m 7
l a
i Change 'ECM 862 Rev 0, 1 and 3 - 1981 Change l
Description These changes disconnected and removed nuclear sample lines and associated components between Unit I and II.
The removal was done under NRC order.
Electrical changes were made to ensure that valves remain in closed positions.
i 4
Safety Evaluation Summary i
The removal of sample' lines between Units I-and II does not affect nuclear safety in that all open lines are valved shut and capped and all valves are-red tagged shut. This eliminates the possibility of any releases from the disconnected lines. -Nuclear sampling is unaffected in Unit I and alternate 1
sampling paths are available in Unit II.
The removal of lines does'not create a situation outside the bounds of any previous analysis. Therefore, 2-the change does not create.an unreviewed safety question.
1 Change ECM 5884 Rev 0 - 1981 Change 4 -
[
Description This change installed tie down racks for-the nitrogen bottles for the SPC system.
j Safety Evaluation Summary l
This change was previously reviewed and approved by the on-site NRC staff.-
j Securing the nitrogen tanks reduces the potential for damage or injury that l
was created previously when the tanks were installed.
i t