ML20053B473

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept of Reportable Condition 175 Re Weld Defects Found During Reverification of Wbg Radiographs, Initially Reported 811119.Defective Welds Will Be Repaired Prior to Sys Turnover.Radiography Review Complete by 820601
ML20053B473
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/18/1982
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML20053B463 List:
References
10CFR-050.55E, 10CFR-50.55E, 175, NUDOCS 8205280435
Download: ML20053B473 (2)


Text