Monthly Operating Repts for Apr 1982
ML20053B861
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 05/14/1982
From: Pace P
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML20053B857 List:
References
NUDOCS 8206010296
Download: ML20053B861 (11)


Text

.

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO.53-250 UNir Turkey Point 3 M Y 1 4 l902 DATE COMPLETED liY ^ n,,, p g TELEPflONE (305) 552-3654' s

MONTH April 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL IMWe Net)

.(MWe-Net i I

17 664 2

18 667 653 3

19 4

20 534 5

6 664 22 679 7

23 g

697 8

24 704 23

'O 111 703 26 11 429 699 27 12 626 694 28 661 13 29 480 667 34 386 30 200 is 33 559 16

  • 23 baurs only - Daylight Savings Time INSTRUCTIONS On this foruut.hst the asetage daily unit power lesel in MWe St for each day in the reportin; m.inth. Compute to the nearest whole enepwatt.

(9/77) 8206 0 DN

OPERATING DATA REPORT DOCKET NO. 50-250 DATE MAY 1 4 1087 COMPLETED BY P-I Pa rn-

-TELEPilONE (305) 55?-3654 OPERATING STATUS Turkey Point 3 Notes

1. Unit Name:
2. Reporting Period:

Aoril 1982 Unit 3 returned to service ~

3. Licensed Thermal Power (MWt):

2200 following the steam aenerator I

4. Nameplate Rating (Gross MWe):

repair program. See'the 760 S. Design Electrical Rating (Net MWe): 693

" Unit Shutdowns and Power

6. Maximum Dependable Capacity (Gross MWe): m Reduction Report" 646
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report Cive' Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):

flone

10. Reasons For Restrictions,if Any:

This Month Yr to-Date Cumulatise 719 2879 82 424.6 11 liours in Reporting Period

12. Number Of flours Reactor Was Critical 514_6 Sia_g 56 274_7
13. Reactor Reserve Shutdown llours 0

0 844.4

14. Hours Generator On-Line a17 7 a77 7 5;a 19A 7
15. Unit Reserve Shutdown flours 0

0 171 R

16. Gross Thermal Energy Generated (MWH) 905 576 905 576 110 103 131
17. Gross Electrical Energy Generated (MWil) 290 150 290 150 34 983 775 265 919 33' 087 585
18. Net Electrical Energy Generated (MWH) 271 537 _

15.2 65.9

19. Unit Service Factor 60.9
20. Unit Availability Factor AO 4 15.9 66.1
21. Unit Capacity Factor (Using MDC Net) '

58.5 li.C E5.1

22. Unit Capacity Factor (Using DER Net) 54.5 13.6 57.9 l
23. Unit Forced O ' age Rate 47 47 41
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

I

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY CO\\l\\1ERCIAL OPERA l'lON P1/77) e

i UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-250 UNITNAME Turkev Point 3 DATE MAY 4 e eee REPORT MON nt April 1982 COMPLETED BY P I1 Pice" TELEPHONE (100 68;?-3fiE4_,

3?

3 Yk Licensee

[ t, b,

Cause & Corrective L.

Date i

5E 4

_s s 5 Esent 27 6

Action to

}'?

j5 j gjj g Report tE L Prevent Recurrence

C 05 81-06-24 S

219.6 B

4 HB HTEXCH Steam Generator Repair Program (continued) 01 82-04-10 F

6.5 A

3 IA INSTRU SEE ATTACHED SHEET FOR I!1FORf%TI0fl 02 82-04-15 S

17.3 8

1 HA TURBIfl 03 82-04-20 F

21.7 A

3 HH CKTBRK 04 82-04-20 F

5.4 A

3 HH CKTBRK 05 82-04-29 F

10.8 A

3 HH PUMPXX 06 82-04-30 F

0 A

5 HH PUMPX l

2 3

4 F: Forced Reamn :

Method:

Exhibit G - Inst:uctions S: Sheduled A I quipment Failure (Explain)

I-Manual for Preparation of Data li Maintenance of Test 2 M~nual Seram.

Entry Sheets for Licensee C Refueling 3-Autornatic Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction QOther (Explaini 016I)

L-Operator Training & License Examination F Administrative pg 5

(9/77)

. G Operational Errur (Explain) 4- _ /.o a o ase ve.,..el Exhibit I - Same Source il Other (Explain)

l ATTACHf1EllT

+

CAUSE & CORRECTIVE ACTI0fl 01.

Reactor trip cuased by a spike on one channel of over temperature

/aT instrument while performing maintenance on the other channel.

02.

Unit taken off line for turbine over speed test, then shutdown following indication of a dropped rod.

03 Reactor trip due to high steam generator level which was caused by a failure of the controller of the feed regulating valve.

04 See cause for shutdown #3 above. Controller was repaired.

05 Reactor trip caused by low level in the steam generator due to failure of a condensate pump. A second trip occured while still off line due to a power spike to nuclear instruments.

06 Power reduction due to reduced number of condensate pumps available.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.00~E0I UNIT Turkey Point 4 MAY 141982 DATE COMPLETED BY P. L. Pace TELEPflONE (305) 552-3654-s MONTH Anril 1982 DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL tMWe Net)

~

.fMWe-Neti I

6Ro 667 17 2

679 663 18 678 657 3

19 677 20 656 5

673 21 659 309 6

660 22 663 6 64 7

~3 3

652 s

671 28

~

671 25 678

  • 9 666 10 26 678 668 11 27 gqi 12 678 23 675 609 13 29 469 14 670 91 30 665 is 31 16 665
  • 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> only - Daylight Savings Time i

INSTRUCTIONS On this format. int the aserage daily unit power lesel in MWe-Net for each day in the reporting month. Compute the nearest whole exgawatt.

(9/771

OPERATING DATA REPORT DOCKETNO. 50-251 DATE r'IAT 14 m2 COMPLETED BY P-I Para TELEPIIONE (305) 552-36:y4 OPERATING STATUS Turkey Point Unit 4 Not*5

l. Unit Name:
2. Reporting Period:

April 1932 Unit 4 operated at essentiall y

3. Licensed Thermal Power (MWt):

2200 full power expect for., outages

4. Nameplate Rating (Gross MWe):

760 as indicated in the'" Unit.

693 Shutdown and Power

5. Design Electrical Rating (Net MWe):

680 Reduction" Report.

6. Maximum Dependable Capacity (Gross MWe):

646

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):

Hnno

10. Reasons For Restrictions,if Any:

G This Month Yr..to Date Cumulatise 719 2879 76 152

11. Ilours in Reporting Period
12. Number Of flours Reactor Was Critical 644 4 7700 1 R6 674.7
13. Reactor Reserve Shutdown flours g

n 166 6

14. Ilours Generator On Line 670 a 2658.I RA 7A?.5
15. Unit Reserse Shutdown Hours n

n 11 9

16. Gross Thermal Energy Generated (MWil) 1 484 540

_5 824 275 115 040 898

17. Gross Electrical Energy Generated (MWH) 471 905___.

1 874 460 36 596 527

18. Net Electrical Energy Generated (MWH) adA 706 1 7Al 177 14'670 100
19. Unit Service Factor 94.6 92.3 71.9
20. Unit Availability Factor 94.6 92.3 71.9
21. Unit Capacity Factor (Using MDC Net) 46 6 45 A 70 R
22. IJnit Capacity Factor (Using DER Net) 90.1 R9.3 65.7
23. Unit Forced Outage Rate 3.9 1.2 2.9
24. Shutdowns Schednied Oser Next 6 Months (Type.Date,and Duration of Each1:
25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INilIA L CRITICA LITY INIIIAL ELECTRICITY COM\\1ERCIA L OPER ATION (9/77) t

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-251 UNIT NAME lurkey Poirit 4 DATE M ay...rme REPORT MONTH ADril 198?

COMPLETED BY P.'I" Pats ~'

TELEPtIONE (305) 552-3654 "i

._! 3 I"-

Licensee h

f4 Cause & Corrective N"-

DJ'c j

I 26 4

_E E er:

Esent b

F7 E-T Action to

$5 j5g Report

~

rE C

]L Prevent Recurrence 6

5.

82-04-06 F

11.8 A

3 EB ELEC0tl 6.

82-04-13 F

1.7 8

3 IA INSTRU 7.

82-04-23 F

1.8 A

3 HH PUtiPXX SEE ATTACHED SHEET FCR INFORMATION 8.

82-04-29 F

7.1 A

3 HH PUMPXX 9.

82-04-30 F

16.7 A

3 HH VALVEX t

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions S: Sched uled A Equipment Failure (Explain) 1 Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Report (LER) File (NUREG.

D-Regulatory Restriction 9 Other (Explain) 0161)

E-Operator Training & License Examination F Administrative 5

C Operational Error (Explain) c _ /.o ao a.go ve.,...J Exhibit I. Same Source (9/77)

Il-Ot her ( Explain)

ATTACHMENT CAUSE~& CORRECTIVE ACTION 5.

Reactor trip due to turbine runback caused by a ground on a vital instrument bus.

The ground was repaired.

6.

Reactor trip caused by a spurious signal which occurred during reactor protection system testing.

7.

Reactor trip due to loss of Stean Generator feed caused by.a condensate pump trip.

Feedwater was restored and the unit returned to power.

8.

Reactor trip caused by turbine runback which resulted fran a loss of instrument power.

The instrument was being powered from Unit 3 which had tripped of f the line.

9.

Reactor trip caused by low level in the Steam Generator due to mechanical failure of feed regulator valve controller.

r

_y

e AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-335 UNirSt. Lucie 1 I4 DATE COMPLETED BY P. L. Pace TELEhl0NE (305).552-3654' s

MONT}i Anril 1982 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

-(MWe Net) 1 87 835 816 2

18 8.36 3

829 834

.i 19 825 W

4 20 825 5

837 21 825 6

22 838 7

826 839 23

826 842 8

24 833 9

841

  • 25 10 839 26 840 839 839 27 12 840 839 28 840 13 838 29 14 838 30 839 837 15 31 836 16 23 hours2.662037e-4 days <br />0.00639 hours <br />3.80291e-5 weeks <br />8.7515e-6 months <br /> only - Daylight Savings Time INSTRUCTIONS On this fonnat.htt the average daily unit power lew! in MWe Net for ca:h day m the reporting ra.inth. Compute to the nearest whole rmgawatt.

i (9/77)

.--. - _ _ - ~

n.

OPERATING DATA REPORT DOCKET NO. 50-335 DATE MAY 1 A 1997 COMPLETED 15Y D. L. Dare TELEPIIONE (305) 552-3654 OPERATING STATUS Lude Unit 1 Notes

1. Unit Name:

St. Lucie Unit 1 operated at

2. Reporting Period: Anvil 1009 essentially full power for
3. Licensed Thermal Power (MWt):

7700 gg R90

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 830 862
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependabic Capacity (Net MWe):

R17

8. If Changes Occur in Capacity Ratings (Items Number 3 Throtgh 7) Since Last Report. Give Reasons:
9. Power Leve! To which Restricted,if Any (Net MWe):

Hnno

10. Reasons For Restrictions,if Any:

This Month Yr. to.Date Cumulative 719 2879 46 967 i1. Hours in Reporting Period 719 2879 37 708.4

12. Number Of Hours Reactor Was Critical 0

0 205.3

13. Reactor Reserve Shutdown Hours
14. Ilours Generator On-Line 714 7n70 as n71 o 0

0 33. 3

15. Unit Reserve Shutdown flours
16. Gross Thermal Energy Generated (MWH) 1 922 bag 7 gAA ggn on'oA8 a78
17. Gross Electrical Energy Generated (MWH) 631 970_

? Enn 190 po sga aos

18. Net Electrical Energy Generated (MWH) 599 796 2 373 208 27 R'57 755 100.0 100.0 78.5
19. Unit Service Factor 100.0 100.0 78.6
20. Unit Availability Facto, 102.1 105.0 76.3
21. Unit Capacity Factor (Using MDC Net) 100.6 102.1 73.9
22. Unit Capacity Factor (Using DER Net) 0 0

5.2

23. Unit Forced Outage Rate
24. St.utdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

<+onm nonor,+nr i n e n o r + 4 n.,

c 9 mmmbe

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY INITIAL ELECTRICITY CO\\lMERCI AL OPER ATION (9/77)

I T

UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-335 UNIT NAME 9t I ucie 1 DATE - M4Y f a 1ce COMPLE1ED ay P. L. Pace ~

REPORT MON fil an il lop?

TELEPilONE (305) 552-3654 e.

E E

3?

3 jYl Licensee j r, Ne Cause & Correceive No.

DJ'e i

3?

4

.5 i $

Event 4:

7?

G ~$

Action to o

E 3 5 :s Report rE R 5'

Prevent Recurrence A

u 6

St. Lucie Unit 1 operated at essentially full power for the entire month.

I 2

3 4

F: Forced Reason:

Method:

Exhibit C Instiuetions S. Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance of Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 Automatie Scram.

Event Report (LER) File (NUREG-D Regulatory Restriction 9-Other (Explain) 01011 1 -Opera or Training & License Examination F-Administrative Y ~ O * *' " ""

5 G Operational Error iExplain) c _ 4 e a o a.4ev<cr..c/

Exhibit 1. Same Source (9/77) li-Ot her ( Explain)

_ _ _ _ _ _.