ML20053A147

From kanterella
Jump to navigation Jump to search
Revised Monthly Operating Rept for Sept 1981
ML20053A147
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/01/1981
From: Hairston W
ALABAMA POWER CO.
To:
Shared Package
ML20053A144 List:
References
NUDOCS 8205250019
Download: ML20053A147 (1)


Text

.

OPERATING DATA REPORT

.../

DOCKET NO. 50-348 DAIL 10/01/81 COMPLETED HY W.G. Hairston, III TELEPilONE (205) T97-5156 Ol' ERA llNG STA I US N"

1. thiit Name: Joseph M.

Farley - Un it 1

1) Cumulative data
2. Reporting Penod: _Sep tembe r. 1981 since 12/01/77, date of
3. Licemed 1 hernui Power (SlWil:

2652 commercial operation.

4. Nameplate Rating IGrow MWe):

860

5. Design I.lectrical Rating (Net MWe): 829
6. Masimum Dependable Capacity IGross MWe): 844.6
7. Masimum Dependable Capacity (Net MWel:

803.6

8. Il Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report, Gise Reasom:

N/A

9. Pouct Lesel To hhich Restricted,if Any (Net MWe):

N/A

10. Reasom For Restrictiom. lf Any:

N/A lhis Month Yr.-to-Date Cumulatise

11. ilours in Reporting Period 720 6.551 33.599
12. Number OfIlours Reactor Was Critical 214,7 3,799.5 20.981.8
  • 13. Iteactor Resene Shutdown lionrs 283.1 657.2 3,104.0
14. Ilours Generator On-l.ine 211.7 3,626.3 20,329.7
15. Unit Resene Shutdown Hours 0

0 0

16. Grow thermal Energy Generated (MWil) 552.775.8

_S.955.018.7 50.944.910.5 17 Grow Electrical Energy Generated IMWill 170.048

- 2.817.544 16_236.952 IS. Net Liectrical Energy Generated IMWill 154,734

_2.629.164 15.236.914

19. Unit Senice Factor 29.4 55.4 60.5
20. Unit Availability Factor 29.4 55.4 60.5
21. Unit Capacity Factor iUsim: MDC Net) 26.7 50.0 56.4
22. Unit Capacity Factor (Using DER Net) 25.9 48.4 54.7
23. Unit Fmced Outace Rate 70.6 18.6
9. 3 l
24. Shutdown Scheduled User Nest 6 Months IIype, Date,and Duration of Eacht:

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

1/06/82

26. Units in lest Status tPrior 1o Commercial Operation):

Forecast Achiesed INill A L CRillC A LIIY 8/06/77 8/09/77 h'

INillAL eel C1RICITY 8/20/77 8/1R/77 COMMERCI AI. OPER A llON 12/01/77 12/01/77

  • Decision to refuel the reactor earlier than the scheduled date was made 9/22/81 at 0700.

gg 8205250019 820513 PDR ADOCK 05000348 R

PDR

.