Interim Significant Deficiency Rept 54 Re Laminations in Uninstalled Pieces of Tube Steel HT-16600.Sections Ultrasonically Tested & Corrective Actions Being Determined. Final Status Rept Will Be Submitted by 820625
ML20052H899
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/11/1982
From: Debruin J, Gutierrez J, Hart J, Mclendon G, Milhiser R, Wills J
LOUISIANA POWER & LIGHT CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, Q-3-A35.07.54, W3K-82-0271, W3K-82-271, NUDOCS 8205240155
Download: ML20052H899 (3)


Text

.

s 142 DELARONDE STREET P O W E R & L1 G H T! e O box 6008

  • NEW ORLEANS. LOUISIANA 70174 * (504) 366 2345 9

{IrI0Iss0Y$

May 11, 1982 G D. McLENDON Senior Vice President W3K-82-0271 Q-3-A35.07.54 p ._ _

Mr. John T. Collins, Regional Administrator, Region IV U. S. Nuclear Regulatory Commission

'~

,l

.]ll 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 l

NN@ l

SUBJECT:

Waterford SES Unit No. 3

' O Docket No. 50-382 'D N Interim Report of Significant Construction Deficiency No. 54

" Tube Steel (HT 16600) Laminations"

Reference:

Telecon - L. L. Bass (LP&L) to L. Fbrtin (NRC) on 4/2/82

Dear Mr. Collins:

In accordance with the requirements of 10CFR50.55(e), we are hereby providing two copies of the Interim Report of Significant Construction Deficiency No. 54, "Tabe Steel (HT 16600) Laminations."

If you have any questions, please advise.

Very truly yours, AJu '

GDMcL/LLB/grf Attachment cc: 1) Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 (with 15 copies of report)

2) Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C. 20555 (with 1 copy of report) f 61 (

, 8205240155 820511

! PDR ADOCK 05000382 S PDR

O o

LOUISIANA POWER & LICilT COMPANY WATERFORD SES UNIT NO. 3 INTERIM REPORT OF SIGNIFICANT CONSTRUCTION DEFICIENCY No. 54 TUBE STEEL (IIT 16600) LAMINATIONS Reviewed by N, d /0 3 R. J. Pfillyiser - Site Manager ' Date Reviewed by I/d M JJ L". W' ills - ect Superintendent / /D ate Reviewed by # (M 3 '/d ' b J yffart - Project L M nsing" Engineer Date Reviewed by d [h M 7/s EL J.[p6 Bruin - ESS Project Engineer / / Date Reviewed by b 'N J[Gutieftez-Q.A.S[eSupervisor Date May 10, 1982

INTERIM REPORT SIGNIFICANT CONSTRUCTION DEFICIENCY No. 54

- TUBE STEEL.(HT 16600) LAMINATIONS"

_ INTRODUCTION This report is submitted pursuant to 10CFR50.55(e) . It describes a condition discovered on material (Tube Steel HT-16600) and specifically identifies ob-vious laminations observed on uninstalled pieces. This problem is considered:

reportable under the requirements of 10CFR50.55(e). To.the best of our know-ledge, this problem has not been identified to the Nuclear Regulatory Commis-sion pursuant to 10CFR21.

DESCRIPTION Mercury Company of. Norwood, Inc. , through issuance of Nonconformance Report W3-3304, identified that a section of tube steel fabricated from Heat Number 16600 had laminations. Eighty (80) feet of tube steel was utilized by Mercury in installations of seven (7) supports for the Steam Generator System. Also, Tompkins-bcckwith. Inc., utilized one hundred sixty (160) feet of this tube steel in the fabrication of twenty-six (26) hangers for the following systems:

Waste Management,- Chemical and Volume, Reactor Cooling, Safety Injection, Chilled Water, Component Cooling,'and Valve Supports. Approximately eighty-(80) feet of this steel has not yet been identified, and currently a search is being made to locate the remaining eighty (80) feet. This material was procured under Purchase Order Number WP3-5908 and supplied by Mills Alloy Co., Twainsburg, Ohio.

SAFETY IMPLICATIONS The extent of potential impact on safety-related systems is pending review of additional information as described below by Ebasco Site Support Engineering (ESSE).

CORRECTIVE ACTION-

. Subcontractors Mercury Company of Norwood, . Inc. , and Tompkins-Beckwith, Inc. ,

have been instructed to identify usage of all material as related~to original purchase order. A special transducer has been procured, and three (3) twenty-foot lengths of tube steel, Heat No.16600, have been ultrasonically tested to determine the characteristics of~the. laminar indications. ESSE is now in the process of determining what corrective action is to be initiated in order to resolve all deficiencies. It is estimated that an Interim Status Report based on these actions will be submitted to the USNRC by June 25, 1982.