ML20052G953
| ML20052G953 | |
| Person / Time | |
|---|---|
| Site: | FitzPatrick |
| Issue date: | 05/07/1982 |
| From: | Bayne J POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK |
| To: | Vassallo D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.03, TASK-TM JPN-82-42, NUDOCS 8205190182 | |
| Download: ML20052G953 (2) | |
Text
,.'
POWER AUTHORITY OF THE STATE OF NEW YORK 10 COLUMBUS CIRCLE NEW YORK. N. Y. too19 (2121 397.6200 G EO RG,E,,7, BERRY p
OPE R A TING OFFICER TRUSTEES
" " Oc" *.'. "
",'lRf'E,'c"l"""""
GEORGE L. ING ALLS vac E cualR as a m JOSEPH R C IEDER
,,Eg o, Ear <
.E-R R ICs A M o.,Lv ~ ~
ROBERT l MILLONZI LEROY W. SINCLAIR SENIOR V IC E PRESIDENT
, R E D E ' llc K R. CLARK 82 g,c,qEl,,r i a a **ci a'
' " * ". * *, " ',"ll.R E...E ~,
& GlihERak COWhSEL Directory of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C.
2005d Attention:
Mr. Domenic B. Vassallo Operating Reactors Branch No. 2 Division of Licensing
Subject:
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Safety and Relief Valve Failures and Challenges NUREG-0737 Item II.K.3.3.
Reference:
- 1. PASNY letter, J.P. Bayne to T. A. Ippolito, dated January 8, 1981 (JPN-81-5)
Dear Sir:
NUREG-0737 Item II.K.3.3. requested that challenges to safety and relief valves (SRV's) be reported on an annual basis, with data accumulation begin-ning on April 1, 1980..In Reference 1, the Power Authority subaitted a A
/
gDYb report on challerges occurring between April 1 and December 31, 1980.
.t Reference 2 provided a report of challenges whub occurred between January 1 and December 31, 1981. 'Ihis letter proviu additional clarifi-fg cation of the information in that report and supercedes Reference 2 in its entirety.
Between Jc.nuary 1 and December 31, 1981, the SRV's were challeuJed on only one occasion. On January 17, during a transient resulting in a reactor scram, the A, B, H and K valves were manually cycled one time each.
8205190182 820507 PDR ADOCK 05000333 P
..-O During this same transient, the G valve failed to open in response to a manual actuation signal. '1he NRC was notified of this failure in Licensee -
Event Report No. 81-001/01T-0. This LER describes the failure of the G valve and the subsequent inspection of all SRV's.
No other SRV challenges or failures occurred in 1981. Future chal-lenges and failures will be reported on an annual basis. If you have any further questions, please contact Mr. J. A. Gray, Jr. of my staff.
Very truly yours, 1
\\
'd.
. Bayne j
io Vice President Nuc ar Generation u
cc: Mr..J. Linville Resident Inspector U.S.141 clear Regulatory Comission P. O. Box 136 Lycoming, New York 13093 Mr. Ron Barton United Engineers & Constructors, Inc.
30 S. 17th Street Philadelphia, Pa. 19101