Forwards Completion Status of Certain NUREG-0737 Items,In Response to NRC
ML20053C667
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/27/1982
From: Jackson E
VERMONT YANKEE NUCLEAR POWER CORP.
To: Vassallo D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.3.1, TASK-2.B.2, TASK-2.B.3, TASK-2.B.4, TASK-2.E.1.2, TASK-2.E.4.2, TASK-2.F.1, TASK-2.K.3.10, TASK-2.K.3.15, TASK-2.K.3.19, TASK-TM FVY-82-61, NUDOCS 8206020448
Download: ML20053C667 (5)


Text

.

l VERMONT Y AN KEE NUCLEAR POWER CORPORATION SEVENTY SCVEN GROVE STREET RUTLAND, VERMONT 05701 FVY 82-61 REPLY TOf ENGIN~ERING OFFICE 1671 WORCESTER ROAD FRAMINGH AM, M ASSACH USETTS 017o1 TELEPHONE 617 872-8100 May 27,19812.f U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Office of Nuclear Reactor Regulation Mr. D.B. Vassallo, Chief Operating Reactors Branch #2

References:

a)

License No. DPR-28 (Docket No. 50-271) b)

Letter, USNRC to VYNPC, dated 3/17/82 c)

Letter, VYNPC to USNRC, FVY 82-50, dated 5/5/82 d)

Letter, USNRC to VYNPC, dated 4/21/82 e)

Letter, VYNPC to USNRC, FVY 82-26, dated 3/8/82 f)

Letter, VYNPC to USNRC, FVY 82-14, dated 2/19/82 g)

Letter, VYNPC to USNRC, FVY 82-1, dated 1/5/82 h)

Letter, VYNPC to USNRC, FVY 82-5, dated 12/29/81 i)

Letter, VYNPC to USNRC, FVY 81-171, dated 11/25/81 j)

Letter, VYNPC to USNRC, FVY 81-169, dated 11/25/81 k)

Letter, VYNPC to USNRC, FVY 81-162, dated 11/18/81 1)

Letter, VYNPC to USNRC, FVY 81-156, dated 11/9/81 m)

Letter, VYNPC to USNRC, VY 81-268, dated 9/30/81 n)

Letter, VYNPC to USNRC, FVY 81-111, dated 8/5/81 o)

Letter, VYNPC to USNRC, FVY 81-110, dated 8/5/81 p)

Letter, VYNPC to USNRC, FVY 81-69, dated 4/17/81 q)

Letter, VYNPC to USNRC, FVY 81-9, dated 1/13/81 r)

Letter, VYNPC to USNRC, WVY 80-170, dated 12/15/80

Dear Sir:

Subject:

Post-TMI Requirements i

Reference (b) requested Vermont Yankee to submit the completion l

status of certain NUREG-0737 items. The purpose of this letter is to l

forward the attached information in response to that request.

It should i

be noted that the completion of many of these items has already been verified and documented through subsequent I&E Inspections.

I

(

We trust that this information is acceptable; however, should you l

have any further questions, please contact us.

1 Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION l

b b0 0

00 1

Wb i

P PDR Earl W ackson y

Manage of Operations I

l

U.S. Nuc1 car Regulatory Commission VERMONT YANKEE NUCLEAR POWER CORPORATION May 27, 1982 Page 2 STATE OF VERMONT)

)ss WINDHAM COUNTY )

Then personally appeared before me. E.W. Jackson, who, being duly sworn, did state that he is Manager of Operations of Vern.ont Yankee Nuclear Power Corporation, that he is duly authorized to executc and file the foregoing request in the name and on the behalf of Vermont Yankee Nuclear Power Corporation and that the statements therein are true to the best of his knowledge and belief.

~W L

Diane M. McCue j

Notary Public M

My Commission Expires February 10, 1983 i

a PU8UC '

ona

VERMONT YANKEE NUCLEAR POWER CORPORATION J

ENCLOSURE 1 l

~

I.A.3.1 - Simulator Exams References (h), (m), and (r)

The impicmentation of this item, as described in the above References, was complete as of October 1, 1981.

II.B.2 - Plant Shielding i

References (g) and (r)

The implementation of this item, as discussed in the above References, was complete prior to the start up following the 1981 refueling outage.

II.B.3 - Post-Accident Sampling References (f), (g), (1), (j), and (r)

A system designed to meet the intent of this item, as discussed in l

the above References, was installed as of December 30, 1981.

Verification calculations are currently being finalized to close out this design. Any additional modifications required as a result of these calculations will be completed during the next refueling outage, currently-scheduled for the Spring of 1983.

II.B.4 - Training for Mitigating Core Damage References (c) and (r)

The training to meet the requirements of this item, as discussed in the above References, was complete as of October 1, 1981.

i II.E.1.2 - Auxiliary FW Inititation and Flow Indicator This item is not applicable to Vermont Yankee.

II.E.4.2 --Containment Isolation Dependability Reference (r)

As discussed in the above Reference, no modification or action was required for these items at Vermont Yankee.

1 l

s 2

4 4

m - ---..

,e#.

VERMONT YANKEE NUCLEAR POWER CORPORATION II.F.1.1 - Install Noble Gas Effluent Monitors References (f), (g), (q), and (r)

The installation of the monitors was complete as of December 11, 1981. As discussed in the above References, pre-operational testing was successfully completed on January 21, 1982.

II.F.1.2 - Capability for Effluent Monitoring of Iodine References (g), (1), (q), and (r)

The implementation of this item, as discussed in the above References, was complete as of March 1, 1982.

II.F.1.3 - Installation of Containment Radiation Monitor Reference (g) and (r)

The implementation of this item, as discussed in the above References, was complete as of November 28, 1980.

II.F.1.4 - Continuous Indication of Containment Pressure References (g) and (r)

The implementation of this item, as discussed in the above References, was complete as of November 28, 1980.

1

.IT,F.1.5 - Continuous Indication of Containment Water Level References (g) and (r)

The implementation of this item, as discussed in the above References, was complete as of November 28, 1980.

II.F.1.6 - Continuous Indication of Hydrogen Concentration in Containment References (d), (e), and (r)

Vermont Yankee's proposed implementation of this item was accepted by the NRC in Reference (d).

II.K.3.10 - Safety Grade Trip l

This item is not applicable to Vermont Yankee. l I

VERMONT YANKEE NUCLEAR POWER CORPORATION II.K.3.15 - Isolation of HPCI and RCIC Modifications References (k), (n) and (r)

The implementation of this item, as discussed in the above References, was complete prior to the startup following the 1981 refueling outage. Modifications to the HPCI System was complete as of October 14, 1981, and modifications to the RCIC System were complete as.of November 27, 1981.

II.K.3.19 - Interlock on Recirculation Pump This item is not applicable to Vermont Yankee.

r.