Resolution Agreement Wherein Util Commits to Listed Steps Re Turbine Insp.Shoreham Opponents Coalition Will No Longer Pursue Contention 19(j).Agreement Executed by Licensee Only. Certificate of Svc Encl
ML20052E525
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 05/03/1982
From: Reveley W
HUNTON & WILLIAMS, LONG ISLAND LIGHTING CO.
To:
References
ISSUANCES-OL, NUDOCS 8205110203
Download: ML20052E525 (5)


Text

!

eg- CC: E~ ~

Q"~

w UhITED STA'IES OF AMERICA 'g2 lgy -7 M) M5 NOCLEAR REGULATORY COMMISSION t ?? .

Before the Atomic Safety and Licensing boa'Y$' .. .',E j .

In the Matter of )

) p 1:

LONG ISLAND LIGHTING COMPANY ) Docket No. 50 Q,

) &

(Shoreham Nuclear Power Station, )

Unit g

.L ) ) 9-St.C gggO 1%5 g# e50 m, Resolution of Shoreham Opponents 5 ${h Coalition Contention 19(j), 9 '

Turbine Orientation, dpon LILCO's oi t-Agreement to Satisfy SOC's Concerns Shoreham Opponents coalition (SOC) Contention 19(3) con-cerns the adequacy of Long Island Lighting Company's (L1LCO's) protection against low-trajectory turbine missiles. DOC has argueo that LILCG's turbine orientation is unf t.vorable with respect to saf ety-relacea structures.

Following the April 13, 1982 filing of airec testimony on SOC 19(j), SOC and LILCO have discussed certain comniitments that LILCO is willing to make to satisfy SOC's concerns about turbine missiles. By this Resolution Agreement, LILCO commits to certain steps, described below, regarding turbine inspec-tions. Based upon LILCO's agreement to take these steps, SCC no longer wishes to pursue SOC 19(j), and SOC and LILCO will i

jointly urge the Licensing Board to terminate further litiga-tion of SOC 19(j).

b c)e s

\

8205110203 820503 PDR ADOCK 05000322 g PDR

.. .. . c- . -

_a , . . .

.M s-SOC will withdraw its testimony on Contention 19(j) and LILCO will include the following conaitions and requirements in the Shoreham Technical Specifications in the section entitleo

" Limiting Conaitions for Operations and Surveillance Requirements , Part 3/4. 7.10, Main Turbine Bypass System":

(a) Limiting conoitions for operation 3.4.7.10(a) -- The main turbine control system shall be operable for operation conditions one and two (power and startup).

(b) Surveillance Requirements (1) 4.4.7.10ta) -- The main steam turbine stop and control valves ano the combined intermeaiate valves will be exercised daily. During this procecure, the valves will be tested fully closed by sequence testing. Weekly tests will also be performed on these valves to observe travel of the valve stems and link-age locally. Mechanical ano electrical backup over-speed trip tests will be perrormed weekly while l carrying load and without tripping the unit by using i special test provisions.

(2) Integrity of the turbine rotor shall be aemon-stratea by requiring:

(a) Complete visual inspection and magnetic parti-cle tests of all external surfaces at each outage the rotor is exposed. ~

l

4 (b) Extensive ultrasonic testing of the shrunk-on wheels, wheel bores, and keyway surtaces at six-year intervals.

(3) If the recommendea frequency of these inspec-tions and tests is modified by the turbine manufacturer, appropriate changes shall be made to the above requirements.

SUC concurs in this Resolution Agreement.

Respectfully submitteo, W. Taylo Revdley, 111 r Hunton & hilliams P.O. Box 1535 Richmond, Virginia 23212 DATED: May 3, 1982 l

l t

2 N%I.T In the Matter of LONG ISLAND LIGHTING COMPANY (Shoreham Nuclear Power Station, Unit 1) 82 MAY -7 A11 :.15 Docket No. 50-322 (OL)

CERTIFICATE OF SERVICE d.

I hereby certify tnat service has been mace tnis date by deposit in the U.S. Mail, first class, postage prepaid, or By Hand (*) of copies of Resolution of Shoreham Opponents Coalition Contention 19(j), Turbine Orientation, Upon LILCO's Agreement to Satisfy SGC's Concerns on each or the following people this third of May, 1982:

i Lawrence Brenner, Esq.* Atomic Safety ano Licensing Administrative Judge Appeal Board Panel Atomic Safety and Licensing U.S. Nuclear Regulatory Board Panel Commission U.S. Nuclear Reg ulatory hashington, C.C. 20555 Commission Washington, D.C. 20555 Atomic Safety ano Licensing Board Panel Dr. Peter A. Morris

  • U.b. Nuclear hegulatory Aaministrative Juoge Commission Atomic Safety and Licensing Washington, D.C. 20555 Boaro Panel U.S. Nuclear Regulatory Bernard M. Bordenick, Esq.*

i Commission David a. Repka, Esq.

Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Dr. James H. Carpenter

  • Washington, D.C. 20555 Administrative Judge Atomic Safety and Licensing David J. Gilmartin, Esq.

Boarc Panel Attn: Patricia A. Dempsey, Esq.

U.S. Nuclear Regulatory County Attorney l Commission Suffolk County Department of Law i Washington, D.C. 20555 Veterans Memorial Highway l Hauppauge, New York 11787 i

Secretary of the Commission f U.S. Nuclear Regulatory l Commission Washington, D.C. 20555 i

l l

Herbcrt H. Brown, Esq.* Howard L. Blau, Esq.

Lawrence Coe Lanpher, Esq. 217 Newbridge Road Karla J. Letsche, Esq. Hicksville, New York 11b01 Kirkpatrick, Lockhart, Hill, Christopher & Phillips Matthew J. Kelly, Esq.

8th Floor New York State Energy Office 1900 M Street, N.W. Agency Building 2 Washington, D.C. 20036 Empire State Plaza Albany, New York 12223 Mr. Mark ". Goldsmith Energy Research Group Mr. Jay Dunkleberger 400-1 Totten Pond Road New York State Energy Office Waltham, Massachusetts 02154 Agency Building 2 Empire State Plaza MHB Technical Associates Albany, New York 12223 1723 Hamilton Avenue Suite K San Jose, California 95125 Stephen E. Latham, Esq.

Twom ey , Latham & Shea 33 best Second Street P. O. Box 398 Riverhead, New York 11901 Ralph Shapiro, Esq.

Cammer and Shapiro, P.C.

9 East 40th Street New York, New York 10016

/-

h . [Ta or Reveley, 11 Hunton & Williaans 707 East Main Street P. O. Box 1535 Richmono, Virginia 23212 DATED: May 3, 1982 l

l l

_ _ _ _ ._ _ - _ - _