Forwards Scope,Outline & Schedule for Branch Technical Position on Borehole & Shaft Sealing
ML20053B028
Person / Time
Issue date: 04/30/1982
From: Greeves J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Miller H
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
REF-WM-1 NUDOCS 8205270639
Download: ML20053B028 (14)


Text

__

.-~ _

l FDA Pr%+f/

Distribution gf 3

l 108.4/JER/82/04/28/0 WH r/f 3,y NMSS r/f APR 3 01982 JRhoderick & r/f JGreeves Wi1HT: ~3108141; HMiller MBell PAltomare REBrowning i

MEMORANDUM FOR:

Hubert J. Miller, Chief JBMartin High-Level Waste Technica]

CF Development Branch PDR p

b, 1

e, 4 T6 Division of Waste Management N

YJ-t g4 E

FR0ft:

John T. Greeves, Section Leader Design Section Y:,

.}

~~

High-Level Waste Technical

\\

IN V

, g w[

Development Branch Division of Waste fianagement t

6 l

SLBJECT:

SCOPE AND OUTLINE FOR THE BRANCH TECHNICAL POSITION BOREHOLE AND SHAFT SEALING 4

Attached is the scope and outline for the Branch Technical Position on i

Borehole and Shaft Sealing. This satisfies the OPS Plan Commitment 3123128.

ORIGINAL SIGNED BY John T. Greeves, Section Leader Design Section High-Level Waste Technical Development Branch Division of Waste fianagement

}

I DIST:

TICKET NO:

0FC :

WMHTao WMHT l_____:_____.b_:_____^_/,..___:....________:____________:..____.....:.___________:___________

NAME ORhoderick:btt JGraedes

_____:_______...._:___li______:____________::____________::____________:____________

~

$DATE:82/04/28 4'/.50/82 c._

~-. -,,, -

_m

,_.,,,.y,,_,_.-,,.,,..,,%,,,.~

,,c_m.,,,

--me.

,m.,

m._,-..

108.4/JER/82/04/30/0 Scope, Outline, and Schedule for the Branch Technical Position on Borehole and Shaft Sealing A. Scope

Background

DOE is presently planning to dispose of high-level nuclear waste in a deep geologic repository. Characterization of the site and access to the underground facility will be accomplished by manmade underground openings such as shafts and boreholes. These manmade openings will be sealed at decommissioning of the nuclear waste facility based on the requirements of 10 CFR Part 60. Specific requirements in Part 60 for borehole and shaft seals are subsections 60.133 and 60.142.

The technical position on borehole and shaft sealing will give guidance to DOE on what minimum design and verification requirements for seals are necessary in order to meet the regulatory needs of 60.133 and 60.142.

Discussion l

l Manmade underground openings in most states are generally required to be sealed when they are no longer in use. This type of sealing technology exists in the petroleum industry.

However, there are several distinct differences between the petroleum industry sealing technology and what

108.4/JER/82/04/30/0 technology is required for the sealing of openings in a geologic repository. This is based on the longevity requirement and the isolation and containment requirement for the geology repository.

Therefore, the criteria governing the design of shaft and borehole seals for a high-level waste repository must be more stringent than existing criteria for routine plugging of boreholes due these additional requirements Based on a review of current studies in sealing technology (0NWI-15, ONWI-54, ONWI-55, ONWI-108, ONWI-255), the following are areas that presently represent sealing issues or unique problems in repository sealing that will be encountered in designing shaft and borehole seals in a geologic waste repository.

1)

Importance of shaft and borehole seals to the performance of the repository 2) obtaining reasonable assurance of seal long-term stability 3) acheiving a low permeability in the sealed area (e.g. rock zone fractured by shaft or borehole excavation, interface of host rock to sealing material, and sealing material) so as to avoid the potential of the shafts and boreholes being a preferential pathway to groundwater and radionuclides l

l 1

l

108.4/JER/82/04/30/0 4) design of shafts and shaft excavation with consideration of long-term sealing requirements 5) installation procedures for seals 6) seal compatibility with site specific repository environments The technical position will discuss these issues and develop guidance on how they effect the design of the seals and what minimum design qualification and verification requirements are necessary for compliance with regulatory requirements.

l The technical position will have a level of detail similar to ONWI-55, t

Repository Sealing-Design Approach 1979, in that it will be describing in generic terms I

i l

1) what information is necessary for reasonable assurance of seal performance, 2) when it is needed for a license evaluation, 3) what parameters are considered to be critical to seal performance, and 4) minimum verification requirements 1

necessary for assessing compliance with requirements.

l The conceptual design for sealing in basalt will not be submitted to the NRC until 1983. Therefore, information in the BWIP SCR on sealing will 1

i 108.4/JER/82/04/30/0 4-i 1

l be used as reference material for the sealing

  • technical position with additional information being available when the conceptual design is I

submitted.

4 m

l e

i 4

e i

i l

l I

I

(

f I

t f

t i

4 108.4/JER/82/04/30/0 5-4 B. Outline

===.

Background===

The DOE is planning to dispose of nuclear waste in a geologic repository. Characterization of the site and access to the underground facility will be accomplished by manmade underground openings. These openings will be sealed at decommissioning of the repository.

Regulatory Framework Regulatory requirements for sealing shafts and boreholes.

1) 10 CFR 60 a) 60.133 - Design requirements of seals b) 60.142 - Design verification of seals l

2)

State and local requirements i

e 4

-c

,_.r.

e.-

1 108.4/JER/82/04/30/0 Issues 1)

Ir.portance of shaft and borehole seals 2)

Long-term stability of seals 3)

Possibility of seal area being a preferential pathway for groundwater and radionuclide transport 4)

Design of shafts with considerations for long-term sealing 5)

Installation procedures for sealing 6)

Seal compatibility with site environment Information Needs 1)

Information necessary to determine compliance with regulatory requirements 2)

Minimum design qualification requirements necessary for l

construction authorization.

I Design Verification 1)

Hinimum design verification requirements to be performed during construction of the repository.

108.4/JER/82/04/30/0 7_

l C. Schedule r

1)

Scope and Outline April 30,1982 2)

Scope and Outline reviewed with DOE June 10, 1982 3)

First Draft July 16, 1982 4)

Second Draft, review with H. Miller July 23, 1982 5)

Third Draft, review with DOE and technical community July 30, 1982 6)

Fourth Draft August 30, 1982 7)

Review by H. Miller, J. flartin September 30, 1982 8)

Formal Submittal to 00E T.B.D.

e

108.4/JER/82/04/22/0 D.

REFERENCES ONWI-3 Development of Plan and Approach for Boreholes Plugging Field Testing, October 1978, D'Appolonia Consulting Engineers ONWI LIB 0107 Permeability Measurements on Cementitious Materials for Nuclear Waste Isolation; E.L.

White, B.E. Scheetz, D. M. Roy, K.G. Zimmerman, M. Grutzeck; PSU ONWI LIB 0108 Roles of Admixtures in Preparing Dense Coments for Radioactive Waste Isolation; D.M. Roy, M.

Daimon, B.E. Scheetz, D. Wolfe-Confer, K. Asaga; PSU ONWI 15 The Status of Borehole Plugging and Shaft Sealing for Geologic Isolation of Radioactive Waste, January 1979, Office of Nuclear Waste Isolation C-78-1 Borehole Plugging Program (Waste Disposal),

Report 1, Initial Investigations and Preliminary Data; J. Boa, WES; January 1978 ORNL/SUB-3960/2 Feasibility of Sealing Boreholes with Compacted Nctural Earther Materials (Vol'Jmes 1, II, and III); R.T. Martin, MIT; June 1975 ORNL/SUB-4091/1 Borehole Plugging by Hydrothermal Transport, A Feasibility Report; D.M. Roy, W.B. White, PSU; May 30 1975 ORNL/SUB-4091/2 Borehole Plugging by Hydrothermal Transport, An Interin Report on Experimental Studies; D.M.

Roy, W.B. White, PSU; May 30, 1975 RNL/SUB-4091/3 Borehole Plugging by Hydrothermal Transport, Final Report; D.M. Roy, E.B. White, PSU; May 30, 1975

108.4/JER/82/04/22/0 RNI "R-4091/5 Borehole Cement and Rock Properties Studies, Progress Report; D.M. Roy, PSU; August 10, 1976 R'

'19966 Borehole Sealing, Final Report; Dowell; March 1, 1973 - October 31, 1973

.'33542 Sealing AEC#1 Well Lyons, Kansas, Final Report; Dowell; October 1, 1973 - January 30, 1974, February 1974 RNL/SUB-75/76230 A Study of Borehole Plugging in Bedded Salt Domes by Earth Melting Technology; D.L. Black; June 1975 RH0-BWI-CD-11 Borehole Plugging Program; Basalt Waste Isolation Program; April 1978 OWI/SUB-4091/6 Borehole Cement and Rock Properties Studies; D.M. Roy, PSU;. Progress Report for Period October 1, 1976 - September 30, 1977, September 30, 1977 OWI/SUB-7087/1 R-995 Borehole Plugging by compaction Process Final Report; R. Fernandez; August 1976 OWI/SUB-78/45709/005 Telemetry System for Monitoring Borehole Plugs, Monthly Report for June 1978; R. Galloway, J.

Stokes ONWI-5 Borehole Cement and Rock Properties Study, Part A. Borehole Plugging Cement Studies. Annual Progress Report; D. Roy, R.E. Scheetz, E.L.

White, M. Daimon; October 1, 1977 - September 30, 1978 ONWI-35 Borehole Plugging Telemetry System; R.

l Galloway, J. Stokes, D. Swift, IRT Corp.;

j October 8, 1979

~

~

ORNL-5524 Coment Technology for Plugging Boreholes in Radioactive Waste Repository Sites:

Progress Report for the Period October 1, 1977 to September 30, 1978; J.G. Moore, ORNL; August j

1979 l

i

108.4/JER/82/04/22/0.

ORNL/TM-7092 Cement Technology for Borehole Plugging:

An Interim Report on Permeability Measurements of Cementitious Solids; E.W. McDaniel, ORNL; January 1980 0RNL/TM-7106 Cement Technology for Borehole Plugging:

Interim Report on the Effect of Fly Ash and Salt on The Physical Properties of Cementitious Solids; J.G. Moore, ORNL; March 1980 SAND-79-0640 Waste Isolation Pilot Plant (WIPP) Borehole Plugging Program Description; C.L. Christensen, T.O. Hunter, Sandia Labs; August 1979 SAND-79-1514 Borehole Plugging Materials Development Program, Report 2; C.W. Gulick, J.A. Boa, D.M.

Walley, A.D. Buck, WES and Sandia Labs; November 1979 SAND-79-2141 Borehole Plugging Program Status Report October 1, 1978 - September 30, 1979; C.L. Christensen, Sandia Labs; January 1980 SAND-80-0358C Bell Canyon Test (BCT) Cement Grout Development Report; C.W. Gulick, J.A. Boa, A.D. Buck; Sandia Labs and WES; 1980 SAND-79-0640 Waste Isolation Pilot Plant (WIPP), Borehole Plugging Program Description; C.L. Christensen, T.O. Hunter; August 1979 SAND-80-0502C Role of Borehole Plugging Program in the Evaluation of the Waste Isolation Pilot Plant; T.0. Hunter, Sandia Labs; May 1980 SAND-80-0408C Bell Canyon Test (BCT) Instrumentation Development; C.W. Cook, C.B. Kinabrew, P. Lagus, R. Broce, Sandia Labs; May 1980 SAND-80-2376C Results From the Bell Canyon Borehole Plugging Test; C.L. Christensen, Sandia Labs; December 1980

108.4/JER/82/04/22/0

' SAND-80-0812 Recommended Analysis' Plan for the Borehole Plugging Program Potash Core Test; S.J. Lambert, Sandia Labs; May 1980 ONWI-30 Evaluation of Cement Borehole Plug Longevity, A Topical Report; D.M. Roy, M.W. Grutzeck, P.H.

Licastro, PSU; February 1979 ONWI/SUB/78/

Cement-Based Borehole Plugging and Shaft E512-04200-5 Sealing Systems; D.M. Roy, PSU; June 1980 ONWI-70 Characterization of Samples of a Cement-Borehole Plug in Bedded Evaporites from Southeastern New Mexico; B.E. Scheetz, M.W.

Grutzeck, L.D. Wakeley, D.M. Roy, PSU; July 1979 ONWI-54 NWTS Repository Sealing Program Plan; D' Appolonia Engineers; 1981 (draft)

ONWI-55 Repository Sealing - Design Approach - 1979; D'Appolonia Engineers; 1980 ONWI-90 An Evaluation of Generic Similarities and Differences in Requirements for Sealing Shafts, Tunnels, and Boreholes, D'Appolonia; 1981 ONWI-108 Repository Sealing:

Evaluations of Materials Research Objectives and Requirements; D'Appolonia; 1980 RH0-BWI-ST-7 Engineered Barrier Development for a Nuclear Waste Repository Located in Basalt; Rockwell; May 1980 RH0-BWI-ST-67 Preconceptual Systems and Equipment For Plugging of Man-Made Accesses To A Repository in Basalt; Rockwell, subcontractor Woodward-Clyde, September 1980 ONWI-198 PSU/WES Interlaboratory Comparative Methodology Study of an Experimental Cementitious Repository Seal Material; D.M. Roy, M.W. Grutzeck, PSU, K.

Mather, WES; September 1980

108.4/JER/82/04/22/0 ONWI-199 Rheological Properties of Fresh Cement Repository Sealing Applications:

Effects of Superplasticizers, Mixing Procedures and Tines; D.M. Roy, K Asaga, PSU; 1980 (draft)

OECD/00E/0NWI International Workshop on Borehole and Shaft Plugging, Colum'us, Ohio, May 7-9, 1980 o

ONWI-201 Longevity of Borehole and Shaft Sealing Materials:

I Thermodynamic Properties of Cements and Related Phases, September 1980 (draft)

ONWI-202 Longevity of Borehole and Shaft Sealing Materials: II Characterization of Cement Based Ancient Building Materials; 1980 (draft)

SAND-80-1375 The Bell Canyon Test Summary Report; C.L.

~

Christensen, F.W. Peterson, Sandia Labs; April 1981 SL-79-16 Examination of Grout and Rock From DuVal Mine, New Mexico; A.D. Buck, J.P. Burkes, WES; July 1979 ONWI-246 Examination of Samples of Bell Canyon Test 1-FF Grout; J.E.Rhoderick, G.S. Wong, A.D. Buck, WES; May 1981 ONWI-247 Examination of Simulated Borehole Specimens; J.E. Rhoderick, A.D. Buck; May 1981 ONWI-248 Examination of Sample of Grout After 63 Years Exposure Underground; J.E. Rhoderick; May 1981 i

0NWI-249 Study of a Proprietary Pozzolanic Product; A.D.

I Buck; May 1981 SL-81-20 Examination of ERDA-10 Grout Speciments at Different Ages; A.D. Buck, J.P. Burkes, J.E.

Rhoderick; August 1981

108.4/JER/82/04/22/0 C-78-1 Borehole Plugging Program (Waste Disposal),

Report 2, Petrographic Examination of Several Four-Year-Old Laboratory Developed Grout Mixtures; J.E. Rhoderick, A.D. Buck, September 1981 SL-81-34 Composition of Rock Core From Hole AEC-8 New Mexico; J.E. Rhoderick, A.D. Buck; December 1981 ONWI-255 Sealing Considerations for Repository Shafts in Bedded and Dome Salt; D'Appolonia, December 1981 ONWI-324 PSU/WES Interlaboratory Study of An Experimental Repository Seal Material; D.M. Roy, M.W. Grutzeck, K. Mather, A.D. Buck; September 1981 ONWI-325 Experimental Studies of Seal Materials for Potential Use in a Los Medanos - Types Bedded Salt Repository; L.D. Wakeley, D.M. Roy, M.W.

Grutzeck; September 1981 Geotechnical Services for Repository Sealing -

FY 81 Sunnary Report; D' Appolonia; (draft) 1 t

--