a nurber of utilities that had purchased plants utilizing the Model D steam generators. A list of attendees is provided in the enclosure.

The purpose of the meeting was to have Westinghouse discuss the progress made since our last meeting in resolving the accelerated tube wear experienced on i

operating plants with Model 0 steam generators. A summary of the previous meeting which was held on February 19, 1982 is provided in a memorandum dated March 15,1982 from S. Chesnut to B. J. Youngblood.

The major points made by Westinghouse at the meeting are summarized below:

1.

Data Correlation and Operating Limits A power level has been estabished by Westinghouse for the 11odel D2 and D3 steam generators for no significant wear.

Duke Power Company has requested and Westinghoisse has supported a 757, power level for Model D2 and D3 steam generators for 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br /> for wear less than the plugging limit.

Simultaneous feeding through main and auxiliary nozzles is acceptable to Westinghouse within established limits.

Field instnamentation data from 3 operating plants has been evaluated by Westinghouse, judged to be consistent and has been used in estimating wear.

A refined oddy current testing technique indicates wear depths lower than previously reported.

2.

Program for Model D2 and D3 Steam Generators

- Alternate modifications have been design and tested.

Full scale testing in the Swedish State Power Board loop is scheduled for completion by 6/14/82.

Scale model testing by Westinghouse shows significant reduction in tube ene nnne n Snr entnenn.n 2na 2norn,to -,u r f, 3 t f r +.,

3 8206020554 820520

'"CE>

PDR TOPRP EMVWEST

  • * ~ " " " * " * "

sunucut>

..c...

. Epa.

DQTE )

~..

nac ronu ais oo-aci nacu o24a OFFICIAL RECORD COPY usom mi-an m

s.

f

[*

8. J. Youngblood Ability to install modifications has been demonstrated by Westinghouse.

-- Field installation in first plant is scheduled to begin by 8/20/82.

3.

Program for Model D4, D5 and E Steam Generators Feed systen modification has been evaluated by Westinghouse and feasibility established for achieving 100% power.

i It was agreed that a follow-up generic meeting with Westinghouse would be appropriate in about a nonth.

William F. Kane, Project flanager Licensing Branch Ho.1 Division of Licensing

Enclosure:

As stated cc: See next page l

DL:LBel DL; b

suan2=E) WKanelh.t......

, - [.,

OFFICE )

..,.../...

JY.o n2.

.d...

5. /..a.. /. 8. 2........

5 2

om>

Nac ronu ais omeoj uncu cuo OFFICIAL RECORD COPY use m,_ m.

1

~

Mr. T. C. Nichols, Jr.

Vice President ~& Group Executive Nuclear Operations South Carolina Electric & Gas Company Post Office Box 764 Columbia, South Carolina 29218 cc:

Mr. Henry Cyrus Senior Vice President South Carolina Public Service Authority 223 North Live Oak Drive i

Moncks Corner, South Carolina 29461 e

J. B. Knotts, Jr., Esq.

Debevoise & Liberman 1200 17th Street, N. W.

Washington, D. C.

20036 Mr. Mark B. Whitaker, Jr.

Group Mariager - Nuclear Engineering & Licensing South Carolina Electric & Gas Company Post Office 764 Columbia, South Carolina 29218 Mr. Brett Allen Bursey Route 1, Box 93C Little Mountain, South Carolina 29076 Resident Inspector / Summer NPS c/o U. S. NRC Route 1, Box 64 Jenkinsville, South Carolina 29065

~

Mr. James P. O'Reilly U. S. NRC, Region II 101 Marietta Street Suite 3100 Atlanta, Georgia 30303 e

MF 9

9 e

e e

e 4

~~-t' O.

o ENCLOSURE LIST OF ATTENDEES NRC Staff Duke Power D. Eisenhut G. Copp G. Lainas W. Kane South Carolina Electric & Gas Company C. Cheng K. Wichman M. Quinton R. Bosnak J. Rajan C. N. Almaraz T. Su P. Ting J. Gorosarri R. Martin A.. Herdt CNASCO P. Bemi s J. Minns A. Burillo D. Collins E. Adensam M. Hum L. Frank R. Birkel H. Conrad J. Youngblood R. Senseny K. Jabbour T. Ippolito E. Murphy Westinghouse T. Timmons N. Beck-P. Rosa D. Burns R. Nath J. Hagood i

J. Shulties P. McDonough G. El der D. Grain F. Twogood W. Pennell tD 1

e.

MEETING

SUMMARY

DISTRIBUTION N

Docket File J G. Lear NR UR W. Johnston Local PDR S. Pawlicki TIC /NSIC/ Tera V. Benaroya ACRS.(16)

Z. Rosztoczy LB#1 Reading W. Haass H. Denton/E. Case D. Muller GAY 2 01982 R. Ballard D. Eisenhut/M. Jambor W. Regan R. Mattson B. J. Youngblood H. Thompson A. Schwencer F..Congel F. Miraglia

0. Parr J. Miller F. Rosa

~

G. Lainas W. Butler R. Vollmer J. P. Knight R. Houston R. Bosnak F. Schauer L. Rubenstein R. E. Jackson T. Speis M. Srinivasan Project Manager W. F. Kane Attorney, OELD J. Stolz M. Rushbrook S. Hanauer 0IE W. Gammill

>~

W. Minners F. Schroeder E. Adensam D. Skovholt M. Ernst NRC

Participants:

L. Hulman C. Berlinger DEisenhut RMartin HConrad K. Kniel Glainas AHerdt JYoungblood G. Knighton en 4

b WKane P8emis RSenseny A. Thadani y

CCheng JMinns KJabbour p

G.3%

1 KWichman DCollins TIppolito

~

RBosnak EAdensam EMurphy

[Z

\\h k

iki ~8 7

JRajan MHum

1... h TSu LFrank D. Ziemann

+@k $

PTing RBirkel 9,,,

bcc:

Applicant & Service List 9 yp' l