ML20053A147
Jump to navigation
Jump to search
| ML20053A147 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/01/1981 |
| From: | Hairston W ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20053A144 | List: |
| References | |
| NUDOCS 8205250019 | |
| Download: ML20053A147 (1) | |
Text
.
OPERATING DATA REPORT
.../
DOCKET NO. 50-348 DAIL 10/01/81 COMPLETED HY W.G. Hairston, III TELEPilONE (205) T97-5156 Ol' ERA llNG STA I US N"
- 1. thiit Name: Joseph M.
Farley - Un it 1
- 1) Cumulative data
- 2. Reporting Penod: _Sep tembe r. 1981 since 12/01/77, date of
- 3. Licemed 1 hernui Power (SlWil:
2652 commercial operation.
- 4. Nameplate Rating IGrow MWe):
860
- 5. Design I.lectrical Rating (Net MWe): 829
- 6. Masimum Dependable Capacity IGross MWe): 844.6
- 7. Masimum Dependable Capacity (Net MWel:
803.6
- 8. Il Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Gise Reasom:
N/A
- 9. Pouct Lesel To hhich Restricted,if Any (Net MWe):
N/A
- 10. Reasom For Restrictiom. lf Any:
N/A lhis Month Yr.-to-Date Cumulatise
- 11. ilours in Reporting Period 720 6.551 33.599
- 12. Number OfIlours Reactor Was Critical 214,7 3,799.5 20.981.8
- 13. Iteactor Resene Shutdown lionrs 283.1 657.2 3,104.0
- 14. Ilours Generator On-l.ine 211.7 3,626.3 20,329.7
- 15. Unit Resene Shutdown Hours 0
0 0
- 16. Grow thermal Energy Generated (MWil) 552.775.8
_S.955.018.7 50.944.910.5 17 Grow Electrical Energy Generated IMWill 170.048
- 2.817.544 16_236.952 IS. Net Liectrical Energy Generated IMWill 154,734
_2.629.164 15.236.914
- 19. Unit Senice Factor 29.4 55.4 60.5
- 20. Unit Availability Factor 29.4 55.4 60.5
- 21. Unit Capacity Factor iUsim: MDC Net) 26.7 50.0 56.4
- 22. Unit Capacity Factor (Using DER Net) 25.9 48.4 54.7
- 23. Unit Fmced Outace Rate 70.6 18.6
- 9. 3 l
- 24. Shutdown Scheduled User Nest 6 Months IIype, Date,and Duration of Eacht:
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
1/06/82
- 26. Units in lest Status tPrior 1o Commercial Operation):
Forecast Achiesed INill A L CRillC A LIIY 8/06/77 8/09/77 h'
INillAL eel C1RICITY 8/20/77 8/1R/77 COMMERCI AI. OPER A llON 12/01/77 12/01/77
- Decision to refuel the reactor earlier than the scheduled date was made 9/22/81 at 0700.
gg 8205250019 820513 PDR ADOCK 05000348 R
.