ML20053C418
| ML20053C418 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 05/17/1982 |
| From: | Mckinney M GENERAL PUBLIC UTILITIES CORP. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20053C414 | List: |
| References | |
| NUDOCS 8206020093 | |
| Download: ML20053C418 (3) | |
Text
.
t Muclear TEMPORARY CNANCE NOTICE INSTRUCTION NEND p eo n ta. y g
' Roc m s CORRECT ADDRESS 2
ao.$'
'a+ #e #
IF NECESSARY
"* d#
REERN 70: Maursen kKinney WW o5G5 Procedure Centrol Room 130 Achin. Bldg. - Lhit 2 ffy-p-Please fasten the attached active Temporary Change Notices (TCN) listed below to the affecteo procedures in your file, and also algn the acknowledgement at the botten of this memo and return to Maureen McKinney, Procedure Centrol, Ainin. Bldg. as shown above.
TCN M3.
Procedure 2.
Instructions /Connents c - fa -Job
/0 S'l /4
/0$
JA AA /]e d a
The Temporary Change Notices (TCN) listed below have been cancelled.
Please destroy copies of the TCNs attached to the affected procedures in your file, and also sign the acknowledgement at the bottom of this memo and return to Maureen McKinney, Procedure Control, Achin. Bldg. as shown above.
TCN 2.
Procedure %.
Instructions /CDmments f
X9
'fl I hereby acknowledge receipt of this ammo and have conplied with the above instructions.
8206020093 G20525 PDR ADOCK 05000320 F
PDR (Signature)
(Ext.ft.)
(Oste)
~
A0000460 02/82 DOC Yn ensa.
" TEMPORARY CilANGE s'
SIDE 1 l
Three Mile Island Nuclear S:ation 1, figure 1001 5 Temporary Change Notice (TCN)
TCN NO.
A32 w 3 l
/ NOTE: Instructions and guidelmes in AP t ool (From TCN Log incent must be f ollowed when completire Unit No.
S this form.
S l' 0 lB d' Date 1.
Procedure _
1054.16 Cont. Injuries / Rad Overexposure No.
Title 2.
Chance (incive, asse numbers. paragrap i numbers and exact wo, ding nf change.)
See attached copies of pages 1.0 & 2.0 and additional 3 pages.
3.
Reason for Chance:
To coordinate activities between Unit 2 Control Room and Cormiand Center if an individual becomes ill or injured in the Reactor Building during an entry.
/
4.
Recommended by _
M n./fs
- 5. s(
A74th. ru
+'/be/A a
e SupervisaPs Segnature' Oate
[O 6.
Duration of TCN. No longer than ninety days from of factive date of TCN or as in (a) or (b) below whichever occurs first.
(a)
TCN will be cancelled by a procedure revision issued as a result of a Procedure Change Request to be submitted by CA C. s* u '
(Submit PCR es soon as possibia) lX l Supervisor Submittifg TCN (b) TCN is r.ot v: lid after l
j (fitt in circumstances which wns result in TCN oeirg cancelled)
{ -7.
(a) is the procedure on the Nuclest Safety Related Procedure List? (Sec. AP too1 - Appendix B)
If "Yes", completa Nuclear Safety Evaluation. (Side 2 of this Form)
Yes gy No,
i (b) is the procedure on the Environmental Impact Procedure List?
(See. AP toot - Apfwndin el if "Yes", complete Environmental Evaluation. (Side 2 of this Form)
Yes p
No [ y g IX l No l l
(c)
Does the change ef fact the intent of the original procedure?
Yes NOTE: If all answers are "no" the change may be approved by the Shif t Supervisor. If question (c) is answered "yes".the chers3e must te reviewed by the PORC and approval by the Station /tJnit Superintendent prior to imolementation. If the answer to question (c) is "no" the change may be opproved by two members of the plant manageme tt rtsff et least cae of whom hoids a senior reactor operators license on the unit affected in accordance with peregrsoh 3.6.4.2 of AP t ool.
8.
Rruiew and Aoprovat Block (c) "yes",
Black (c) "no" Approved
/#O Approved Shif t Sadrwsor/ Foreman Date SRO ucense Date Reviewed '
uomoet eient urg. Statf 0 ie Members Of PORC
/
/ A Reviewed Chairman of PORC Date 7b Approved Contacted a'
W' eri
' 04te Unit Superintencent Date g"
/ [4-.
Approved 7
/g44) nit Superu ehoey '
Date j
. The block (c) "Yes" review and approval chain may t,e f ollowed at anytime.
NOT
- h2
,L J.
@Jroval Manager, Generation Quality Assurance Date r40TE:
M.G.O. A. approval required only cn certain Administrative Procedures listed m Enclosure 7 of AP 1001 10.
TCN is Cancelled SNf t SupervercriSn.it Foreman Dete
i j
" EVALUATION"
~
SIDE 2 AP 1001 Three Mile Island Nuclear Station h
Figure 1001-4 Nuclear Safety / Environmental impact Evaluation 1.
Procedure 1054.16 Cont. Injuries / Rad Overexposure d 8?- M3 P.
Teese 7,mpo,vv Ch.nge Notice No.
~
- 2. Nuclear Safety Evaluation Does the attached procedure change:
- (a) increase the probabi!ity of occurrence or the consequences of an accident or malfunction of l
equipment important to saf ety?............................... yesO no
- (b) create the possibility for an accident or malfur.ction of a diff erent type than any svaluated previously in the saf ety analysis report?........................... yesO no O i
- (c) reduce the margin of safety as defined in the basis for any technical specification?..... yesO noO l
t Details of Evafuation ie..
.a.,nv.
i.n.... no-an.cn o.
ie r vi,.4.
This change is to integrate entry supervision personnel-into the EPIP provisions to provide better coordination and therefore has no effect on nuclear safety since the Control Room is still in ultimate control.
l Evaluation By Data fs-
//V
/ /
k
- 3. Environmental impact Evaluation
'Oces the attached procedure change:
(..
(a) possibly involve a :!gnificant environmental impact?...................... yesO noO (if 3(a) is "yes", answer questions (b) and (c) and fill in " Details of Evaluation" below.
If "no", state why by filling in the " Details of Evaluation" below).............. yesO no
- (b) have a significant adverse effect on the environment?...................... yes O no O
'(c) involve a significant er:vironmental matter or question not previously reviewed and evaluated by the N.R.C........................................ yes O no O Details of Evaluation tan..n.ooition.i
. ev r.avi.coi 1
1 l
Evaluation By -
Date i
4.
Unit Superintendent requests PORC review l l Checkif YES.
5.
Approval Evaluation ecompanying PCR Evaluation Accompanying TCN
}/f p()
Jhz
/
Sa0 ucensee Date t
/-
Onst Svoerentepoent
' Oste Reviewed w.
yDer of Piant Statt Oa te Apptoval Unit Superintencent Date NOTE.
The Evaluet.on " Accompenving a PCR" evatusta -i and approval cha.n mov De f ellowed at anytirne.
-