ML20052H570

From kanterella
Jump to navigation Jump to search
Forwards 820430 Ltr to Ny Dept of Environ Conservation W/ Proposed Aquatic Monitoring Plan to Aid NRC Evaluation of Util 820201 Proposed Environ Protection Plan
ML20052H570
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 05/11/1982
From: James Smith
LONG ISLAND LIGHTING CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20052H571 List:
References
SNRC-701, NUDOCS 8205210227
Download: ML20052H570 (3)


Text

!

d e

,a. . - - , . -

LONG ISLAND LIGHTING COM PANY FLC'O SHOREHAM NUCLEAR POWER STATION

_ ~

~ , P.O. BOX 618, NORTH CC'/NTRY ROAD + WADING RIVER, N.Y.11792 May 11, 1982 SNRC-701 Mr. liarold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322

Dear Mr. Denton:

Enclosed is one copy of LILCO's transmittal to the New York Department of Environmental Conservation containing the proposed aquatic monitoring plan for Shoreham Nuclear Power Station - Unit 1.

This copy is provided for your information as prescribed in Section 3.2 of LILCO's proposed Environmental Protection Plan, submitted to the NRC on February 1, 1982, and to assist in the staffs evaluation of that document.

Should you require any additional information, please contact this office.

Very truly yours, mv' J. L. Smith Manager, Special Projects Shoreham Nuclear Power Station RWG:mp cc: J. liiggins C. Billups All parties dd 0 i l 8205210227 920511 PDR ADOCK 05000322 A PDR FC 8935

I

{gg LONG ISLAND LIGHTING COM PANY 175 EAST OLD COU N TRY ROAD H 4C M SVI L LE. NEW YORK 11801 Direct Dial Number April 30, 1982 Mr. William L. Garvey, P.E.

Chief, Permit Administrative Section Division of Water Department of Environmental Conservation 50 Wolf Road Albany, New York 12233 Shoreham Nuclear Power Station SPDES Permit No. NY0026344

Dear Mr. Garvey:

Please find enclosed LILCO's proposed aquatic monitoring plan for the Shoreham Nuclear Power Station-Unit 1. This plan is submitted in fulfillment of Requirement No. 5 of Part I of the SPDES permit for this facility.

You will note that the plan encompasses three major areas of monitoring:

1) A continuation of the on-going preoperational aquatic monitoring program (which is now in its sixth year of sampling). Annual reports documenting results of the preoperational program have been issued for the years 1977-1981, inclusive. This program, which will be entitled the Offshore Aquatic Monitoring Program (OSAMP),

is designed to assess any thermal effects of plant operation.

2) A new program to monitor and determine abundance and survival of echthyoplankton entrained into the plands circulating water system. This will be termed the Entrainment Monitoring Program (EMP) .
3) A new program to determine abundance and survival of fish impinged upon the plant's travelling water screens.

This program will La termed the Impingement Monitoring Program (IMP).

n _ . __ -. - -

t

, i' Mr. William L. Garvey, P.E.  !

April 30, 1982 l Page 2 '

The sampling plan will be implemented on a sch'edule determined by the plant's operation date. The proposed schedule is based

---~-on information available as of this date and is subject to modification as updated plant schedules are announced.

If you have any questions or suggestions concerning the content, intent or scheduling of the biological monitoring plan, please contact Mr. A. Christopher Gross on (516) 733-4103 or at the above address.

Very truly yours,

/

DRIGINAl. SIGNED BY Ac 6 Raymond J. Driscoll, P.E.

Manager Environmental Engineering Dept.

ACG/cg cc: Messrs. A. Taormina DEC (Stony Brook)

D. Fallon R. Baker EPA (Region II) bcc: Messrs. J. Rivello R. C. Richards J. J. Kearney W. E. Faraday S . V. Dalton Env. Eng. File Eng. File A39.103, W.O. 44430 SR2/A39.103 i

I l

l l

l