Consumers Power
- v~~~
Nuclear Licensmg Alministrator General Offices: 1945 West Pamell Pood, Jackson. MI 49201 + ($17) 788-1636 May ll, 1982 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR-20 PALISADES PLANT - RESPONSE TO IE INSPECTION REPORT 82-07 IE Inspection Report No. 50-255/82-07, dated April 12, 1982 reported the results of a surveillance program inspection conducted in March 1982. The report contained one item of noncompliance to which a reply is required.
The item of noncompliance and response thereto are as follows:
Item:
10 CFR 50, Appendix B, Criterion XII, " Control of Measuring and Test Equipment" states:
Measures shall be established to assure that tools, gages, instruments, and other measuring and testing devices used in activities affecting quality are properly controlled, calibrated, and adjusted at specified periods to maintain accuracy within necessary limits.
Contrary to the above, the licensee did not periodically calibrate or check hydrometers used to measure the specific gravity of electrolyte in station battery cells.
This is a Severity Level V Violation (Supplement I).
Response
a.
Corrective Action Taken and Results Achieved See Parts b and c.
b.
Corrective Action to Prevent Recurrence A program is being developed to periodically perform a single point check of hydrometers used in surveillances required by the Technical Specifications.
As an alternative to this checking program, the feasibility of employing one-time-use hydrometers will be evaluated.
8206020397 820527
/rf4y J 4 PDR ADOCK 05000255 ISRP G
e.
JGKeppler, Administrator 2
Palisades Plant Response to IE Inspection Report 82-C7 May 11,1982 c.
Date When Full Compliance Will be Achieved The corrective actions described above are scheduled to be implemented prior to the next use of hydrometers for performance of Technical Specification surveillance testing.
fll.k(
l L
David J VandeWalle Nuclear Licensing Administrator CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NRC Resident Inspector - Palisades l
l t
o.
9 e
e CONSUMERS POWER COMPANY Palisades Plant IE Inspection Report 82-07 Docket 50-255 License DPR-20 At the request of the Commission and pursuant to the Atomic Energy Act of 195h and the Energy Reorganization Act of 197h, as amended, and the Commission's Rules and Regulations thereunder, Consumers Power Company submits our response to IE Inspection Report 82-07, dated April 12, 1982.
CONSUMERS POWER COL'PANY
/
(
c (l~t.
f L(
bY
,l BY j,,
R B DeWitt, Vice President Nuclear Operations Sworn and subscribed to before me this lith day of May 1982.