ML20053B779
| ML20053B779 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 05/14/1982 |
| From: | Mason C TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML20053B780 | List: |
| References | |
| NUDOCS 8206010227 | |
| Download: ML20053B779 (1) | |
Text
/
/
q TENNESSEE VALLEY AUTHORITY r
Sequoyah Nuclear Plant q
P. O. Box 2000
/
Daisy, Tennessee 37319
/
~MAY 141982 Nuclear Regulatory Commission Office of Management Information and Program Control.
Washington, DC 20555 Gentlemen:
Enclosed is the April 1982 Monthly Operating Report for Sequoyah Nuclear Plant.
Very truly yours, TENNESSEE VALLEY AUTHORITY l
hd C. C. Mason Power Plant Superintendent j
Enclosure cc (Enclosure):
Director, Region II Director, Office of Management Director, Office of Management Information and Program Control Nuclear Regulatory Commission Nuclear Regulatory Commission 101 Marietta Street Washington, DC 20555 (2 copies)
Suite 3100 Atlanta. GA 30303 (1 copy)
Director, Office of Inspection and Enforcement Nuclear Rr;.. story Commission Washington, DC 20555 (10 copies)
Mr. A. Rubio, Director Mr. Bill Lavallee, NSAC Electric Power Research Institute P. O. Box 10412 Palo Alto, CA 94304 (1 copy)
Mr. R. C. Goodspeed MNC 461 i
Westinghouse Electric Corporation P. O. Box 355 Pittsburgh, PA 15230 (1 copy) 3 l, l k
An Equal Opportunity Employer J