ML20052G903

From kanterella
Jump to navigation Jump to search
Forwards Rj Goddard Notice of Appearance,Pc Shemanski Prof Qualifications & F Clemenson,Rl Emch,I Sargent & Dj Vito Joint Testimony
ML20052G903
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 05/14/1982
From: Goddard R
NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
To: Bloch P, Paris O, Shon F
Atomic Safety and Licensing Board Panel
Shared Package
ML20052G904 List:
References
NUDOCS 8205190136
Download: ML20052G903 (4)


Text

Dm&/Mfff>f s!

DESIGNAT:'D ORIGINAL 9A% k g

~'

(/

OXo]

May 14, 1982..

Peter B. Bloch, Chairman Dr. Oscar H. Paris Administrative Judge Administrative Judge Atomic Safety and Licensing Board Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission U.S. Nuclear Regulatory Conmission Washington, DC 20555 Washington, DC 20555 l

Mr. Frederick J. Shon Administrative Judge U.S. Nuclear D gulatory Commission hO, y %.

Atomic Safety and Licensing Board Washington, DC 20555 In the Matter of CONSUMERS POWER COMPANY (Big Rock Point Plant)

(Spent Fuel Pool Modification)

Dear Administrative Judges:

Enclosed are the following documents:

1.

Notice of Appearance of Richard J. Goddard.

2.

Professional Qualifications of Paul C. Shemanski, whose, pre-filed written testimony was previously served on the Board and parties.

3.

Joint Testimony of:

Fred Clemenson Richard L. Emch Ian Sargent D. J. Vito Sincerely, r205190136 820514 Richard J. Goddard g5 D PDR ADOCK 05000155 Counsel for NRC Staff S

T PDR

Enclosures:

1 f as stated I

cc: Service List n')

! 0FC :0 ELD

+

0 ELD 4
_ __ _ _
_ _L. '

' ___ :-__f lNAME':RJGod ard/jh SATrbb lDATE :05/14/82 05/b 82

s s

UNITED STATES OF M ERICA NUCLEAR REGULATORY C0ttilSSION BEFORE THE ATOMIC SAFETY AND LICENSING. BOARD In the Matter of

)

CONSUMERS POWER COMPANY Docket No. 50-155 (Big Rock Point Plant)

)

(Spent Fuel Pool Modification)

NOTICE OF APPEARANCE Notice <is hereby given that the undersigned attorney herewith enters an appearance in the captioned matter.

In accordance with 5 2.713, 10 C.F.R. Part 2, the following information is provided:

Name Richard J. Goddard Address

- Office of the Executive Legal Director U.S. Nuclear Regulatory Comission Washington, D.C.

20555 Telephone Number

- Area Code 301-492-7417 Admissions

- Supreme Court for the State of Illinois Name-of Party

- NRC Staff U.S. Nuclear Regulatory Comission s

Washington, D.C.

20555 o

\\. LF QTyc 4r 01,

-s c

. "f ic'ard J. Goddard Counsel for NRC Staff Dated at Bethesda, Maryland l

this 1.4th fay of May, 1982

[

~

e, e

g P-W' f

S y

_. {

4

/

5 4

j Professional Qualifications Paul C. Shemanski My name is Paul Shemanski.

I am employed as a Senior klectrical Engineer in the Equipment Qualification Branch, Division of Engineering, U.S.

- Nuclear Regulatory Commission, Washington, D.C.

Education

~ '

B.S_. Electrical Engineering, Pennsylvania State University 1963; Graduate Studies, Electrical Engineering, George Washington University 1964/1965; MIT Reactor Safety Course; NRC Nuclear Engineering Course; NRC PWR/BWR Technology Courses; NRC BWR Simulator Course and NRC Radiation Safety Training Program.

Experience I joined the U.S. NRC in January 1975 as an Electrical Engineer and have performed licensing case reviews and reviews of licensed power reactors en the' operability and functional capability of safety-related instru-mentation and control systems and electrical equipment under noma 1, ebnormal and accident conditions.

I have held my present position in the Equipment Qualification Branch since June 1981, and serve as principal reviewer of the environmental qualification of electrical and mechanical equipment associated with systems that are essential to emergency reactor t

shutdown, containment isolation, reactor core cooling, containment and reactor heat removal and prevention of radioactive material to the environment.

Prioeto joining ths Commission I worked for the Chesapeake Instrument Corporation

. from 1969 through 1974 as manager of the Reliability Engineering Department.

s.

d

u,_

2-i From 1967 to 1969 I worked for Communicatidnsand Systems 'as a Member of the Technical Staff.

i t

From 1963 to 1966 I worked for ARINC Research and Vitro Laboratories as a reliability engineer.

i I

1 i

f t

i e

l l

?

[

I l

l l

,.,...,,