ML20052H452

From kanterella
Jump to navigation Jump to search
Forwards Reactor & Structural Sys Analysis for Crbr Licensing, Review of Status of Crbr Licensing Technical Issues Re Heat Removal Sys & Severe Accident Analysis & Lasl Re TMI Action Items.W/O Encl
ML20052H452
Person / Time
Site: Clinch River
Issue date: 05/20/1982
From: Swanson D
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Hand C, Linenberger G, Mark Miller
Atomic Safety and Licensing Board Panel
References
NUDOCS 8205210072
Download: ML20052H452 (2)


Text

c....

[g/ nog'o DESICNAfg g gy UNITED STATES

g NUCLEAR REGULATORY COMMISIltIf8ff ed (h

['

g 1 E WASHINGTON, D, C. 20555 d

p

,/

U So 7

~

May 20, 1982 Marshall Miller, Esq., Chairman Mr. Gustave A. Linenberger Administrative Judge Administrative Judge r

Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Comission Washington, D.C.

20555 Washington, D.C.

20555 Dr. Cadet H. Hand, Jr., Director Administrative Judge Bodega Marine Laboratory University of California P.O. Box 247 Bodega Bay, California 94923 In the Matter of UNITED STATES DEPARTMENT OF ENERGY PROJECT MANAGEMENT CORPORATION TENNESSEE VALLEY AUTHORITY (Clinch River Breeder Reactor Plant)

Docket No. 50-537

Dear Administrative Judges:

Enclosed is a copy of each of the three final reports prepared by contractors to the Staff which were sent to NRDC, et al. via my letter to Ellyn Weiss dated May 13, 1982 in response to NRDC, et al's 24th set of interrogatories and request for documents to the Staff. Since sufficient copies were not available at that time, the Board and Applicants did not receive their copies of these reports as enclosures to my letter to ils. Weiss.

Consistent with our previous practice, and because of the great bulk of materials provided, the Staff is sending only one copy of documents provided through discovery to the Chairman of the Board, with copies of the transmit-tal letter only being sent to the other Board members. The reports enclosed are entitled:

1.

Reactor and Structural systems Analysis for CRBR Licensing by Los Alamos National Laboratory (January 1982);

2.

Le.tter dated December 18, 1981 from E. Barts of LASL to B. Morris of the Staff with six attachments relating to the issue of the applicability of TMI action plan requirements to CRBR and LMFBRs; and lOf 8205210072 820520 PDR ADOCK 05000537 5

0 PDR

3.

Review of the Status of CRBR Licensing Technical Issues Related to Heat Removal System and Severe Accident Analysis by BNL dated November, 1981.

Sincerely, Daniel T. Swanson Counsel for NRC Staff cc w/ enc 1:

G. Edgar 4

cc w/o encl: rest of service list i

0FC :0 ELD /7sf :0 ELD f=

j

,g NAME :DSwanson/kt :SATr,M,y DATE :5//f/82

5/h /82 v.-..,

r

.-