ML20053B658
| ML20053B658 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 05/14/1982 |
| From: | Larry Wheeler Office of Nuclear Reactor Regulation |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8206010111 | |
| Download: ML20053B658 (2) | |
Text
\\
'~ i e
m
~g -
N/
i
/
S 4M fiE C E P/ 3
~
/
Hg i
/
' Docket Nos.: 50-443 t "MAY 251993c and 50-444 IS.$ ?di;p p /
/
E mc y
APPLICANT: Washington Public Power Supply System g
p FACILITY:
Washington Nuclear Power 3 (WNP 3)
SUBJECT:
MEETING SUf9tARY On May 11, 1982, Mr. K. Cook, Licensing Manager for WNP 3, met with the NRC l
Division of Licensing (Mr. L. Wheeler and Ms. J. Lee) at the NRC headquarters in Bethesda, Maryland. A copy of the meeting notice is attached as Enclosure 1.
l Mr. Cook presented an updated status of the project in preparation for the tendering of an operating license application, now planned for June 2,1982.
The information included:
Recent construction progress and future construction goals Current utility organization Updated design features
.. Open items not yet completed OL application conformance with appropriate documents (SRP,RGs,etc.)
The licensing review schedule was discussed. There was general agreement on the times for major milestones. Specific dates will appear in an NRC letter to the applicant following a determination that the application is acceptable for docketing.
The meeting lasted approximately two hours.
MUnalsigned by-Louis L. Wheeler, Project Manager 9206010[tIg ticensing oranch no. 3 Division of Licensing Enclousre:
As stated g
Seeattachedsheetfgrdistribution See next Iage DL:L #3 D
1 suamuc h
-.LWhg 1 g ph FM j,,,i a,,,
,,B2 5/,
/82 5//..
om>
Nnc ronu ais oom> Nacu o:40 OFFICIAL RECORD COPY osc.m mi-mm
MEETING
SUMMARY
DISTRIBUTION Document Control (50-
)
LPDR PDR NSIC TERA LB#3 Files IJLee Loooo 4*hukA PM Attorney, OELD I&E Regional Administrator, Region _I NRC Participants cc: Service List