ML20052G022

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 820413-15
ML20052G022
Person / Time
Site: Cook  
Issue date: 04/27/1982
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20052G017 List:
References
50-315-82-07, 50-315-82-7, 50-316-82-07, 50-316-82-7, NUDOCS 8205140241
Download: ML20052G022 (1)


Text

-.

Appendix NOTICE OF VIOLATION American Electric Power Service Docket No. 50-315 Corporation Docket No. 50-316-As a result of the inspection conducted on April 13-15, 1982, and in-dcCordance with the Interim Enforcement Policy, 47 FR.9987.(March 9, 1982), the following violation was identified:

10 CFR 50, Appendix B, Criterion III, states, in part,_that " Measures shall be established to assure that applicable regulatory requirements and the design basis...as specified in the license application, for those structures, systems, and components...are correctly translated into specifications, drawings,. procedures, and instructions." " Measures shall be sstablished for i

the identification and control of_ design interfaces and for coordination among participating design organizations."

The Donald C. Cook Nuclear Plant FSAR Section 1.7.3 incorporates the above 3

10 CFR 50,_ Appendix B requirements and states, in part, that " Design reviews within...AEPSC areas of responsibility covered such items as stress, hydraulic, seismic and accident analysis."

Contrary to the above requirements, AEPSC had not prepared a design speci-fication for the engineering companies performing IEB 79-14 work. 'In addition, Associate Technologies, Inc. was performing IEB 79-14 work in accordance with a QA Manual and work procedures that did not meet AEPSC-program requirements.

Further the licensee had not' performed a design surveillance or audit of Associate Technologies, Inc..

This is a Severity Level V violation (Supplement II).

r Pursuant to the provisions of 10 CFR 2.201, you are required to submit to-this office within thirty days of the date of this Notice a written state-ment or explanation in reply, including for each item of noncompliance:

(1) corrective ahtlon taken and the results achieved; (2) corrective action to be taken to avoid further. noncompliance; and (3) the date when full com-pliance will be achieved. Consideration may be given to extending your response time for good cause shown.

)

./

Dated

~

' 67 W. S. Little, Chief Engineering Inspection Branch 8205140241 820427 PDR ADOCK 05000315 G

PDR

_.., _. _. _ - _ - - _ - ~..