ML20052H840

From kanterella
Jump to navigation Jump to search
Notice of Receipt of Coalition for Safe Power 820317 Petition for Order to Show Cause Why CPs Should Not Be Revoked
ML20052H840
Person / Time
Site: Satsop, Washington Public Power Supply System
Issue date: 04/19/1982
From: Harold Denton
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20052H839 List:
References
NUDOCS 8205240050
Download: ML20052H840 (3)


Text

-

g 5

NUCLEAR REGULATORY C0hMISS10N

[ Docket Nos. 50-513 & S0-509]

WASHIflGT0fl PUBLIC POWER SUPPLY SYSTEM (WPPSS Huclear Project Nos. 4 & 5)

Receipt of Petition Under 10 CFR 2.206 ilotice is hereby given that by petition dated March 17, 1982, the Coalition for Safe Pwer, Portland Oregon, has requested pursuant to 10 CFR 2.206 that the Director of Nuclear Reactor Regulation order the Washington Power Supply System (WPPSS) to show cause why the construction permits for its Huclear Project hos. 4 and 5 should not be revoked. The Coalition believes such action is appropriate in view of WPPSS's decision to terminate construction of the projects. As pro-vided in 10 CFR 2.206, appropriate action will be taken on the petition within a reasonable tine.

Copies of the petition are available for public inspection in the Comis-sion's public document room at 1717 H Street, it.W., Washington, D. C., and in the local public document roops at the Richland Public Library, Swif t and Northgate Streets, Richland, WA 99352 and the W. H. Abel Memorial Library,125 Main Street, South, Montesano, WA 98563.

Dated at Bethesda, Maryland, "is 19th day of April 1982.

FOR THE NUCLEAR REGULATORY COM11SS10H Original sped by

, H. R. Denton Harold H. Denton, Director Office of Nuclear Reactor Regulation DIR/NRR B205240050 020419 PDR ADOCK 05000509 HR on 0

PDR x.

4 / s'1R2 nh 1

^

..RHe/,P,,kN',

,LA,:Dgy,,f,4,

,,, g,B,,g,4,,,,,0.i f

,L,,,

l -- (

DL M omer >

rnan

-n in E

.MDuncan.... \\... Menan....&.1.E.ag,1. ta.

..s c.o,,,

,,,,1,se n,h u t,,

,,,,,,,s e,,,,,,,,,

sua== >..g,b.......Amc

.UCla2...............4Llp.h,2....

. 4/.0/82,,,,,,, 4f /82,,,,

,4/(,@,82

,/f,/82 4

.4

[12.....

one>

MC FORM 318 (10-80) MCM Cao OFFICIAL RECORD COPY usc e seei.m. sea

(

+.

p '.

f FROM:,

.e i,CTION CONTROL DATES-CONTROL NO Nina' Bel'1'-

COMPL oE^ounc 4/13/82 11683

~

I Coalition For Safe Power -

ACxNOwtEoGuCNT DATE OF DOCUMENT l

INTERluREety-3/17/82 i

f TO:

PREPARE FOR SIGNATURE I

.Denton frtNAL REPLY CHAIRMAN FILE LOCATION O EXECUTIVE DIRECTOR OTHER:

Omntrnn D ESCRIPTION - O LETTER OMEMO O REPORr O OTHER SPECI AL INSTRUCT!ONS OR REMARKS 2.206 - Show Cause Petition regarding t-Washington-Public Power Supply System

. Projects 4 & 5

~

Ct.ASSIFIED DATA OOCUMENT/ COPY NO.

CLASSIFICATION l NUMHER OF PAGES CATEGORY POSTAL REGISTRY NO-0 NS: O Ro O rno ASSIGNED TO:

-DATE INFORMATION ROUTING LEG AL REVIEW E FINAL O COPY

_quitninaham ELD 3/23/s2.

Denton

~

" IFY ASSIGNED TO:

DATE NO uGAL OBJECTIONS i

__Eisenhut 3/30/82 Case 0E Wdem 1.

PPAS 5 Thomison exr.

b_

2.

llanauer 6.

CicCk COMME NTS. NOTIFY:

_- m.

/QVlN/M Jf4/

3.

Mattson 7.

Snyder EXT._

k l[

g

ynji, JCAE NOTIFICATION RECOMMENDED:

0 YES O NO NRCU RM 232 EXECUTIV E DIRECTOFlfgER ATIONS

DO NOT REMOVE TH/S COPY PRINCIPAL CORRESPONDENCE CONTROL

(

b 1

t i

b F

4

t

-)

f" t

s ",,-

t_..

A_,

d PL' EASE kEVIEW Tile DUE DATE UNEDI ATELY If the due date does not allow adequate i

time to respond to this ticket, you may request a revised due date. The request must include a valid justification and be submitted through your correspondence coordinator to the NRR mail room. Such request for green tickets must be made withii 3 days after assignment. Requests for re-vision of yellow ticket due dates may be made, with justification, through the weekly WITS update.

The revised due date, if approved by PPAS, will be used to track division correspondene.

...,_.y

.. _ -.-,s completion schedules. [All green. tickets are

._.-.,~~,~~-+.--me

-,,. ~ _ -

[due.;to? Mr. :. Case /via = NRR mail -room two daysf

.._..., - ; ~ ~ ~ g 1

9be'foretheRDO-stated-due'date.

l 1

6 t

i l-.

9'.

-