BOSTON EDISON COMPANY PILGRIM NI' CLEAR Poh'ER STATION -

Summary of Operations for _,

MARCH

,'1982' From March 1 to March 26, unit was shutdown for refueling outage. At 0507

-hours on March 26, the reactor was brought critical and plant heatup com-menced. Experienced increase in Relief Valve tail pipe temperatures and unit was brought sub-critical at 0553 hours0.0064 days <br />0.154 hours <br />9.143518e-4 weeks <br />2.104165e-4 months <br />. Discussed relief valve tail-pipe temperatures with vendor who recommended going to higher pressure.

Reactor was taken critical again at 1153' hours. At 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br />, RV-203-3A lifted at approximately 30 psig. The unit was immediately shutdown.

On March 27, after repairs to relief valves were completed, the reactor was taken critical-at 702 hours0.00813 days <br />0.195 hours <br />0.00116 weeks <br />2.67111e-4 months <br />. At 2115 hours0.0245 days <br />0.588 hours <br />0.0035 weeks <br />8.047575e-4 months <br />, a shutdown was initiated due to reactor water level-indication problems. Mode switch was placed in shut-down at 0412 hours0.00477 days <br />0.114 hours <br />6.812169e-4 weeks <br />1.56766e-4 months <br /> on March 28, 1982. The reactor was again brought. critical l,

.at 1652 hours0.0191 days <br />0.459 hours <br />0.00273 weeks <br />6.28586e-4 months <br /> on March 28, and a scram on high IRM's at 1944 hours0.0225 days <br />0.54 hours <br />0.00321 weeks <br />7.39692e-4 months <br /> occurred.

The reactor was brought critical at 0852 hours0.00986 days <br />0.237 hours <br />0.00141 weeks <br />3.24186e-4 months <br /> on March 29, and increased pressure to approximately 150 psig in order to test HPCI, RCIC and ADS.

On March 31, at 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br />, the reactor was at approximately 10% power-l awaiting a turbine generator roll.

Safety / Relief Valve Challenges for March, 1982 Report Requirement: TMI T.A.P.

II.K.33 i

Each relief valve was manually lifted once I

at 150#.

RV-203-3A lifted inadvertently at approxi-mately 30 psig on 3/26/82.

i l

l f

4 l

I i

s

(

8205140312 820413 PDR ADOCK 05000293 PDR R

O OPERATING DATA REPORT DOCKET NO.

50-293 DATE 04/13/82 COMPLETED BY G.G. Whitney TELEPHONE 617-746-7900 OPERATING STATUS Pilgrim I Notes

1. Udt Nm.

March, 1982

2. Reporting reriod:

1998.

3. L'.ensed Thermal Power (MWt):

678.

4. Nameplate Rating (Gross MWe):

655.

5. Design Electrical Rating (Net MWe):

690.

6. Maximum Dependable Capacity (Gross MWe):

670.

7. Maximum Dependable Capacity (Net MWe):

S. If Changes Occur in Capacity Ratings (Items Number-3 Through 7) Since Last Report. Give Reasons:

None None

9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions. If Any:

N/A This Month Yr..to.Dete Cumulative

11. Hours In Reporting Period 744.0 2160.0 81600.0 1
12. Number Of Hours Reactor Was Critical 74.2 74.2 56107.5
13. Reacrar Reserve Shutdown Hours 0.0 0.0 0.0
14. Hours Generator On.Line 0.0 0.0 54277.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 0.0 0.0 92817888.0
17. Gross Electrical Energy Generated (MWH) 0.0 0.0 30911234.0
18. Net Electrical Energy Generated (MWH) 0.0 0.0 29694484.0
19. Unit Service Factor 0.0 0.0 66.5 0.0 0.0 66.3
20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 54.3
22. Unit Capacity Factor (Using DER Net) 0.0 0.0 55.6
23. Unit Forced Outage Rate 0.0 0.0 10.0
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

~

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (4/77)

AVERAGE DAILY UNIT TOWER LEVEL 50-293 DOCKET NO.

Pilgrim I 04/13/82 DATE COMPL.eTED BY C.G. Whitney TELEPHONE 617-746-7900 MARCII, 1982 MONTH

~

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe Net) 0 1

37 o

2 0

gg n

0 3

39 0

~~

0 4

20 0

5 0

21 n

0 o

6 g

7 0

y n

3 n

24 n

9 0

3 n

10 n

'26 0

11 0

7 o

12 n

23 n

13 0

9 o

14 n

30 0

15 0

31 n

16 0

l I

INSTRUCTIONS l

On th:s format.!ist the average dady unit power level in MWe Net for each day in the reporung month. Campute to the :*earest whole megawatt.

(Q/77)

l REFUELING INFORMATION The following refueling inforrr.ation is included in the !!onthly Rep' ort as

~

requested in a letter to Mr. G. C. Andognini dated January 18, 1978:

For your convenience, the information supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.

1.

The name of this facility is Pilgrim Nuclear Power Station, Docket Number 50-293.

2.

Scheduled date for next Refueling Shutdown:

September, 1983 l

3.

Scheduled date for restart following refueling: November, 1983 4.

5.

Due to their similarity, requests 4, 5, & 6 are responded to collectively:

6.

The fuel, which had been loaded during the 1981 scheduled refueling outage, is of the same P8x_8R desi.gn, as loaded the previous outage con-sisting of 112 P8DRB282 assemblies and 60 P8DRB265 as'semblies.

7.

(a) There are 580 fuel assemblies in the core.

~

_(b) There are 936 fuel assemblies'in the speIt fuel pool.

~

8.

(a) The ctation is presently licensed to store 2320 spent fuel assemblies.

The actual spent fuel storage capacity is 1770 fuel assemblies at present.

(b) The planned spent fuel storage capacity is 2320 fuel assemblies.

9.

With present spent fuel in storage, the spent fuel pool now has the captcity to accommodate an additional 834 fuel assemblies.

4 e

A

~

1Tdlud2Nt2&Of91J N

J MARCH MAJOR SAFETY RELATED MAINTENANCE 1982 CORRECTIVE ACTION SYSTEM COMPONENT MALFUNCTION CAUSE MAINTENANCE TO PREVENT RECURRENCE ASSOCIATED L.

1 A, B, C, and D Solenoid Valves Installed Reinstalled Cor-Relief Valves Wrong rectly 9

3 CRD Insert and Hangers N/A P.M.

Replaced Hangers 82-005/01T-0 Withdrawal Piping 23

.RCIC Turbine N/A P.M.

Insert & Withdra-wal - Set over-speed trip 23 MOV 2301-8 Would Not Ope'n Missing Installed TS TS Jumper Jumper 82-008/01T-0 23 P223 P223 Trip Megger No Action Taken To Low 1

MOV 220-1 Would Not Open Broken Replaced Torque Switch 1

MOV 220-2 Would Not Open Loose Replaced Brushes Torque Switch 46 Vital Recirc MG Inop Adjusted Door Door Interlocks Stripping 6

"B" Feed Pump Tripped Bad Replaced Motor Aux. Oil Bearing 10 MOV 1001-50 Tripped Checked Logic of RHR & Related Systems 10 MOV 1001-60 Tripped Checked Logic of RHR & Related Systems 14 1400-6A 66B No Indicator Built new Bracket

.3 Lights Replaced Cable

  • 4 UNil SilUIDOWNS AND POWER REDUCIlONS DOCKET NO.

50-293 UNIT NAME Pilgrim I DATE nAfit/97 COMPLETED BY C G Whienev REPORT MONIll March. 1982 TELErilONE 617-746-7900 I

me S 't c

r.

3:

~.

.2 _e E

> E ;1 1.icensee ce c

Cause & Conective a

No.

Dite g

3g g

jg5 Event 5 ',2 01 Action to

$6 5

j5g Report #

@G fu Present Recurrence 6

18 81/09/26 S

744.0 C

2 N/A RC FUELXX Refuel / Modification Outage I

2 3

4 F: Forced Reason:

Method:

Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for I.icensee C Refueling 3 Automatic Scram.

Event Report (1.ER) File (NUREG.

D Regulatory Restriction 4-Ot her (Explain) 0161)

E-Operator Training & Eicense Examination F-Administrative 5

G4)perational Error (lixplain)

Eshibit i. Same Source pl/77)

II Other (Explain)