Responds to NRC Re Violations Noted in IE Insp Repts 50-282/82-04 & 50-306/82-04.Corrective Actions: Corporate Level Directive 3ACD 4.1 Will Be Revised to Delete 3 Month Closeout of Design Changes
ML20052H233
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 04/27/1982
From: Gilberts D
NORTHERN STATES POWER CO.
To: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20052H231 List:
References
NUDOCS 8205200090
Download: ML20052H233 (3)


Text

.,

Northern States Power Company T

J_

414 Nicollet Malt D. E. Gilberts Minneasohs, Minnesota 55401 Senior V6ce Prealdent Telephone (612) 330-6071 Power supply April 27, 1982

.Mr J F Streeter, Chief Projects Branch 2 Region III Office of Inspection and Enforcement U S Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Dear Mr Streeter:

PRAIRIE ISLAND NUCLEAR CENERATING PLANT Docket Nos. 50-282 and 50-306 In response to your letter of March 29, 1982 which transmitted Inspection Reports ~ 50-282/82-04 and 50-306/82-04, the following is offered:

Violation 10 CFR 50, Appendix B, Criterion V states in part: " Activities affecting quality shall be prescribed by documented. instructions, procedures.

and shall be accomplished in accordance with these instructions, procedures or drawings. Administrative Control Directive 3ACD 4.1, as implemented by SACD 6.1, Design Change Control, requires that design changes be closed out three months after installation.

This is a Severity Level VI violation (Supplement 1).

Response

Design Changes 80Y105, 80Y109 and 80Y129 were not close_d out (i.e., associated final drawings updated and distributed) within 3 months after installation as identified in the Notice of Violation.

The referenced design changes were associated with Dil related modifications which were installed and turned over to Operations during the last quarter of 1981. Failure to close out the design changes in the specified time period was caused by delays in updating the " final" as-built drawings.

NSP believes that the failure to close out a design change within three months following installation (i.e., drawings) is not a safety concern because a

" construction" as-built drawing file consisting of flow and logic drawings has been established and is being maintained in the Control Room. The construction file contains the pertinent' updated information (i.e., drawings) necessary for the Control Room to safely and efficiently operate the facility, i

I 8205200090 820517

[RADOCK 05000282

~APR 20 N PDR

Mr Streeter April 27, 1982 To prevent reoccurence, the Corporate Level Directive, 3ACD 4.1, will be revised to delete the 3 month close out of design changes following installa-tion and will include measures to ensure that marked-up, as-built drawings (logic and flove) are incorporated into the construction file following in-sta11ation of a design change.

NSP will close out the referenced design changes and issue a new revision to 3ACD 4.1 by June 30, 1982.

Yours truly, b

D E Gilberts Senior Vice President Power Supply cc: G Charnoff C D Feierabend J

x

UNITED STATES NUCLE *R REGULATORY CORMISSION NORTilERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR CENERATING PLANT Docket No. 50-282 50-306 LETTER DATED APRIL 27, 1982 RESPONDING TO NRC LETTER DATED MARCH 29, 1982 Inspection Report Nos. 50-282/82-04 and 50-306/82-04 Northern States Power Company, a Minnesota corporation, by this letter dated April 27, 1982 hereby submits, in response to the NRC letter dated March 29, 1982, our answer to Inspection Repot Nos. 50-282/82-04 and 50-306/82-04.

This request contains no restricted or other defense information.

NORTHERN STATES POWER COIPANY By:

W D E Gilberts Senior Vice President Power Supply on this 87 day of

/

19 [M before me a notary public in and/ for said County, persondlly appeared D E Gilberts, Senior Vice President Power Supply, and being first duly sworn acknowledged that he is authorized to execute this document cn behalf of Northern States Power Company, that he knows the contents thereof, and that to the best of his knowledge, information and belief, the statements made in it are true and that it is not interposed for delay.