Interim Part 21 Deficiency Rept Re Seismic Qualification of Essential Damper Actuators.Vendor Reported That 13 HVAC Damper Actuators Mounted by Single Bolt as Opposed to Four Bolt Mounting Method.Final Rept Expected by 821231
ML20053B500
Person / Time
Site: Zimmer
Issue date: 05/14/1982
From: Borgmann E
CINCINNATI GAS & ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-82-645-000 10CFR-50.55E, PT21-82-645, PT21-82-645-000, QA-1745, NUDOCS 8205280468
Download: ML20053B500 (2)


Text

.

TIIE CINCINNATI GAS & ELECTRIC COMPANY sul ZIMMER POWER STATION, P. O. BOX 201, MOSCOW, 011 45153 cincinnari.osio 4ezo May 14, 1982 QA-1745 E. A. BORGMANN

$C NIOR VIC E PPC S* DENT U. S. Nucient Regulatory Commission Region III 7-9 Roosevelt Rd.

Glen dilyn, IL 60137 Attention:

Mr. J. G. Keppler Regional Administrator RE:

WM. H. ZIMMER NUCLEAR POWER STATION UNIT 1 10CFR50.55(e) ITEM M-24 SEISMIC QUALIFICATION OF ESSENTIAL DAMPER ACTUATORS-DOCKET No. 50-358, CONSTRUCTION PERMIT NO. CPPR-88, W.O.

  1. 57300 JOB E-5590 FILE NRC-8 M-24 Gentlemen:

This letter constitutes an interim report concerning the subject deficiency, initially reported to the Commission under the require-ments of 10CFR50.55(e).

American Warming and Ventilating Company (AWV), supplier of essential llVAC dampers notified CG&E that thirteen (13) damper act-untors were found deficient in that they were mounted by a single bolt as opposed to the four bolt mounting method which was originally qualified for seismic loading. AWV has previously notified the Commission of this defect under 10CFR21.

AWV has submitted test results for a modified bracket with a t

four bolt mounting arrangement. Our Architect / Engineer, Sargent and Lundy (S&L) reviewed and rejected the report and has suggested that the existing mounting brackets be replaced with the originally quali-i fied mounting arrangement. AWV has agreed to review this suggestion and inform S&L of their decision.

It is expected that this item will be resolved by December 31, 1982, at which time a final report will be submitted, i

l l

8205280 MAY 2 4 1982' E

l 1

e a

'Mr. J. G. Keppler Regional Administrator

- hay 13, 1982 QA-1745 Page 2 We trust the above will be found acceptable as an interim report under 10CFR50.55(e).

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY

~

By E. A. BORGMANN SENIOR VICE PRESIDENT FKP:pic cc: NRC Resident Inspector Attn:

W. F. Christianson NRC Office of Inspection and Enforcement Washington, D. C.