Discusses Challenges to Safety & Relief Valves in 1981 Per NUREG-0737,Item II.K.3.3.Valves Were Challenged on 810117 During Transient Resulting in Reactor Scram.Valve G Failed to Open During Manual Actuation Signal
ML20052G953
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 05/07/1982
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.03, TASK-TM JPN-82-42, NUDOCS 8205190182
Download: ML20052G953 (2)


Text

,.'

POWER AUTHORITY OF THE STATE OF NEW YORK 10 COLUMBUS CIRCLE NEW YORK. N. Y. too19 (2121 397.6200 G EO RG,E,,7, BERRY p

OPE R A TING OFFICER TRUSTEES

" " Oc" *.'. "

",'lRf'E,'c"l"""""

GEORGE L. ING ALLS vac E cualR as a m JOSEPH R C IEDER

,,Eg o, Ear <

.E-R R ICs A M o.,Lv ~ ~

ROBERT l MILLONZI LEROY W. SINCLAIR SENIOR V IC E PRESIDENT

, R E D E ' llc K R. CLARK 82 g,c,qEl,,r i a a **ci a'

' " * ". * *, " ',"ll.R E...E ~,

& GlihERak COWhSEL Directory of Nuclear Reactor Regulation U.S. Nuclear Regulatory Comission Washington, D.C.

2005d Attention:

Mr. Domenic B. Vassallo Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Safety and Relief Valve Failures and Challenges NUREG-0737 Item II.K.3.3.

Reference:

1. PASNY letter, J.P. Bayne to T. A. Ippolito, dated January 8, 1981 (JPN-81-5)
2. PASNY letter, J.P. Bayne to D. B. Vassallo, dated April 13, 1982 (JPN-82-37 )

Dear Sir:

NUREG-0737 Item II.K.3.3. requested that challenges to safety and relief valves (SRV's) be reported on an annual basis, with data accumulation begin-ning on April 1, 1980..In Reference 1, the Power Authority subaitted a A

/

gDYb report on challerges occurring between April 1 and December 31, 1980.

.t Reference 2 provided a report of challenges whub occurred between January 1 and December 31, 1981. 'Ihis letter proviu additional clarifi-fg cation of the information in that report and supercedes Reference 2 in its entirety.

Between Jc.nuary 1 and December 31, 1981, the SRV's were challeuJed on only one occasion. On January 17, during a transient resulting in a reactor scram, the A, B, H and K valves were manually cycled one time each.

8205190182 820507 PDR ADOCK 05000333 P

PDR

..-O During this same transient, the G valve failed to open in response to a manual actuation signal. '1he NRC was notified of this failure in Licensee -

Event Report No. 81-001/01T-0. This LER describes the failure of the G valve and the subsequent inspection of all SRV's.

No other SRV challenges or failures occurred in 1981. Future chal-lenges and failures will be reported on an annual basis. If you have any further questions, please contact Mr. J. A. Gray, Jr. of my staff.

Very truly yours, 1

\\

'd.

. Bayne j

io Vice President Nuc ar Generation u

cc: Mr..J. Linville Resident Inspector U.S.141 clear Regulatory Comission P. O. Box 136 Lycoming, New York 13093 Mr. Ron Barton United Engineers & Constructors, Inc.