APPENDIX A l
EMERGENCY PREPAREDNESS DEFICIENCIES n
Based on the results of the NRC's appraisal of the V. C. Sunrner Nuclear Station Energency Preparedness Program, conducted June 8-17, 1981, the following deficiencies were identified.
(References are to Sections in 0IE Report No. 50-395/81-12 and the related standard of 10 CFR 50.47).
1.
Augmentation of Onsite Emergency Organization (Section 2.2; 50.47(b)(2)):
i The areas of authority and responsibility for both the Offsite Emergency Coordinator and the Emergency Director were not clearly defined.
2.
Emergency Alarm and Abnormal Occurrence Procedures (Section 5.2; 50.47(b)(4)):
i The Emergency Operating Procedures did not, in all cases, initiate actions required by the Emergency Plan and Emergency Plan Procedures.
i.
i a
8205270 37/
I 4
v-~--
,re,,-..,,.--,----.
-w,-
-,-w-n
-.,.,.,,,,,, -, ~.,.. -,
,_.a.._.w.,
T7.MpfM.;?T-75%%Q'8 +W H"M7
~"
I'"i"
+if
'OfC51 4 W 5.,
u y, ~ y p C ~.
~
.j-r APPENDIX B PREPAREDNESS IMPROVEMENT ITEMS Based on the results of the NRC's appraisal of the V. C. Sununer Nuclear i
Station Emergency Preparedness Program conducted June 8-17, 1981, the following items should be considered for improvement.
(References are to Section in 0IE Report No. 50-395/81-12.)
1.
Reviewing and revising as necessary, Appendix B of the Emergency Plan to ensure that the list of emergencf equipment and supplies is current.
(4.2.1.1) 2.
Revising interim procedure EPP-019, Attachments III and VIII to reflect the operability checks performed on the instruments in the Offsite Holding Area Energency Kits.
(4.2.1.1) i 3.
Evaluating extremity dosimetry requirenents for re-entry teams and providing l
dosineters in the appropriate kits.
(4.2.1.1) l 4.
Providing for a central location for collecting survey records.
(5.4.2.1) 5.
Providing for periodic audits of the emergency preparedness program at least every 12 months.
(5.5.4)
J
-+
-, ~ -,
a rr
-- ~
m.
,,n-
--,g
n DEC 2 41981 APPENDIX C PREPARE 0 NESS AREAS PENDING APPLICANT COMPLETION Based on the results of the NRC's appraisal of the V. C. Summer Nuclear Station Emergency Preparedness Program conducted June 8-17, 1981, the following areas were, at the time of the appraisal, incomplete with respect to development or implementation and, therefore, findings related to the adequacy of these areas could not be made.
(References are to sections in 0IE Report No.
50-395/81-12).
1.
Onsite emergency organization (2.1) 2.
Emergency Plan training / retraining program established. (3.1) 3.
Emergency Plan training / retraining program implemented. (3.2) 4.
Post-accident primary coolant sampling and analysis. (4.1.1.5) 5.
Post-accident containment air sampling and analysis. (4.1.1.6) 6.
Post-accident gas and particulate effluent sampling and analysis.
(4.1.1.7) 7.
Post-accident liquid effluent sampling and analysis. (4.1.1.8) 8.
Assembly / Reassembly areas. (4.1.2.1) 9.
Decontamination Facilities. (4.1.2.3) 10.
Emergency kits and emergency survey instrumentation. (4.2.1.1) 11.
Area and process radiation monitors. (4.2.1.2) 12.
Non-radiation process monitors. (4.2.1.3) 13.
Meteorological Instrumentation. (4.2.1.4) 14.
Emergency communications equipment. (4.2.3) 15.
Emergency procedures; general form and content. (5.1) i 16.
Implementing Instructions. (5.3) 17.
Implementing procedures. (5.4) 18.
Supplementary procedures. (5.5) 19.
Coordination with general public. (6.2) 20.
Drills and exercises; program implementation. (7.1) 21.
Walk-through observations. (7.2) i t